← all editions
Permian Basin · Texas & New Mexico

Permian Completions Weekly

Frac jobs disclosed to FracFocus · activity through July 21, 2026 · published July 28, 2026
Read the last column with a grain of salt. The week ending July 21 shows 12 jobs against a settled pace nearer 68 — that is filing lag, not a slowdown. Operators have up to about 30 days to disclose a job to FracFocus, so the newest week is only ever a fraction of itself on publication day and grows for a month afterward. The faded columns are still arriving; judge the trend from the solid ones.
Frac jobs, last 28 days
155
Jun 24 – Jul 21, 2026
New Mexico / Texas split
57 / 98
37% of jobs in NM
Avg water per job
586,000 bbl
n = 155 jobs reporting
Avg proppant per job
26,390,000 lbs
n = 141 jobs reporting
Produced / recycled water
91%
of frac water volume · 110 of 155 jobs report source
Federal wells
68
44% of last-28-day jobs, as operator-filed — some TX filings flag federal loosely (e.g. Diamondback Midland Co. pads), so treat the split as approximate

Weekly frac job count — trailing 13 weeks

By job end date. Faded columns are recent weeks still filling in — operators have up to ~30 days to file, so the newest weeks always start low and grow.
69
4/28
103
5/5
87
5/12
63
5/19
81
5/26
54
6/2
35
6/9
68
6/16
60
6/23
47
6/30
44
7/7
52
7/14
12
7/21
Texas New Mexico Reporting still filling in

Permian rig count — 258 -1 wk/wk

Active drilling rigs in the Permian, weekly · Source: Baker Hughes
2402502601/305/17/24258

U.S. frac spread count — 198 +2 wk/wk

Active frac fleets, U.S. national — the public series; basin splits are licensed · Source: Primary Vision (via AOGR)
1501752001/305/17/24198

Drilling vs completions pace — trailing 30 weeks

Rigs drill the wells; frac spreads complete them. Both are active-unit counts on one axis — a widening gap hints at the DUC balance shifting. Note the scopes differ: rigs are Permian-only, spreads are U.S.-wide. · Sources: Baker Hughes; Primary Vision (via AOGR)
1652202751/94/247/24258198
Permian rigs U.S. frac spreads

Most active operators

Bar & big number = settled pace (wells/28d from the last 3 fully-reported months); gray number = jobs filed in the last 28 days. Operators marked · / ·· file disclosures moderately / slowly (ExxonMobil files 60–90 days behind the frac), so recent filings alone understate them.
Devon (incl. Coterra)
56
55
ExxonMobil (Pioneer/XTO) ··
52
9
Diamondback
41
32
Occidental ··
41
4
EOG Resources ·· (reports thru Dec 2025)
23
0
Mewbourne Oil ··
22
5
Permian Resources ··
19
0
Apache ··
18
4
SM Energy (incl. Civitas) ·
15
6
Chevron
13
13
Matador Production
10
8
BPX ··
9
0
Petro Hunt, L.L.C. ·· (reports thru Mar 2026)
9
0

Activity by county

Jobs ended in last 28 days
Lea, NM
41
Midland, TX
30
Eddy, NM
16
Howard, TX
12
Loving, TX
12
Ector, TX
9
Culberson, TX
7
Reeves, TX
7
Martin, TX
6
Crane, TX
5
Upton, TX
4
Irion, TX
4
Glasscock, TX
1

Completion pipeline — New Mexico (work coming to a pad near you)

