Permian Basin · Texas & New Mexico

Permian Completions Weekly

Frac jobs disclosed to FracFocus · activity through July 19, 2026 · published July 22, 2026
Frac jobs, last 28 days
117
Jun 22 – Jul 19, 2026
New Mexico / Texas split
65 / 52
56% of jobs in NM
Avg water per job
543,000 bbl
n = 117 jobs reporting
Avg proppant per job
24,730,000 lbs
n = 103 jobs reporting
Produced / recycled water
0%
of frac water volume · 67 of 117 jobs report source
Federal wells
44
38% of last-28-day jobs

Weekly frac job count — trailing 13 weeks

By job end date. Faded columns are recent weeks still filling in — operators have up to ~30 days to file, so the newest weeks always start low and grow.
83
4/26
109
5/3
89
5/10
59
5/17
74
5/24
52
5/31
35
6/7
74
6/14
59
6/21
35
6/28
31
7/5
32
7/12
19
7/19
Texas New Mexico Reporting still filling in

Most active operators

Bar & big number = settled pace (wells/28d from the last 3 fully-reported months); gray number = jobs filed in the last 28 days. Operators marked · / ·· file disclosures moderately / slowly (ExxonMobil files 60–90 days behind the frac), so recent filings alone understate them.
Devon (incl. Coterra)
56
50
ExxonMobil (Pioneer/XTO) ··
52
5
Diamondback ··
41
0
Occidental ··
39
6
EOG Resources ·· (reports thru Dec 2025)
23
0
Mewbourne Oil ··
22
3
Permian Resources ·
21
8
Apache ··
18
0
SM Energy (incl. Civitas) ·
15
6
Chevron
13
13
Matador Production
10
8
BPX ··
9
0
Petro Hunt, L.L.C. ·· (reports thru Mar 2026)
9
0

Activity by county

Jobs ended in last 28 days
Lea, NM
39
Eddy, NM
24
Loving, TX
11
Midland, TX
10
Culberson, TX
7
Reeves, TX
7
Martin, TX
6
Irion, TX
4
Crane, TX
3
Chaves, NM
2
Upton, TX
2
Glasscock, TX
1
Ector, TX
1

Completion pipeline — New Mexico (work coming to a pad near you)

From NM OCD well records, horizontal wells in Lea / Eddy / Chaves / Roosevelt: 8,270 approved permits not yet spudded (the drilling backlog — includes some older unexercised permits) and 1,041 wells spudded 2023+ with no FracFocus disclosure yet — drilled or drilling, not yet frac'd (some are mid-completion or awaiting the operator's disclosure filing), of which 235 were spudded in the last 90 days — the wells hitting frac schedules next. Every well in the drilled column needs a frac crew and a drillout. Texas permit pipeline (RRC W-1 files) is the next data source to wire in.
OperatorPermits (unspudded) Drilled, not yet frac'dSpudded last 90dTop county
Devon (incl. Coterra)2,497 12834 Lea
EOG Resources913 25223 Lea
Permian Resources716 9228 Eddy
Mewbourne Oil719 6730 Eddy
Matador Production662 4635 Lea
Occidental466 299 Eddy
ConocoPhillips (incl. Marathon)409 10 Eddy
ExxonMobil (Pioneer/XTO)270 1391 Eddy
Chevron258 8020 Eddy
Spur Energy Partners145 9316 Eddy
Riley Permian177 146 Eddy
BTA Oil Producers155 43 Lea
SM Energy (incl. Civitas)140 70 Lea
Novo Oil & Gas109 110 Eddy
3R Operating103 84 Eddy
Kaiser-Francis Oil Co75 73 Lea

Completion pipeline — Texas permit backlog

From the RRC drilling permit master (current through early July): 5,404 approved horizontal permits issued since Jan 2024, not yet spudded or completed, in the 35 Permian counties. Texas receives spud dates late (typically with completion filings), so a drilled-not-yet-frac'd column isn't reliably possible from TX public data — the NM table above is the timelier read on that stage.
OperatorPermits (unspudded)Top county
Diamondback629Midland
Pioneer (ExxonMobil)576Midland
Anadarko E&P Onshore Llc215Loving
Ovintiv192Martin
Apache184Upton
Coterra180Upton
DE Central146Reagan
Oxy Usa Inc.145Gaines
Continental Resources, Inc134Midland
Blackbeard129Crane
Civitas111Upton
OxyRock108Glasscock
Permian Resources101Reeves
Kinder Morgan Production Co Llc98Pecos

