Frac jobs disclosed to FracFocus · activity through August 10, 2026 · published August 11, 2026
Read the last columns with a grain of salt. The week ending August 10 shows
2 jobs on file and the week before it just 15, against a settled pace nearer
77 a week — that is filing lag, not a shutdown. Operators have up to about 30 days to
disclose a job to FracFocus, so the newest weeks are only ever a fraction of themselves on
publication day and grow for a month afterward. The faded columns are still arriving; judge the
trend from the solid ones. On the jobs that are settled, the basin is running at about
308 frac jobs per 28 days — and the caveat cuts the way it should: recompute last
issue's settled window from this week's filings and it lands at 326 per 28 days, not the
315 we published. Late filings revise these numbers upward; that is the point of the caveat.
Frac jobs, last 28 days
84
Jul 14 – Aug 10, 2026 · filings still arriving
New Mexico / Texas split
33 / 51
39% of jobs in NM — a swing from last issue's 24%, driven by who happened to file
Settled pace
≈308 jobs/28d
jobs ended 42–126 days back ÷ 3 — the fully-reported baseline
Avg water per job
486,000 bbl
n = 84 jobs reporting
Avg proppant per job
21,160,000 lbs
n = 81 jobs reporting
Produced / recycled water
70%
of water-source records (33 of 47) · 44 of 84 jobs report source · volume-weighted 76% · thin sample — last issue read 92%
Special: a decade of sand per foot — the basin found its number
Midland Basin, nine core counties · FracFocus proppant mass joined to RRC W-2
perforated intervals · 20,257 joined wells surviving the sanity filters, 2016 – Aug 2026 · median lb of sand per
perforated foot by frac year · *2026 is preliminary (n = 114 — the perf join added no new 2026 wells this cycle,
so the 2026 column is unchanged from last issue)
1,510
2016
1,801
2017
1,854
2018
1,855
2019
1,901
2020
1,998
2021
2,003
2022
2,020
2023
2,031
2024
2,036
2025
2,103
2026*
Everyone remembers the loading race. From 2016 to 2018 the median Midland Basin well went from
1,510 to 1,854 lb per perforated foot — a 23% jump in two years, the era when every investor
deck had a "bigger fracs" slide. Then the race just… stopped. Since 2018 the median has crept from
1,854 to 2,036 lb/ft — about 10% in seven years — and the 2026 wells joined so far sit at
2,103. Call it ~2,000 lb/ft: the design equilibrium the basin settled on once the
cost-per-barrel math stopped rewarding more sand.
The sand bill still doubled — but sideways. Median perforated interval went
from 7,657 ft (2016) to 10,432 ft (2025), and median sand per well from 12.0M to
24.6M lb. The growth was laterals, not loading. Per-well demand kept sand mines busy while the
recipe barely moved.
Design still isn't monolithic: among 2025–26 completions, Pioneer's
median well takes 31.0M lb (n = 583) against Diamondback's 20.1M (n = 492) — same basin, same benches,
an 11-million-pound difference in what shows up on the pad.
Method: proppant = disclosed mass of
crystalline silica (CAS 14808-60-7) summed per disclosure; perforated interval = RRC W-2/G-1 perf
span joined by API (2,000–20,000 ft sanity); medians throughout; filings over 100M lb excluded as data errors; a perf span
from a recompletion can differ from the original lateral — a small minority of joins. The joined-well
count is taken after the sand and lateral filters (the July issue counted before them).
2026 reflects wells both frac'd and filed with the RRC — it will drift as the year fills in.
Weekly frac job count — trailing 13 weeks
By job end date. Faded columns are recent weeks still filling in — operators have up to ~30 days
to file, so the newest weeks always start low and grow. The week ending Aug 10 has 2 jobs on file;
that is normal at publication, not a stoppage — last issue's newest week printed 0 and has since grown to 15.