From NM OCD well records, horizontal wells in Lea / Eddy / Chaves / Roosevelt: 8,284 approved permits not yet spudded (the drilling backlog — includes some older unexercised permits) and 857 wells spudded 2023+ with no FracFocus disclosure yet — drilled or drilling, not yet frac'd (some are mid-completion or awaiting the operator's disclosure filing), of which 261 were spudded in the last 90 days — the wells hitting frac schedules next. Every well in the drilled column needs a frac crew and a drillout. Texas permit pipeline (RRC W-1 files) is the next data source to wire in.
OperatorPermits (unspudded) Drilled, not yet frac'dSpudded last 90dTop county
Devon (incl. Coterra)2,416 8025 Lea
EOG Resources902 18141 Lea
Permian Resources712 9130 Eddy
Mewbourne Oil708 5227 Eddy
Matador Production651 5629 Lea
Occidental496 301 Eddy
ConocoPhillips405 130 Eddy
Chevron258 7117 Eddy
ExxonMobil (Pioneer/XTO)255 14521 Eddy
Riley Permian184 84 Eddy
BTA Oil Producers156 33 Lea
Spur Energy Partners140 2820 Eddy
SM Energy (incl. Civitas)139 10 Lea
Novo Oil & Gas109 110 Eddy
3R OPERATING102 106 Eddy
Avant84 2610 Lea

Completion pipeline — Texas permit backlog

From the RRC drilling permit master (current through early July): 4,862 approved horizontal permits issued since Jan 2024, not yet spudded or completed, in the 35 Permian counties. Texas receives spud dates late (typically with completion filings), so a drilled-not-yet-frac'd column isn't reliably possible from TX public data — the NM table above is the timelier read on that stage.
OperatorPermits (unspudded)Top county
ExxonMobil (Pioneer/XTO)697Midland
Diamondback613Midland
Occidental445Loving
Ovintiv186Martin
ConocoPhillips179Upton
Apache173Upton
Double Eagle (DE Central)165Reagan
SM Energy (incl. Civitas)158Upton
Continental Resources, Inc148Winkler
Devon (incl. Coterra)137Culberson
Blackbeard114Crane
Permian Resources101Reeves
EOG Resources99Loving
Chevron93Midland

TX backlog — smaller operators (5+ permits)

The other 54 operators holding 1,391 permits below the top table — the private and family programs where a new service company or a sales hand can actually get a look, instead of queueing behind incumbents at ExxonMobil or EOG. Majors and large independents are filtered out even when a slow permitting quarter drops them below the top table. Green dates = a fresh permit inside 30 days, i.e. actively planning wells right now.
OperatorPermits (12 mo)Top counties Newest permit
Pdeh Llc77 Loving, Winkler2026-05-21
FireBird Energy II73 Upton, Ector2026-07-01
Mewbourne Oil69 Crane, Reeves2026-07-20
BPX67 Reeves, Loving2026-07-21
Admiral Resources66 Loving, Reeves2026-06-24
Kinder Morgan Production Co Llc59 Pecos2026-06-30
Surge54 Howard, Borden2026-07-24
HighPeak Energy Holdings.52 Borden, Howard2026-07-20
TRP49 Reeves, Loving2026-07-23
BTA Oil Producers49 Crane, Loving2026-06-25
Greenlake Energy48 Reeves, Loving2026-07-08
Riley Permian48 Yoakum2026-07-14
Triple Crown Resources48 Irion, Upton2026-06-11
Vital Energy38 Glasscock, Ward2026-01-06
Summit Petroleum33 Upton2026-07-02
Permian Deep Rock Oil Co.33 Midland2026-06-24
U.S. Energy Development Corp29 Reeves2026-06-24
Discovery Natural Resources28 Reagan2026-05-11
Sabalo II27 Andrews2026-07-21
Hibernia Resources IV26 Dawson, Martin2026-03-26
Petroplex Energy26 Borden, Reeves2026-06-02
Bayswater Operating Company Llc26 Mitchell, Howard2026-07-16
Ring Energy24 Crane, Yoakum2026-06-24
VTX Energy22 Reeves2026-07-10
Iron Orchard21 Upton, Reagan2026-04-17
Black Swan Opco, Llc21 Glasscock, Reagan2026-07-09
Manti Tarka20 Ward2026-06-04
SEM20 Irion, Reagan2026-07-14
Discovery18 Midland, Upton2026-07-20
Blue Arrow15 Pecos, Reeves2026-06-29
Crescent Energy Operating, Llc14 Ward, Reeves2026-05-22
De V Operating, Llc13 Glasscock2026-04-15
Lakewood Energy12 Loving, Reeves2026-05-19
Pbex-Mcm Operating, Llc12 Dawson2026-04-06
Capitan Energy INC11 Culberson, Reeves2026-07-17
Bosque Texas Oil Llc10 Ward, Winkler2026-07-20
Hannathon Petroleum II10 Reagan2025-11-10
Langford & Brigham Operating Llc10 Howard2026-03-19
3R OPERATING9 Winkler2026-05-01
Elevation Resources9 Andrews2026-05-12
Burk Royalty8 Yoakum2026-07-02
Sharp Energy Partners, Llc8 Ector2025-10-07
Dallas Production, Inc8 Irion2025-10-08
Northstar Resources, Llc8 Reeves2026-04-23
Saxum Opco, Llc8 Upton2026-06-15
Arrington Oil&Gas Operating Llc8 Ector2026-07-20
Petrolegacy Energy Iii, Llc7 Dawson2026-05-06
Resolute Natural Res. Co., Llc7 Reeves2026-04-02
Bce-Mach Iii Llc7 Gaines2026-07-20
1920 Energy6 Reeves2026-03-11
Yukon Exploration5 Borden2026-03-03
Mongoose Energy5 Pecos2026-05-29
Arete Creek Operating, Llc5 Glasscock, Reagan2026-02-17
R K Petroleum Corp.5 Fisher2026-05-11