Smaller operators to watch

Everyone outside the top 10 with 6+ completions since March 1 (24 operators) — the private and mid-cap programs that don't make headlines but buy sand, water, and services every month. Entities reflect current ownership (e.g., Double Eagle's retained DE Central position; Tap Rock's NM wells now under Jonah Energy).
OperatorJobs Mar–JulTop counties Service co. (ID'd)Median water (bbl)
BPX30 Reeves, TX, Loving, TXHalliburton419,000
VTX Energy26 Reeves, TXNexTier (Patterson-UTI)618,000
FireBird Energy II25 Upton, TX, Ector, TX491,000
Ovintiv24 Martin, TX, Upton, TX619,000
Spur Energy Partners21 Eddy, NMHalliburton286,000
Blue Arrow18 Reeves, TX, Pecos, TXNexTier (Patterson-UTI)635,000
Admiral Resources18 Loving, TX, Eddy, NM478,000
Continental Resources, Inc15 Ward, TX, Ector, TXBJ Energy543,000
Summit Petroleum15 Upton, TX657,000
BTA Oil Producers14 Crane, TX, Lea, NM656,000
Double Eagle (DE Central)13 Glasscock, TX, Reagan, TXNexTier (Patterson-UTI)532,000
Fasken Oil and Ranch, Ltd.12 Andrews, TX, Midland, TX514,000
Petroplex Energy11 Borden, TXNexTier (Patterson-UTI)1,040,000
Kaiser-Francis Oil11 Lea, NMLiberty459,000
Petro Hunt, L.L.C.10 Loving, TXLiberty363,000
PBEX Operations8 Ward, TX, Dawson, TX616,000
Bayswater Exploration & Production8 Mitchell, TX446,000
STRATA PRODUCTION COMPANY8 Eddy, NM, Lea, NM56,000
3R OPERATING7 Lea, NM, Eddy, NMLiberty378,000
Sabalo II7 Andrews, TX496,000
Ring Energy6 Yoakum, TX, Andrews, TX181,000
Surge6 Borden, TXNexTier (Patterson-UTI)423,000
Basin Oil and Gas6 Winkler, TX, Terry, TX4,000
TRP6 Loving, TX527,000

Completion intensity by operator

Median job design over each operator's own most recent 90 reported days — dark filers (e.g., EOG, whose disclosures stop in Dec 2025) appear at last-reported design rather than vanishing · operators with ≥8 jobs reporting water · "n/d" = proppant mass not disclosed (EOG reports water volumes but not sand mass) · basin median sand concentration 1.07 lbs/gal
OperatorJobsMedian water (bbl) Median proppant (lbs)Sand conc. (lbs/gal)
Devon (incl. Coterra)180 520,00024,928,000 1.18
Diamondback108 524,00020,630,000 0.94
Occidental94 509,00025,800,000 1.22
ExxonMobil (Pioneer/XTO)74 626,00032,865,000 1.27
EOG Resources (reports thru Dec 2025)73 517,000n/d n/d
Apache59 477,00022,584,000 0.98
Permian Resources50 532,00023,460,000 1.09
Chevron41 442,00022,491,000 1.11
SM Energy (incl. Civitas)40 533,00024,291,000 1.09
Mewbourne Oil35 668,00028,638,000 0.94
Matador Production31 756,00035,144,000 1.08
BPX30 402,00018,470,000 1.06
Petro Hunt, L.L.C. (reports thru Mar 2026)28 362,00016,315,000 1.07
Ovintiv24 619,000n/d n/d

Water & sand by well depth (TVD)

Median job design by true vertical depth band — a rough proxy for target bench (103 of 117 jobs report TVD, water, and proppant)
TVD bandJobsMedian water (bbl) Median proppant (lbs)Sand conc. (lbs/gal)
< 7,500 ft8 279,000 5,008,000 0.88
7,500 – 10,000 ft52 529,000 24,966,000 1.12
10,000 – 12,000 ft38 528,000 24,783,000 1.11
> 12,000 ft5 522,000 24,418,000 1.11
FracFocus does not disclose target formation or perforated-interval length. Formation names (Wolfcamp, Bone Spring, Spraberry…) and true per-lateral-foot intensity (lbs/ft, bbl/ft) are planned additions via Texas RRC completion records and NM OCD pool data.