62
5/18
92
5/25
58
6/1
24
6/8
91
6/15
59
6/22
73
6/29
41
7/6
81
7/13
35
7/20
32
7/27
15
8/3
2
8/10
TexasNew MexicoReporting still filling in
Permian rig count — 263 +3 wk/wk
Active drilling rigs in the Permian, weekly · latest 2026-08-07 · the basin peaked at
311 rigs in Jan 2024 and has climbed from a 256–261 band to 263, the highest print since mid-July 2025, when the count was on its way down through 263 · Source: Baker Hughes
Drilling vs completions pace — trailing 30 weeks
Rigs drill the wells; frac crews complete them. Orange is Permian rigs; blue is frac jobs
ended each week from FracFocus — the blue line's newest weeks are unfiled, not idle (judge it from the
middle of the series). The national frac-spread series remains unsourced this issue. ·
Sources: Baker Hughes; FracFocus
Permian rigsFrac jobs/week (FracFocus)
Most active operators
Bar & big number = settled pace (wells/28d from jobs ended 42–126 days back);
gray number = jobs filed in the last 28 days. Occidental takes the top slot this issue —
Diamondback's settled pace slipped to 28.3 while late Oxy filings pushed it to 32.3; the window
moved a week and a third of it is new data, so treat the flip as provisional. Method note:
operators are shown as filed on the disclosure — no ownership roll-ups — so Pioneer and XTO (both
ExxonMobil), and Cimarex (Coterra, now Devon) appear separately. Operators marked · / ·· file
moderately / slowly, so recent filings alone understate them. EOG is absent entirely — nothing
disclosed since Dec 2025.
Occidental ··
32.3
0
Diamondback
28.3
12
Devon
21.7
14
Pioneer (ExxonMobil) ·
21.0
0
Permian Resources
17.3
12
Apache ··
16.3
0
Cimarex (Coterra/Devon) ·
16.3
0
COG (ConocoPhillips)
15.7
9
XTO (ExxonMobil) ·
14.7
0
Mewbourne Oil ·
12.7
2
Matador
10.7
4
Chevron ·
10.7
0
Civitas (SM Energy) ·
8.3
0
Ovintiv ··
8.0
0
Activity by county
Jobs ended in last 28 days (sums to 84). Midland Co. prints just 2 against a
settled pace of ~26/28d — filing lag (it printed 20 last issue), not a stop.
Lea, NM
27
Reeves, TX
14
Glasscock, TX
12
Loving, TX
9
Eddy, NM
6
Irion, TX
6
Martin, TX
6
Upton, TX
2
Midland, TX
2
Completion pipeline — New Mexico (work coming to a pad near you)
From NM OCD well records (queried Aug 11), horizontal wells in Lea / Eddy / Chaves / Roosevelt:
8,311 approved permits not yet spudded (the drilling backlog — includes stale, unexercised permits of
all vintages) and 4,414 wells spudded 2024–2026 still carried as "New" — drilled or drilling with no
completion on record, the OCD's closest thing to a DUC list. Every well in that second column needs a frac
crew and a drillout. Operators as filed with the OCD; parentheses note current owners.
Operator
Permits (unspudded)
Spudded '24–'26, awaiting completion
Top county
Devon
1,271
405
Lea
EOG Resources
949
797
Lea
ConocoPhillips
792
57
Lea
Coterra (Devon)
680
254
Lea
Matador
657
339
Lea
Permian Resources
621
410
Eddy
Mewbourne Oil
607
533
Eddy
Occidental
492
210
Eddy
XTO (ExxonMobil)
307
583
Eddy
Chevron
246
271
Eddy
Riley Permian
192
16
Eddy
BTA Oil Producers
163
32
Lea
Spur Energy
140
110
Eddy
Civitas (SM)
129
43
Lea
Novo Oil & Gas
109
46
Eddy
WPX (Devon)
104
35
Eddy
Top of the DUC-proxy column basin-wide: EOG 797, XTO 583, Mewbourne 533, Permian Resources 410, Devon 405. The 2026-spud subset is the freshest work headed
to frac schedules: EOG 133, XTO 101, Mewbourne 96, Permian Resources 90, Matador 84.
Completion pipeline — Texas permit backlog
RRC drilling permit master, Aug 8 vintage: 4,782 permits issued Aug 2025 – Aug 7, 2026
in the Permian counties, 86% horizontal. July is now a complete month — 396 permits, mid-pack for the year.
August is partial — the file runs only through Aug 7, so the last column is a stub, not a cliff.
Permits lead the frac by six to twelve months.
308
8/25
371
9/25
475
10/25
236
11/25
305
12/25
491
1/26
327
2/26
422
3/26
473
4/26
468
5/26
408
6/26
396
7/26
102
8/26
TX Permian permits/monthAugust partial (through Aug 7)
Permit holders — trailing 12 months
Operator
Permits (12 mo)
Top county
Pioneer (ExxonMobil)
588
Midland
Occidental
508
Gaines
Diamondback
479
Midland
Operator name unresolved (small P-5 numbers)
309
Loving
COG (ConocoPhillips)
198
Loving
Ovintiv
157
Martin
Apache
148
Upton
Continental Resources
127
Winkler
Double Eagle (DE Central)
127
Reagan
Blackbeard
124
Crane
Kinder Morgan
100
Pecos
Permian Resources
100
Reeves
Cimarex (Coterra/Devon)
99
Culberson
Chevron
87
Midland
Civitas (SM Energy)
85
Upton
EOG Resources
77
Loving
Smaller operators to watch
Everyone outside the top-10 settled list with 3+ completions since March 8 —
the private and mid-cap programs that buy sand, water, and services every month without making headlines.