Smaller operators to watch

Everyone outside the top 10 with 2+ completions since March 1 (31 operators) — the private and mid-cap programs that don't make headlines but buy sand, water, and services every month. Majors and large independents are excluded regardless of job count. Entities reflect current ownership (e.g., Double Eagle's retained DE Central position; Tap Rock's NM wells now under Jonah Energy).
OperatorJobs Mar–JulTop counties Service co. (ID'd)Median water (bbl)
BPX30 Reeves, TX, Loving, TXHalliburton419,000
VTX Energy26 Reeves, TXNexTier (Patterson-UTI)618,000
FireBird Energy II25 Upton, TX, Ector, TXProFrac491,000
Spur Energy Partners21 Eddy, NMHalliburton286,000
Blue Arrow18 Reeves, TX, Pecos, TXNexTier (Patterson-UTI)635,000
Admiral Resources18 Loving, TX, Eddy, NM478,000
Summit Petroleum15 Upton, TX657,000
BTA Oil Producers14 Crane, TX, Lea, NM656,000
Petroplex Energy11 Borden, TXNexTier (Patterson-UTI)1,040,000
Kaiser-Francis Oil11 Lea, NMLiberty459,000
Surge10 Borden, TXNexTier (Patterson-UTI)420,000
Petro Hunt, L.L.C.10 Loving, TXLiberty363,000
Ring Energy8 Yoakum, TX, Crane, TXNexTier (Patterson-UTI)210,000
PBEX Operations8 Ward, TX, Dawson, TXNexTier (Patterson-UTI)616,000
Bayswater Exploration & Production8 Mitchell, TXProFrac446,000
STRATA PRODUCTION COMPANY8 Eddy, NM, Lea, NMProFrac56,000
3R OPERATING7 Lea, NM, Eddy, NMLiberty378,000
Sabalo II7 Andrews, TX496,000
Basin Oil and Gas6 Winkler, TX, Terry, TXNexTier (Patterson-UTI)4,000
TRP6 Loving, TX527,000
Manti Tarka5 Ward, TX367,000
Discovery Natural Resources5 Reagan, TXLiberty1,315,000
Black Swan4 Glasscock, TX465,000
Permian Deep Rock Oil Co.4 Midland, TXProFrac830,000
SEM4 Irion, TX383,000
Hibernia Resources IV3 Irion, TX663,000
ConocoPhillips3 Eddy, NMNexTier (Patterson-UTI)736,000
Capitan Energy INC3 Culberson, TXHalliburton447,000
Mack Energy3 Chaves, NM, Eddy, NMProFrac94,000
Yukon Exploration2 Borden, TX410,000
Jonah Energy (Tap Rock)2 Eddy, NMLiberty623,000