Water & sand by target formation

Jobs ended in last 28 days · formation resolved for 83 of 117 jobs by joining state records (TX RRC wellbore filings, NM OCD pool assignments) by API number
FormationJobsMedian water (bbl) Median proppant (lbs)Sand conc. (lbs/gal)
Bone Spring30 488,000 23,754,000 1.16
Wolfcamp19 762,000 35,314,000 1.04
Seven Rivers6 438,000 20,738,000 1.12
Delaware Mtn3 625,000 27,170,000 1.04
Spraberry3 556,000 23,766,000 1.08
Unreported34 530,000 25,222,000 1.16

Per-lateral-foot intensity by formation

Jobs ended July 2025 – present with a completed-lateral length on file (1524 jobs). State completion filings trail the frac by ~3–6 months, so this table reflects the settled record, not the newest wells. TX lateral = perforated interval span (RRC); NM lateral = MD − TVD − 600 ft curve allowance (OCD).
FormationJobsMedian lateral (ft) Proppant (lbs/ft)Water (bbl/ft)
Spraberry540 10,600 2,009 45.1
Wolfcamp472 10,300 2,266 50.3
Dean90 11,300 2,256 48.7
Bone Spring82 10,200 2,473 49.9
Clear Fork71 10,300 1,742 47.7
Grayburg30 10,900 2,493 57.4
San Andres27 10,400 1,799 45.4
Delaware Mtn16 8,800 2,167 48.1
Queen13 13,200 2,119 44.2
Avalon8 15,800 2,226 41.8
Unreported145 10,300 2,079 44.8

Current conditions — fleets likely on location (inferred)

Inferred from disclosure cadence: a pad whose latest job ended within ~1.5× its own well-to-well pace is probably still being pumped or just finishing. 17 pads read as likely active as of the latest filings (through Jul 19), 13 more recently released. Disclosures lag the frac by up to 30 days, so this view sees roughly half of true live activity — treat as a floor and a lead list, not a map. Pumper marked * is inferred from the operator's dominant 2026 service company. Field confirmations will upgrade rows from "inferred" to "confirmed" in the production version.
StatusOperatorService co.CountyPad Wells so farLast job end
🟢 Likely on locationSEM Irion, TXUniversity 4Jul 19
🟢 Likely on locationDevon (incl. Coterra) Halliburton*Loving, TXCbr 12Jul 14
🟢 Likely on locationDevon (incl. Coterra) Halliburton*Loving, TXBlue 3Jul 13
🟢 Likely on locationChevron HalliburtonMidland, TXScharbauer 7Jul 13
🟢 Likely on locationBlue Arrow NexTier (Patterson-UTI)*Reeves, TXStewart 1Jul 13
🟢 Likely on locationBlue Arrow NexTier (Patterson-UTI)*Reeves, TXStewart 2-11 Unit 4Jul 12
🟢 Likely on locationRing Energy Ector, TXMillard -B- 1Jul 12
🟢 Likely on locationVTX Energy NexTier (Patterson-UTI)Reeves, TXDik Dik 1Jul 12
🟢 Likely on locationDevon (incl. Coterra) HalliburtonLea, NMBig Iron 4-9 Fed Com 2Jul 11
🟢 Likely on locationVTX Energy NexTier (Patterson-UTI)Reeves, TXMeerkat State Unit 1Jul 11
🟢 Likely on locationExxonMobil (Pioneer/XTO) HalliburtonMidland, TXMarsh 3Jul 9
🟢 Likely on locationMewbourne Oil NexTier (Patterson-UTI)*Crane, TXState Troubadour 2Jul 4
🟢 Likely on locationMewbourne Oil NexTier (Patterson-UTI)*Crane, TXAlligator Gahr 1Jul 4
🟢 Likely on locationDevon (incl. Coterra) Halliburton*Loving, TXPistol Pete 1Jun 27
🟢 Likely on locationOccidental Halliburton*Glasscock, TXTrenton 1Jun 26
🟢 Likely on locationDevon (incl. Coterra) Halliburton*Lea, NMChincoteague 8-32 Fed Com 1Jun 19
🟢 Likely on locationSabalo II Andrews, TXUl Kings Inn 1Jun 14
⚪ Recently releasedDevon (incl. Coterra) HalliburtonMartin, TXMabee Dda 6Jul 11