Large independents (Mewbourne, Civitas, Matador, Ovintiv, SM, Continental) are excluded regardless of count.
Green dates = a job ended inside the last ~30 days,
i.e. a crew was just there. Service co. from supplier records where identifiable.
Operator
Jobs Mar–Aug
Top counties
Service co. (ID'd)
Median water (bbl)
Newest job
BPX
30
Reeves, TX, Loving, TX
Halliburton
402,000
2026-05-30
FireBird Energy II
25
Upton, TX, Ector, TX
—
491,000
2026-06-10
VTX Energy
25
Reeves, TX
NexTier/P-UTI
618,000
2026-07-27
Admiral Resources
24
Loving, TX, Eddy, NM
—
479,000
2026-07-29
Fasken Oil and Ranch
20
Andrews, TX, Midland, TX
—
510,000
2026-07-29
Double Eagle (DE Central)
19
Reagan, TX, Glasscock, TX
NexTier/P-UTI
577,000
2026-05-07
Blue Arrow
18
Reeves, TX, Pecos, TX
—
633,000
2026-07-13
Avant Operating II, LLC
17
Lea, NM
Liberty
341,000
2026-07-17
Spur Energy Partners
16
Eddy, NM
Halliburton
356,000
2026-07-05
Summit Petroleum
13
Upton, TX
FTS Intl
781,000
2026-05-25
BTA Oil Producers
11
Crane, TX, Lea, NM
FTS Intl
668,000
2026-05-25
Kaiser-Francis Oil
11
Lea, NM
Liberty
459,000
2026-05-01
Strata Production
11
Eddy, NM, Lea, NM
—
51,000
2026-07-18
Petro Hunt
10
Loving, TX
Liberty
358,000
2026-03-25
Petroplex Energy
9
Borden, TX
—
1,040,000
2026-04-26
Bayswater E&P
8
Mitchell, TX
ProFrac
426,000
2026-04-24
Surge
8
Borden, TX
NexTier/P-UTI
419,000
2026-04-29
3R Operating
7
Lea, NM, Eddy, NM
Liberty
378,000
2026-06-21
Basin Oil and Gas
7
Winkler, TX, Terry, TX
—
4,000
2026-05-12
PBEX Operations
7
Ward, TX, Dawson, TX
—
441,000
2026-05-12
Sabalo II
7
Andrews, TX
ProFrac
496,000
2026-06-15
Crescent Energy Company
6
Glasscock, TX, Reeves, TX
ProFrac
635,000
2026-04-27
SEM Operating Company, LLC
6
Irion, TX
—
383,000
2026-08-07
TRP
6
Loving, TX
—
514,000
2026-04-28
Discovery Natural Resources
5
Reagan, TX
Liberty
1,315,000
2026-05-09
Manti Tarka
5
Ward, TX
NexTier/P-UTI
367,000
2026-04-22
Permian Deep Rock
5
Midland, TX
ProFrac
584,000
2026-06-27
Ring Energy
5
Crane, TX, Andrews, TX
—
260,000
2026-07-12
Black Swan
4
Glasscock, TX
—
449,000
2026-04-27
Mack Energy
4
Eddy, NM, Chaves, NM
—
95,000
2026-07-24
RP Operating, LLC
4
Reagan, TX
—
1,166,000
2026-07-10
Blackbeard
3
Crane, TX
FTS Intl
253,000
2026-03-23
Capitan Energy INC
3
Culberson, TX
Halliburton
447,000
2026-05-29
ConocoPhillips Company/Burlington Resources
3
Eddy, NM
—
736,000
2026-04-07
Greenlake Energy Operating
3
Reeves, TX, Loving, TX
Liberty
582,000
2026-07-19
Hilcorp
3
Eddy, NM
—
11,000
2026-07-18
Completion intensity by operator
Median job design over each operator's own most recent 90 reported days · operators with
≥8 jobs and a disclosure inside the last 6 months · sand in millions of lbs, water in thousands of bbl ·
lateral and lb/ft come from the RRC perf-interval join, which trails the frac by 3–6 months — for most
operators the newest wells have no perf record yet, so those columns are blank ("—") rather than guessed.