Completion intensity by operator

Median job design over each operator's own most recent 90 reported days — dark filers (e.g., EOG, whose disclosures stop in Dec 2025) appear at last-reported design rather than vanishing · operators with ≥8 jobs reporting water · "n/d" = proppant mass not disclosed (EOG reports water volumes but not sand mass) · basin median sand concentration 1.07 lbs/gal
OperatorJobsMedian water (bbl) Median proppant (lbs)Sand conc. (lbs/gal)
Devon (incl. Coterra)179 518,00024,928,000 1.19
Diamondback114 655,00024,671,000 0.95
Occidental95 509,00025,800,000 1.22
ExxonMobil (Pioneer/XTO)90 624,00033,493,000 1.26
EOG Resources (reports thru Dec 2025)73 517,000n/d n/d
Apache59 435,00020,609,000 0.98
Permian Resources50 532,00023,460,000 1.09
Chevron41 442,00022,491,000 1.11
SM Energy (incl. Civitas)40 533,00024,291,000 1.09
Matador Production31 756,00035,144,000 1.08
BPX30 402,00018,470,000 1.06
Petro Hunt, L.L.C. (reports thru Mar 2026)28 362,00016,315,000 1.07
Ovintiv24 619,000n/d n/d
Mewbourne Oil23 730,00030,242,000 0.94

Water & sand by well depth (TVD)

Median job design by true vertical depth band — a rough proxy for target bench (141 of 155 jobs report TVD, water, and proppant)
TVD bandJobsMedian water (bbl) Median proppant (lbs)Sand conc. (lbs/gal)
< 7,500 ft10 282,000 14,911,000 1.17
7,500 – 10,000 ft85 599,000 25,090,000 1.02
10,000 – 12,000 ft41 528,000 24,905,000 1.11
> 12,000 ft5 522,000 24,418,000 1.11
FracFocus does not disclose target formation or perforated-interval length. Formation names (Wolfcamp, Bone Spring, Spraberry…) and true per-lateral-foot intensity (lbs/ft, bbl/ft) are planned additions via Texas RRC completion records and NM OCD pool data.

Water & sand by target formation

Jobs ended in last 28 days · formation resolved for 101 of 155 jobs by joining state records (TX RRC wellbore filings, NM OCD pool assignments) by API number
FormationJobsMedian water (bbl) Median proppant (lbs)Sand conc. (lbs/gal)
Bone Spring32 468,000 23,846,000 1.17
Spraberry20 664,000 26,495,000 0.94
Wolfcamp12 529,000 24,232,000 1.08
Dean6 734,000 30,346,000 0.98
Seven Rivers6 438,000 20,738,000 1.12
Delaware Mtn3 625,000 27,170,000 1.04
Unreported54 538,000 26,074,000 1.15

Per-lateral-foot intensity by formation

Jobs ended July 2025 – present with a completed-lateral length on file (1526 jobs). State completion filings trail the frac by ~3–6 months, so this table reflects the settled record, not the newest wells. TX lateral = perforated interval span (RRC); NM lateral = MD − TVD − 600 ft curve allowance (OCD).
FormationJobsMedian lateral (ft) Proppant (lbs/ft)Water (bbl/ft)
Spraberry540 10,600 2,009 45.1
Wolfcamp472 10,300 2,266 50.3
Dean90 11,300 2,256 48.7
Bone Spring82 10,200 2,473 49.9
Clear Fork71 10,300 1,742 47.7
Grayburg30 10,900 2,493 57.4
San Andres27 10,400 1,799 45.4
Delaware Mtn16 8,800 2,167 48.1
Queen13 13,200 2,119 44.2
Avalon8 15,800 2,226 41.8
Unreported145 10,300 2,079 44.8

Current conditions — fleets likely on location (inferred)

