Frac jobs disclosed to FracFocus · activity through July 19, 2026 · published July 22, 2026
Frac jobs, last 28 days
117
Jun 22 – Jul 19, 2026
New Mexico / Texas split
65 / 52
56% of jobs in NM
Avg water per job
543,000 bbl
n = 117 jobs reporting
Avg proppant per job
24,730,000 lbs
n = 103 jobs reporting
Produced / recycled water
0%
of frac water volume · 67 of 117 jobs report source
Federal wells
44
38% of last-28-day jobs
Weekly frac job count — trailing 13 weeks
By job end date. Faded columns are recent weeks still filling in — operators have up to ~30 days to file, so the newest weeks always start low and grow.
83
4/26
109
5/3
89
5/10
59
5/17
74
5/24
52
5/31
35
6/7
74
6/14
59
6/21
35
6/28
31
7/5
32
7/12
19
7/19
TexasNew MexicoReporting still filling in
Most active operators
Bar & big number = settled pace (wells/28d from the last 3 fully-reported months);
gray number = jobs filed in the last 28 days. Operators marked · / ·· file disclosures moderately /
slowly (ExxonMobil files 60–90 days behind the frac), so recent filings alone understate them.
Devon (incl. Coterra)
56
50
ExxonMobil (Pioneer/XTO) ··
52
5
Diamondback ··
41
0
Occidental ··
39
6
EOG Resources ·· (reports thru Dec 2025)
23
0
Mewbourne Oil ··
22
3
Permian Resources ·
21
8
Apache ··
18
0
SM Energy (incl. Civitas) ·
15
6
Chevron
13
13
Matador Production
10
8
BPX ··
9
0
Petro Hunt, L.L.C. ·· (reports thru Mar 2026)
9
0
Activity by county
Jobs ended in last 28 days
Lea, NM
39
Eddy, NM
24
Loving, TX
11
Midland, TX
10
Culberson, TX
7
Reeves, TX
7
Martin, TX
6
Irion, TX
4
Crane, TX
3
Chaves, NM
2
Upton, TX
2
Glasscock, TX
1
Ector, TX
1
Completion pipeline — New Mexico (work coming to a pad near you)
From NM OCD well records, horizontal wells in Lea / Eddy / Chaves / Roosevelt:
8,270 approved permits not yet spudded (the drilling backlog — includes some older
unexercised permits) and 1,041 wells spudded 2023+ with no FracFocus disclosure yet —
drilled or drilling, not yet frac'd (some are mid-completion or awaiting the operator's disclosure filing),
of which 235 were spudded in the last 90 days — the wells hitting frac schedules next.
Every well in the drilled column needs a frac crew and a drillout. Texas permit pipeline (RRC W-1 files)
is the next data source to wire in.
Operator
Permits (unspudded)
Drilled, not yet frac'd
Spudded last 90d
Top county
Devon (incl. Coterra)
2,497
128
34
Lea
EOG Resources
913
252
23
Lea
Permian Resources
716
92
28
Eddy
Mewbourne Oil
719
67
30
Eddy
Matador Production
662
46
35
Lea
Occidental
466
29
9
Eddy
ConocoPhillips (incl. Marathon)
409
1
0
Eddy
ExxonMobil (Pioneer/XTO)
270
139
1
Eddy
Chevron
258
80
20
Eddy
Spur Energy Partners
145
93
16
Eddy
Riley Permian
177
14
6
Eddy
BTA Oil Producers
155
4
3
Lea
SM Energy (incl. Civitas)
140
7
0
Lea
Novo Oil & Gas
109
11
0
Eddy
3R Operating
103
8
4
Eddy
Kaiser-Francis Oil Co
75
7
3
Lea
Completion pipeline — Texas permit backlog
From the RRC drilling permit master (current through early July): 5,404 approved
horizontal permits issued since Jan 2024, not yet spudded or completed, in the 35 Permian counties.