Frac service companies — who's pumping for whom

Pressure pumper identified on 69% of the last 12 months' jobs: from FracFocus supplier records directly, plus two inference methods — chemical fingerprinting (pumper-specific product trade names, e.g. proprietary friction reducers, validated on the directly-labeled jobs) and fleet continuity (operator/county/month blocks dominated by one labeled pumper). Fleet-equivalents from each pumper's observed pad pace over the last 90 days of reported jobs. "Not disclosed" jobs are genuinely unidentifiable from public data — largely self-sourcing operators and ProPetro's current work (identifiable only on pre-merger Endeavor filings) — so shares are a floor, not a census.
Service co.Jobs (12 mo)Fleet-equiv. (90d) Top customersTX / NMTop counties
Halliburton141914.9 Diamondback, Devon (incl. Coterra), Occidental1080 / 339Martin, Midland
NexTier (Patterson-UTI)9196.6 Mewbourne Oil, ExxonMobil (Pioneer/XTO), Devon (incl. Coterra)569 / 350Eddy, Reagan
Liberty7375.1 ExxonMobil (Pioneer/XTO), Occidental, Devon (incl. Coterra)288 / 449Eddy, Lea
ProFrac2793.7 Apache, SM Energy (incl. Civitas), HighPeak Energy Holdings.265 / 14Midland, Andrews
SLB450.1 Chevron, Devon (incl. Coterra)26 / 19Lea, Culberson
BJ Energy410.1 Continental Resources, Inc, Circle-S Energy, U.S. Energy Development Corp41 / 0Ward, Ector
Not disclosed 1529 supplier not named on disclosure

Implied frac fleets & drillout demand

Fleet-equivalents = settled wells/28 days (last 3 fully-reported months, so slow filers like ExxonMobil are counted at true pace — marked ·· ) × the operator's own observed pad pace (days per well, multi-well pads) ÷ 28. This is an activity index, not a crew census — heavy simul-frac operators turn pads faster than their pad-window suggests, so their true crew count runs lower. Implied drillout units assume ~6 well drillouts per coil/workover unit per month. Basin total on this basis: 394 wells/28d ≈ 71 fleet-equivalents among operators with 4+ settled wells/month. NM data shows a median 34 days from frac end to first production (p25 19 – p75 57) — the drillout / cleanout / turn-in-line window.
OperatorWells / 28dPad pace (days/well) Implied fleet-equiv.Implied drillout units
Devon (incl. Coterra) 56 4.89.6 9.3
ExxonMobil (Pioneer/XTO) ·· 52 5.09.3 8.7
Diamondback ·· 41 5.07.4 6.9
Occidental ·· 39 5.17.1 6.5
EOG Resources ·· (reports thru Dec 2025) 23 2.82.3 3.8
Mewbourne Oil ·· 22 3.02.4 3.7
Permian Resources · 21 4.63.5 3.6
Apache ·· 18 10.77.0 3.1
SM Energy (incl. Civitas) · 15 3.41.8 2.5
Chevron 13 4.11.9 2.1
Matador Production 10 4.81.7 1.7
BPX ·· 9 5.21.7 1.6
Petro Hunt, L.L.C. ·· (reports thru Mar 2026) 9 3.21.0 1.5
Ovintiv ·· 7 10.72.8 1.2