Inferred from disclosure cadence: a pad whose latest job ended within ~1.5× its own well-to-well pace is probably still being pumped or just finishing. 14 pads read as likely active as of the latest filings (through Jul 21), 20 more recently released. Disclosures lag the frac by up to 30 days, so this view sees roughly half of true live activity — treat as a floor and a lead list, not a map. Pumper marked * is inferred from the operator's dominant 2026 service company. Field confirmations will upgrade rows from "inferred" to "confirmed" in the production version.
StatusOperatorService co.CountyPad Wells so farLast job end
🟢 Likely on locationMoriah Tom Green, TXCoral Sea Unit 1Jul 21
🟢 Likely on locationMewbourne Oil NexTier (Patterson-UTI)*Upton, TXHalff Full 2Jul 21
🟢 Likely on locationSEM Irion, TXUniversity 4Jul 19
🟢 Likely on locationDevon (incl. Coterra) LibertyLoving, TXPistol Pete 2Jul 18
🟢 Likely on locationDevon (incl. Coterra) LibertyLea, NMVan Doo Dah 33-28 Fed Com 4Jul 17
🟢 Likely on locationDevon (incl. Coterra) LibertyLoving, TXCbr 12Jul 14
🟢 Likely on locationBlue Arrow NexTier (Patterson-UTI)Reeves, TXStewart 1Jul 13
🟢 Likely on locationBlue Arrow NexTier (Patterson-UTI)Reeves, TXStewart 2-11 Unit 4Jul 12
🟢 Likely on locationVTX Energy NexTier (Patterson-UTI)Reeves, TXDik Dik 1Jul 12
🟢 Likely on locationVTX Energy NexTier (Patterson-UTI)Reeves, TXMeerkat State Unit 1Jul 11
🟢 Likely on locationExxonMobil (Pioneer/XTO) HalliburtonMidland, TXMarsh 3Jul 9
🟢 Likely on locationMewbourne Oil NexTier (Patterson-UTI)Crane, TXAlligator Gahr 1Jul 4
🟢 Likely on locationDevon (incl. Coterra) LibertyLea, NMChincoteague 8-32 Fed Com 1Jun 19
🟢 Likely on locationSabalo II Andrews, TXUl Kings Inn 1Jun 14
⚪ Recently releasedDevon (incl. Coterra) LibertyLoving, TXBlue 3Jul 13
⚪ Recently releasedChevron HalliburtonMidland, TXScharbauer 7Jul 13
⚪ Recently releasedRing Energy NexTier (Patterson-UTI)*Ector, TXMillard -B- 1Jul 12
⚪ Recently releasedDevon (incl. Coterra) HalliburtonMartin, TXMabee Dda 6Jul 11

Frac service companies — who's pumping for whom

Pressure pumper identified on 77% of the last 12 months' jobs: from FracFocus supplier records directly, plus inference validated on the directly-labeled jobs: chemical fingerprinting (pumper-specific product trade names and traveling chem/sand vendors, ≥99% holdout precision), pad siblings (same pad ±45 days, 99.9%), fleet continuity, and dedicated-fleet patterns (operators ≥90% one crew; op-county ≥85%, 98.3%). Fleet-equivalents from each pumper's observed pad pace over the last 90 days of reported jobs. "Not disclosed" jobs are genuinely unidentifiable from public data — largely self-sourcing operators and ProPetro's current work (identifiable only on pre-merger Endeavor filings) — so shares are a floor, not a census.
Service co.Jobs (12 mo)Fleet-equiv. (90d) Top customersTX / NMTop counties
Halliburton149015.6 Diamondback, Devon (incl. Coterra), Occidental1151 / 339Martin, Midland
NexTier (Patterson-UTI)10577.2 Mewbourne Oil, ExxonMobil (Pioneer/XTO), Devon (incl. Coterra)667 / 390Eddy, Lea
Liberty8667.2 ExxonMobil (Pioneer/XTO), Devon (incl. Coterra), Occidental313 / 553Eddy, Lea
ProFrac3695.5 Apache, FireBird Energy II, SM Energy (incl. Civitas)338 / 31Midland, Upton
SLB550.5 Chevron, Devon (incl. Coterra)26 / 29Lea, Culberson
BJ Energy410.1 Continental Resources, Inc, Circle-S Energy, U.S. Energy Development Corp41 / 0Ward, Ector
Not disclosed 1142 supplier not named on disclosure