Texas receives spud dates late (typically with completion filings), so a drilled-not-yet-frac'd column
isn't reliably possible from TX public data — the NM table above is the timelier read on that stage.
Operator
Permits (unspudded)
Top county
Diamondback
629
Midland
Pioneer (ExxonMobil)
576
Midland
Anadarko E&P Onshore Llc
215
Loving
Ovintiv
192
Martin
Apache
184
Upton
Coterra
180
Upton
DE Central
146
Reagan
Oxy Usa Inc.
145
Gaines
Continental Resources, Inc
134
Midland
Blackbeard
129
Crane
Civitas
111
Upton
OxyRock
108
Glasscock
Permian Resources
101
Reeves
Kinder Morgan Production Co Llc
98
Pecos
Smaller operators to watch
Everyone outside the top 10 with 6+ completions since March 1 (24 operators) —
the private and mid-cap programs that don't make headlines but buy sand, water, and services every month.
Entities reflect current ownership (e.g., Double Eagle's retained DE Central position; Tap Rock's NM wells
now under Jonah Energy).
Operator
Jobs Mar–Jul
Top counties
Service co. (ID'd)
Median water (bbl)
BPX
30
Reeves, TX, Loving, TX
Halliburton
419,000
VTX Energy
26
Reeves, TX
NexTier (Patterson-UTI)
618,000
FireBird Energy II
25
Upton, TX, Ector, TX
—
491,000
Ovintiv
24
Martin, TX, Upton, TX
—
619,000
Spur Energy Partners
21
Eddy, NM
Halliburton
286,000
Blue Arrow
18
Reeves, TX, Pecos, TX
NexTier (Patterson-UTI)
635,000
Admiral Resources
18
Loving, TX, Eddy, NM
—
478,000
Continental Resources, Inc
15
Ward, TX, Ector, TX
BJ Energy
543,000
Summit Petroleum
15
Upton, TX
—
657,000
BTA Oil Producers
14
Crane, TX, Lea, NM
—
656,000
Double Eagle (DE Central)
13
Glasscock, TX, Reagan, TX
NexTier (Patterson-UTI)
532,000
Fasken Oil and Ranch, Ltd.
12
Andrews, TX, Midland, TX
—
514,000
Petroplex Energy
11
Borden, TX
NexTier (Patterson-UTI)
1,040,000
Kaiser-Francis Oil
11
Lea, NM
Liberty
459,000
Petro Hunt, L.L.C.
10
Loving, TX
Liberty
363,000
PBEX Operations
8
Ward, TX, Dawson, TX
—
616,000
Bayswater Exploration & Production
8
Mitchell, TX
—
446,000
STRATA PRODUCTION COMPANY
8
Eddy, NM, Lea, NM
—
56,000
3R OPERATING
7
Lea, NM, Eddy, NM
Liberty
378,000
Sabalo II
7
Andrews, TX
—
496,000
Ring Energy
6
Yoakum, TX, Andrews, TX
—
181,000
Surge
6
Borden, TX
NexTier (Patterson-UTI)
423,000
Basin Oil and Gas
6
Winkler, TX, Terry, TX
—
4,000
TRP
6
Loving, TX
—
527,000
Completion intensity by operator
Median job design over each operator's own most recent 90 reported days — dark filers
(e.g., EOG, whose disclosures stop in Dec 2025) appear at last-reported design rather than vanishing ·
operators with ≥8 jobs reporting water · "n/d" = proppant mass not disclosed (EOG reports water volumes
but not sand mass) · basin median sand concentration 1.07 lbs/gal
Operator
Jobs
Median water (bbl)
Median proppant (lbs)
Sand conc. (lbs/gal)
Devon (incl. Coterra)
180
520,000
24,928,000
1.18
Diamondback
108
524,000
20,630,000
0.94
Occidental
94
509,000
25,800,000
1.22
ExxonMobil (Pioneer/XTO)
74
626,000
32,865,000
1.27
EOG Resources (reports thru Dec 2025)