Estimated completion spend — run-rate per 28 days

Modeled from each job's disclosed sand, water, water-source mix, and lateral. Basin total from the last 3 fully-reported months: ≈ $1.91B per 28 days (1244 settled jobs), incl. ≈ $187M proppant and ≈ $124M water. Operator rows use each operator's own most recent 90 reported days, so slow and dark filers (ExxonMobil, EOG) are counted at last-reported pace — stale data is flagged. Estimates, not invoices — see assumptions below.
OperatorJobs / 28dEst. spend / 28d Est. sand $Est. water $
Devon (incl. Coterra)56 $302M$29.6M $19.2M
Diamondback34 $178M$15.4M $9.1M
Occidental29 $154M$16.4M $13.8M
ExxonMobil (Pioneer/XTO)23 $143M$15.0M $9.8M
EOG Resources (reports thru Dec 2025)23 $117M$11.4M $10.9M
Apache18 $88M$8.4M $4.4M
Permian Resources16 $85M$8.2M $6.4M
SM Energy (incl. Civitas)12 $63M$5.9M $5.0M
Mewbourne Oil11 $62M$6.0M $3.2M
Matador Production10 $62M$6.2M $3.2M
Chevron13 $59M$5.8M $3.0M
Ovintiv7 $43M$4.1M $4.0M
BPX9 $38M$3.7M $1.9M
Assumptions (2026 Permian benchmarks + field estimates): sand $39/ton delivered (field-verified 2026: 100 mesh ≈ $38.9, 40/70 regional ≈ $39.9); produced/recycled water $1.00/bbl all-in; fresh $0.32/bbl sourcing; water transfer $0.13/bbl; pumping $50k/stage at 200-ft stage spacing; wireline & plugs $10k/stage; chemicals $20/lateral-ft; drillout & flowback $300k/well. Operators that don't disclose proppant mass (e.g., EOG) have sand estimated at the basin-median 1.10 lbs/gal of disclosed water. Model back-tests at ≈$424/completed-ft on settled wells, consistent with operator-reported D&C economics. AFEs are private; these are modeled market estimates.

What the wells actually made — IP90 after the frac

Wells frac'd July 2024 – Feb 2026, 7735 with a clean 90-day production window. New Mexico: true well-level oil volumes from OCD C-115 filings. Texas: oil + condensate from RRC lease-level filings, allocated evenly across each pad's new wells, with legacy-producing leases excluded. IP90 = average daily oil over the first three reported production months.
FormationWellsMedian IP90 (bopd/well) bopd per 1,000 ft
Wolfcamp2601 677 60
Bone Spring2186 749 69
Spraberry1530 630 54
Dean278 610 50
Clear Fork205 579 58
Delaware Mtn194 598 60
San Andres90 435 47
Grayburg56 587 51
Yeso46 209 29
Avalon29 306 26
Canyon22 495 46
Queen20 653 54
Glorieta17 530 57
Penn14 367 25
Barnett12 584 65
Strawn11 604 59
Unreported402 592 53
OperatorWellsMedian IP90 (bopd/well)
ExxonMobil (Pioneer/XTO)1263 689
Devon (incl. Coterra)981 841
Diamondback779 717
Occidental593 862
EOG Resources555 851
Mewbourne Oil513 627
Chevron374 586
Permian Resources349 687
Matador Production242 619
SM Energy (incl. Civitas)191 488

Biggest jobs of the period

Ranked by total base water volume
OperatorWellCounty Water (bbl)Proppant (lbs)Water sourceJob end
ExxonMobil (Pioneer/XTO)Marsh 36 P 116H Midland, TX 1,127,000 40,166,000 mixed sources 2026-07-09
ExxonMobil (Pioneer/XTO)Marsh 36 N 114H Midland, TX 1,123,000 40,554,000 mixed sources 2026-07-09
ExxonMobil (Pioneer/XTO)Marsh 36 O 115H Midland, TX 1,119,000 40,373,000 mixed sources 2026-07-09
Permian ResourcesFred State Com #424H Eddy, NM 944,000 38,788,000 not reported 2026-06-22
Permian ResourcesFred State Com #421H Eddy, NM 941,000 38,818,000 not reported 2026-06-23
Permian ResourcesFred State Com #422H Eddy, NM 939,000 38,768,000 not reported 2026-06-22
Permian ResourcesFred State Com #132H Eddy, NM 930,000 38,802,000 not reported 2026-06-23
Permian ResourcesFred State Com #222H Eddy, NM 925,000 38,842,000 not reported 2026-06-23