Implied frac fleets & drillout demand

Fleet-equivalents = settled wells/28 days (last 3 fully-reported months, so slow filers like ExxonMobil are counted at true pace — marked ·· ) × the operator's own observed pad pace (days per well, multi-well pads) ÷ 28. This is an activity index, not a crew census — heavy simul-frac operators turn pads faster than their pad-window suggests, so their true crew count runs lower. Implied drillout units assume ~6 well drillouts per coil/workover unit per month. Basin total on this basis: 398 wells/28d ≈ 71 fleet-equivalents among operators with 4+ settled wells/month. NM data shows a median 34 days from frac end to first production (p25 19 – p75 57) — the drillout / cleanout / turn-in-line window.
OperatorWells / 28dPad pace (days/well) Implied fleet-equiv.Implied drillout units
Devon (incl. Coterra) 56 4.99.6 9.3
ExxonMobil (Pioneer/XTO) ·· 52 4.78.7 8.6
Diamondback 41 5.07.4 6.9
Occidental ·· 41 5.27.5 6.8
EOG Resources ·· (reports thru Dec 2025) 23 2.82.3 3.8
Mewbourne Oil ·· 22 3.02.4 3.7
Permian Resources ·· 19 4.63.2 3.2
Apache ·· 18 10.36.8 3.1
SM Energy (incl. Civitas) · 15 3.41.8 2.5
Chevron 13 4.11.9 2.1
Matador Production 10 4.81.6 1.6
BPX ·· 9 5.21.7 1.6
Petro Hunt, L.L.C. ·· (reports thru Mar 2026) 9 3.21.0 1.5
Ovintiv ·· 7 10.72.8 1.2

Estimated completion spend — run-rate per 28 days

Modeled from each job's disclosed sand, water, water-source mix, and lateral. Basin total from the last 3 fully-reported months: ≈ $1.99B per 28 days (1246 settled jobs), incl. ≈ $188M proppant and ≈ $190M water. Operator rows use each operator's own most recent 90 reported days, so slow and dark filers (ExxonMobil, EOG) are counted at last-reported pace — stale data is flagged. Estimates, not invoices — see assumptions below.
OperatorJobs / 28dEst. spend / 28d Est. sand $Est. water $
Devon (incl. Coterra)56 $312M$29.4M $31.7M
Diamondback35 $215M$17.7M $23.1M
ExxonMobil (Pioneer/XTO)28 $187M$19.1M $20.2M
Occidental30 $155M$16.6M $13.9M
EOG Resources (reports thru Dec 2025)23 $117M$11.4M $10.9M
Apache18 $89M$8.1M $8.6M
Permian Resources16 $85M$8.2M $6.4M
Matador Production10 $66M$6.2M $7.2M
Chevron13 $64M$5.8M $7.4M
SM Energy (incl. Civitas)12 $64M$5.9M $5.5M
Mewbourne Oil7 $44M$3.9M $4.9M
Ovintiv7 $43M$4.1M $4.0M
BPX9 $41M$3.7M $4.7M
Assumptions (2026 Permian benchmarks + field estimates): sand $39/ton delivered (field-verified 2026: 100 mesh ≈ $38.9, 40/70 regional ≈ $39.9); produced/recycled water $1.00/bbl all-in; fresh $0.32/bbl sourcing; water transfer $0.13/bbl; pumping $50k/stage at 200-ft stage spacing; wireline & plugs $10k/stage; chemicals $20/lateral-ft; drillout & flowback $300k/well. Operators that don't disclose proppant mass (e.g., EOG) have sand estimated at the basin-median 1.10 lbs/gal of disclosed water. Model back-tests at ≈$424/completed-ft on settled wells, consistent with operator-reported D&C economics. AFEs are private; these are modeled market estimates.