73
517,000
n/d
n/d
Apache
59
477,000
22,584,000
0.98
Permian Resources
50
532,000
23,460,000
1.09
Chevron
41
442,000
22,491,000
1.11
SM Energy (incl. Civitas)
40
533,000
24,291,000
1.09
Mewbourne Oil
35
668,000
28,638,000
0.94
Matador Production
31
756,000
35,144,000
1.08
BPX
30
402,000
18,470,000
1.06
Petro Hunt, L.L.C. (reports thru Mar 2026)
28
362,000
16,315,000
1.07
Ovintiv
24
619,000
n/d
n/d
Water & sand by well depth (TVD)
Median job design by true vertical depth band — a rough proxy for target bench
(103 of 117 jobs report TVD, water, and proppant)
TVD band
Jobs
Median water (bbl)
Median proppant (lbs)
Sand conc. (lbs/gal)
< 7,500 ft
8
279,000
5,008,000
0.88
7,500 – 10,000 ft
52
529,000
24,966,000
1.12
10,000 – 12,000 ft
38
528,000
24,783,000
1.11
> 12,000 ft
5
522,000
24,418,000
1.11
FracFocus does not disclose target formation or
perforated-interval length. Formation names (Wolfcamp, Bone Spring, Spraberry…) and true per-lateral-foot
intensity (lbs/ft, bbl/ft) are planned additions via Texas RRC completion records and NM OCD pool data.
Water & sand by target formation
Jobs ended in last 28 days · formation resolved for 83 of 117 jobs by joining
state records (TX RRC wellbore filings, NM OCD pool assignments) by API number
Formation
Jobs
Median water (bbl)
Median proppant (lbs)
Sand conc. (lbs/gal)
Bone Spring
30
488,000
23,754,000
1.16
Wolfcamp
19
762,000
35,314,000
1.04
Seven Rivers
6
438,000
20,738,000
1.12
Delaware Mtn
3
625,000
27,170,000
1.04
Spraberry
3
556,000
23,766,000
1.08
Unreported
34
530,000
25,222,000
1.16
Per-lateral-foot intensity by formation
Jobs ended July 2025 – present with a completed-lateral length on file (1524 jobs).
State completion filings trail the frac by ~3–6 months, so this table reflects the settled record, not the
newest wells. TX lateral = perforated interval span (RRC); NM lateral = MD − TVD − 600 ft curve allowance (OCD).
Formation
Jobs
Median lateral (ft)
Proppant (lbs/ft)
Water (bbl/ft)
Spraberry
540
10,600
2,009
45.1
Wolfcamp
472
10,300
2,266
50.3
Dean
90
11,300
2,256
48.7
Bone Spring
82
10,200
2,473
49.9
Clear Fork
71
10,300
1,742
47.7
Grayburg
30
10,900
2,493
57.4
San Andres
27
10,400
1,799
45.4
Delaware Mtn
16
8,800
2,167
48.1
Queen
13
13,200
2,119
44.2
Avalon
8
15,800
2,226
41.8
Unreported
145
10,300
2,079
44.8
Current conditions — fleets likely on location (inferred)
Inferred from disclosure cadence: a pad whose latest job ended within ~1.5× its own
well-to-well pace is probably still being pumped or just finishing. 17 pads read as likely
active as of the latest filings (through Jul 19), 13 more
recently released. Disclosures lag the frac by up to 30 days, so this view sees roughly half of true live
activity — treat as a floor and a lead list, not a map. Pumper marked * is inferred from the operator's
dominant 2026 service company. Field confirmations will upgrade rows from "inferred" to "confirmed" in the
production version.
Status
Operator
Service co.