What the wells actually made — IP90 after the frac

Wells frac'd July 2024 – Feb 2026, 7735 with a clean 90-day production window. New Mexico: true well-level oil volumes from OCD C-115 filings. Texas: oil + condensate from RRC lease-level filings, allocated evenly across each pad's new wells, with legacy-producing leases excluded. IP90 = average daily oil over the first three reported production months.
FormationWellsMedian IP90 (bopd/well) bopd per 1,000 ft
Wolfcamp2601 677 60
Bone Spring2186 749 69
Spraberry1530 630 54
Dean278 610 50
Clear Fork205 579 58
Delaware Mtn194 598 60
San Andres90 435 47
Grayburg56 587 51
Yeso46 209 29
Avalon29 306 26
Canyon22 495 46
Queen20 653 54
Glorieta17 530 57
Penn14 367 25
Barnett12 584 65
Strawn11 604 59
Unreported402 592 53
OperatorWellsMedian IP90 (bopd/well)
ExxonMobil (Pioneer/XTO)1263 689
Devon (incl. Coterra)981 841
Diamondback779 717
Occidental593 862
EOG Resources555 851
Mewbourne Oil513 627
Chevron374 586
Permian Resources349 687
Matador Production242 619
SM Energy (incl. Civitas)191 488

Who's ramping, who's easing off

Three signals, all read month by month. The number is the average month across an operator's last three fully-reported months; the bars behind it are the fifteen months leading up to it, with those three picked out in colour; the comparison is that operator's own preceding twelve months. Permits filed with the Texas RRC are intent, and lead the frac by six to twelve months (through Jun). Spuds in New Mexico are commitment, and lead by one to three months (through Jun). Completions are the work itself, and stop at Mar because FracFocus takes about ninety days to fill a month in — the three columns end on different months on purpose. An operator permitting hard while completions hold flat is building inventory you get called for next year; one completing hard while permits fall is drawing down what it already has. Where a series is too thin or too broken to trust, the direction is left off rather than guessed. Hover any row for the last six months in figures.
OperatorTX permitsNM spuds CompletionsReads as
ExxonMobil (Pioneer/XTO)· 58/moApr–Jun · vs 61 typical▼ 7/moApr–Jun · vs 23 typical· 67/moJan–Mar · vs 76 typicalholding pace; New Mexico slowing
Diamondback· 52/moApr–Jun · vs 54 typical· 39/moJan–Mar · vs 46 typicalholding pace
Devon (incl. Coterra)· 11/moApr–Jun · vs 11 typical▼ 14/moApr–Jun · vs 19 typical· 60/moJan–Mar · vs 61 typicalholding pace; New Mexico slowing
Occidental▼ 26/moApr–Jun · vs 49 typical▼ 3/moApr–Jun · vs 8 typical· 42/moJan–Mar · vs 45 typicaloutput holding, but the front end is thinning
Mewbourne Oil· 5/moApr–Jun · vs 4 typical· 13/moApr–Jun · vs 13 typical· 26/moJan–Mar · vs 26 typicalholding pace
Permian Resources▼ 7/moApr–Jun · vs 10 typical▼ 10/moApr–Jun · vs 18 typical· 21/moJan–Mar · vs 20 typicaloutput holding, but the front end is thinning
Apache· 19/moApr–Jun · vs 17 typical· 11/moJan–Mar · vs 13 typicalholding pace
Matador Production▲ 13/moApr–Jun · vs 9 typical· 12/moJan–Mar · vs 12 typicaladding to the queue — spudding up, completions holding
Double Eagle (DE Central)· 18/moApr–Jun · vs 15 typical· 8/moJan–Mar · vs 6 typicalholding pace
SM Energy (incl. Civitas)▼ 5/moApr–Jun · vs 16 typicalnone Apr–Jun· 16/moJan–Mar · vs 14 typicaloutput holding, but the front end is thinning
Chevron▼ 1/moApr–Jun · vs 8 typical· 9/moApr–Jun · vs 8 typical▼ 11/moJan–Mar · vs 23 typicaleasing off across the board; New Mexico steady
Ovintiv▲ 19/moApr–Jun · vs 14 typicalnone Jan–Marramping on permits — completion filings too patchy to read
EOG Resources· 8/moApr–Jun · vs 7 typical▼ 11/moApr–Jun · vs 25 typicalnone disclosed yetsteady on permits — nothing disclosed to FracFocus since Dec 2025; New Mexico slowing
Continental Resources, Inc▲ 13/moApr–Jun · vs 9 typical▼ 5/moJan–Mar · vs 6 typicalbuilding inventory — permitting well ahead of the crews
No completions figure for EOG Resources — it has not disclosed a job inside the settled months. Late filing, not idle iron; see the filing-lag table below.

How fast each operator files

FracFocus has no deadline it enforces the way a state agency does, and operators treat it very differently. That matters here because a company that files ninety days late looks identical, in the table above, to one that stopped working — and telling a client the wrong one of those is the kind of mistake you only make once. So this is measured rather than assumed: the pipeline keeps dated snapshots, and a well that was absent last week and present this week was disclosed in between, which gives a real number of days from job end to disclosure. Where the sample is still too thin to stand on, the estimate comes instead from how long an operator's months take to fill in against its own average, and it is described as such. Across the 70 disclosures this pipeline has watched arrive, half landed within 19 days of the job ending, 66% within thirty days, and 10% took longer than ninety.
OperatorFilingWhat it does to the numbers above
EOG Resourcesnot filingNothing disclosed since Dec 24, 2025 — 209 days. The completions column is left blank rather than zeroed; this is late paperwork, not idle iron.
ExxonMobil (Pioneer/XTO)slowMeasured at a median of 58 days from job end to disclosure (16 filings sampled). The two most recent months will keep growing for another couple of months; read them as a floor.
Continental Resources, IncslowMonths are not final until about 82 days after they end, and the newest job on file ended 82 days ago.
Mewbourne Oilcurrent but thinFiling currently — the newest job on file ended the day this issue closes — but its recent months come in light and fill in for roughly 82 days afterward. The count is a floor, not a final number.
Chevroncurrent but thinFiling currently — the newest job on file ended 8 days ago — but its recent months come in light and fill in for roughly 82 days afterward. The count is a floor, not a final number.
DiamondbackcurrentMeasured at a median of 19 days from job end to disclosure (32 filings sampled) — recent months are close to final.
Devon (incl. Coterra)currentMeasured at a median of 11 days from job end to disclosure (5 filings sampled) — recent months are close to final.
OccidentalcurrentCurrent — the newest job on file ended 25 days ago.
Permian ResourcescurrentCurrent — the newest job on file ended 28 days ago.
ApachecurrentCurrent — the newest job on file ended 26 days ago.
Matador ProductioncurrentCurrent — the newest job on file ended 12 days ago.
SM Energy (incl. Civitas)currentCurrent — the newest job on file ended 21 days ago.

Biggest jobs of the period

Ranked by total base water volume
OperatorWellCounty Water (bbl)Proppant (lbs)Water sourceJob end
ExxonMobil (Pioneer/XTO)BUTTERS 5A 201H Midland, TX 1,497,000 74,539,000 100% produced/recycled 2026-07-02
ExxonMobil (Pioneer/XTO)BUTTERS 5C 203H Midland, TX 1,482,000 74,648,000 100% produced/recycled 2026-07-02
ExxonMobil (Pioneer/XTO)BUTTERS 5D 204H Midland, TX 1,470,000 74,609,000 100% produced/recycled 2026-07-02
ExxonMobil (Pioneer/XTO)BUTTERS 5B 202H Midland, TX 1,467,000 74,658,000 100% produced/recycled 2026-07-02
ExxonMobil (Pioneer/XTO)Marsh 36 P 116H Midland, TX 1,127,000 40,166,000 100% produced/recycled 2026-07-09
ExxonMobil (Pioneer/XTO)Marsh 36 N 114H Midland, TX 1,123,000 40,554,000 100% produced/recycled 2026-07-09
ExxonMobil (Pioneer/XTO)Marsh 36 O 115H Midland, TX 1,119,000 40,373,000 100% produced/recycled 2026-07-09
DiamondbackTHUMPER 48-24 B 5WB Ector, TX 1,014,000 40,613,000 100% produced/recycled 2026-07-07

County map book

Thirty-six pages — the basin, then every county, with each well drawn as its lateral and coloured by operator. It is four hundred kilobytes, so it loads on its own page: open the map book.