County
Pad
Wells so far
Last job end
🟢 Likely on location
SEM
—
Irion, TX
University
4
Jul 19
🟢 Likely on location
Devon (incl. Coterra)
Halliburton*
Loving, TX
Cbr
12
Jul 14
🟢 Likely on location
Devon (incl. Coterra)
Halliburton*
Loving, TX
Blue
3
Jul 13
🟢 Likely on location
Chevron
Halliburton
Midland, TX
Scharbauer
7
Jul 13
🟢 Likely on location
Blue Arrow
NexTier (Patterson-UTI)*
Reeves, TX
Stewart
1
Jul 13
🟢 Likely on location
Blue Arrow
NexTier (Patterson-UTI)*
Reeves, TX
Stewart 2-11 Unit
4
Jul 12
🟢 Likely on location
Ring Energy
—
Ector, TX
Millard -B-
1
Jul 12
🟢 Likely on location
VTX Energy
NexTier (Patterson-UTI)
Reeves, TX
Dik Dik
1
Jul 12
🟢 Likely on location
Devon (incl. Coterra)
Halliburton
Lea, NM
Big Iron 4-9 Fed Com
2
Jul 11
🟢 Likely on location
VTX Energy
NexTier (Patterson-UTI)
Reeves, TX
Meerkat State Unit
1
Jul 11
🟢 Likely on location
ExxonMobil (Pioneer/XTO)
Halliburton
Midland, TX
Marsh
3
Jul 9
🟢 Likely on location
Mewbourne Oil
NexTier (Patterson-UTI)*
Crane, TX
State Troubadour
2
Jul 4
🟢 Likely on location
Mewbourne Oil
NexTier (Patterson-UTI)*
Crane, TX
Alligator Gahr
1
Jul 4
🟢 Likely on location
Devon (incl. Coterra)
Halliburton*
Loving, TX
Pistol Pete
1
Jun 27
🟢 Likely on location
Occidental
Halliburton*
Glasscock, TX
Trenton
1
Jun 26
🟢 Likely on location
Devon (incl. Coterra)
Halliburton*
Lea, NM
Chincoteague 8-32 Fed Com
1
Jun 19
🟢 Likely on location
Sabalo II
—
Andrews, TX
Ul Kings Inn
1
Jun 14
⚪ Recently released
Devon (incl. Coterra)
Halliburton
Martin, TX
Mabee Dda
6
Jul 11
Frac service companies — who's pumping for whom
Pressure pumper identified on 69% of the last 12 months' jobs: from FracFocus
supplier records directly, plus two inference methods — chemical fingerprinting (pumper-specific product
trade names, e.g. proprietary friction reducers, validated on the directly-labeled jobs) and fleet
continuity (operator/county/month blocks dominated by one labeled pumper). Fleet-equivalents from each
pumper's observed pad pace over the last 90 days of reported jobs. "Not disclosed" jobs are genuinely
unidentifiable from public data — largely self-sourcing operators and ProPetro's current work (identifiable
only on pre-merger Endeavor filings) — so shares are a floor, not a census.
Apache, SM Energy (incl. Civitas), HighPeak Energy Holdings.
265 / 14
Midland, Andrews
SLB
45
0.1
Chevron, Devon (incl. Coterra)
26 / 19
Lea, Culberson
BJ Energy
41
0.1
Continental Resources, Inc, Circle-S Energy, U.S. Energy Development Corp
41 / 0
Ward, Ector
Not disclosed
1529
–
supplier not named on disclosure
–
–
Implied frac fleets & drillout demand
Fleet-equivalents = settled wells/28 days (last 3 fully-reported months, so slow filers
like ExxonMobil are counted at true pace — marked ·· ) × the operator's own observed pad pace (days per
well, multi-well pads) ÷ 28. This is an activity index, not a crew census — heavy simul-frac operators
turn pads faster than their pad-window suggests, so their true crew count runs lower. Implied drillout
units assume ~6 well drillouts per coil/workover unit per month. Basin total on this basis:
394 wells/28d ≈ 71 fleet-equivalents among operators with 4+ settled
wells/month. NM data shows a median 34 days from frac end to first production (p25 19 – p75 57) —
the drillout / cleanout / turn-in-line window.
Operator
Wells / 28d
Pad pace (days/well)
Implied fleet-equiv.
Implied drillout units
Devon (incl. Coterra)
56
4.8
9.6
9.3
ExxonMobil (Pioneer/XTO) ··
52
5.0
9.3
8.7
Diamondback ··
41
5.0
7.4
6.9
Occidental ··
39
5.1
7.1
6.5
EOG Resources ·· (reports thru Dec 2025)
23
2.8
2.3
3.8
Mewbourne Oil ··
22
3.0
2.4
3.7
Permian Resources ·
21
4.6
3.5
3.6
Apache ··
18
10.7
7.0
3.1
SM Energy (incl. Civitas) ·
15
3.4
1.8
2.5
Chevron
13
4.1
1.9
2.1
Matador Production
10
4.8
1.7
1.7
BPX ··
9
5.2
1.7
1.6
Petro Hunt, L.L.C. ·· (reports thru Mar 2026)
9
3.2
1.0
1.5
Ovintiv ··
7
10.7
2.8
1.2
Estimated completion spend — run-rate per 28 days
Modeled from each job's disclosed sand, water, water-source mix, and lateral. Basin total
from the last 3 fully-reported months: ≈ $1.91B per 28 days (1244 settled
jobs), incl. ≈ $187M proppant and ≈ $124M water.
Operator rows use each operator's own most recent 90 reported days, so slow and dark filers (ExxonMobil,
EOG) are counted at last-reported pace — stale data is flagged. Estimates, not invoices — see assumptions
below.
Operator
Jobs / 28d
Est. spend / 28d
Est. sand $
Est. water $
Devon (incl. Coterra)
56
$302M
$29.6M
$19.2M
Diamondback
34
$178M
$15.4M
$9.1M
Occidental
29
$154M
$16.4M
$13.8M
ExxonMobil (Pioneer/XTO)
23
$143M
$15.0M
$9.8M
EOG Resources (reports thru Dec 2025)
23
$117M
$11.4M
$10.9M
Apache
18
$88M
$8.4M
$4.4M
Permian Resources
16
$85M
$8.2M
$6.4M
SM Energy (incl. Civitas)
12
$63M
$5.9M
$5.0M
Mewbourne Oil
11
$62M
$6.0M
$3.2M
Matador Production
10
$62M
$6.2M
$3.2M
Chevron
13
$59M
$5.8M
$3.0M
Ovintiv
7
$43M
$4.1M
$4.0M
BPX
9
$38M
$3.7M
$1.9M
Assumptions (2026 Permian benchmarks + field
estimates): sand $39/ton delivered (field-verified 2026: 100 mesh ≈ $38.9, 40/70 regional ≈ $39.9); produced/recycled water $1.00/bbl all-in; fresh $0.32/bbl sourcing;
water transfer $0.13/bbl; pumping $50k/stage at 200-ft stage spacing; wireline & plugs $10k/stage;
chemicals $20/lateral-ft; drillout & flowback $300k/well. Operators that don't disclose proppant mass
(e.g., EOG) have sand estimated at the basin-median 1.10 lbs/gal of disclosed water.
Model back-tests at ≈$424/completed-ft on
settled wells, consistent with operator-reported D&C economics. AFEs are private; these are modeled
market estimates.
What the wells actually made — IP90 after the frac
Wells frac'd July 2024 – Feb 2026, 7735 with a clean 90-day production window.
New Mexico: true well-level oil volumes from OCD C-115 filings. Texas: oil + condensate from RRC
lease-level filings, allocated evenly across each pad's new wells, with legacy-producing leases excluded.
IP90 = average daily oil over the first three reported production months.