"n/d" = proppant mass not disclosed.
Operator
Jobs
Median sand (M lbs)
Median water (k bbl)
Median lateral (ft)
Sand (lbs/ft)
Diamondback
117
24.5
631
—
—
Occidental
114
25.5
499
—
—
Devon
68
24.9
478
—
—
Apache
63
20.9
439
—
—
Pioneer (ExxonMobil)
62
28.1
685
15,629
1,688
Cimarex (Coterra/Devon)
60
24.3
505
—
—
COG (ConocoPhillips)
59
29.8
560
—
—
Permian Resources
57
26.7
580
—
—
XTO (ExxonMobil)
48
36.7
613
—
—
Chevron
42
21.7
440
—
—
Civitas (SM Energy)
38
24.3
531
—
—
Matador
35
35.3
761
—
—
Petro Hunt (newest 2026-03)
30
16.3
362
—
—
BPX (newest 2026-05)
30
18.5
402
—
—
Double Eagle (DE Central) (newest 2026-05)
30
n/d
538
10,392
—
Mewbourne Oil
29
30.2
642
—
—
FireBird Energy II (newest 2026-06)
25
21.1
491
—
—
Ovintiv (newest 2026-05)
24
n/d
619
—
—
Blackbeard (newest 2026-03)
18
8.9
228
7,181
2,859
Summit Petroleum (newest 2026-05)
17
33.5
656
—
—
Continental Resources (newest 2026-04)
17
22.1
610
—
—
Avant Operating II, LLC
17
13.4
341
—
—
Fasken Oil and Ranch
16
17.6
510
—
—
Surge (newest 2026-04)
16
n/d
393
—
—
Spur Energy Partners
15
7.6
427
—
—
BTA Oil Producers (newest 2026-05)
14
26.2
645
11,112
2,367
Admiral Resources
14
24.8
480
—
—
VTX Energy
14
25.3
647
—
—
Petroplex Energy (newest 2026-04)
13
38.9
1039
—
—
Kaiser-Francis Oil (newest 2026-05)
11
19.3
459
—
—
Black Swan (newest 2026-04)
11
34.1
786
16,601
2,259
SM Energy (newest 2026-04)
10
57.3
1149
10,382
2,999
Blue Arrow
10
27.1
630
—
—
Strata Production
9
3.9
56
—
—
Crescent Energy Company (newest 2026-04)
9
24.0
550
—
—
Bayswater E&P (newest 2026-04)
8
21.8
426
—
—
PBEX Operations (newest 2026-05)
8
27.5
529
7,426
2,433
Paloma Permian AssetCo, LLC (newest 2026-02)
8
26.2
563
—
—
Water & sand by well depth (TVD)
Median job design by true vertical depth band, last-28-day jobs reporting TVD, water, and
proppant (81 of 84) — a rough proxy for target bench. The deepest band is four wells this period; its low
0.82 lbs/gal concentration is a small-sample artifact, not a design shift.
TVD band
Jobs
Median water (bbl)
Median proppant (lbs)
Sand conc. (lbs/gal)
< 7,500 ft
8
94,000
4,994,000
1.12
7,500 – 10,000 ft
42
474,000
20,911,000
1.01
10,000 – 12,000 ft
27
553,000
25,314,000
1.01
> 12,000 ft
4
570,000
19,648,000
0.82
Water & sand by target formation — Texas
Texas jobs ended in the last 28 days (51), formation from the RRC wellbore join where the
completion filing has caught up — only 6 of 51 named this issue. The RRC join has not reached this
fresher window at all yet (last issue's window shows 44 named today), so the Unreported row is the story,
not the benches — read the named rows as anecdotes. No formation cleared the 10-well bar for its own
"Other named" row. New Mexico is excluded this issue (the OCD pool join was not refreshed this
cycle). Because the RRC filing trails the frac, the named rows skew toward operators that file completions
promptly.
Formation
Jobs
Median water (bbl)
Median proppant (lbs)
Sand conc. (lbs/gal)
Spraberry (incl. Jo Mill)
3
480,000
20,683,000
1.03
Dean
1
501,000
21,351,000
1.01
Wolfcamp
2
336,000
15,111,000
1.12
Unreported
45
526,000
23,528,000
0.96
Current conditions — fleets likely on location (inferred)
Inferred from disclosure cadence: a pad (operator + surface location, ~1 km grid) whose
latest job ended within ~1.5× that pad's own median gap between filing dates is probably still being
pumped or just finishing — 71 pads pass the test this issue; the freshest are below. Several large
operators batch-date a whole pad's wells to one end date, which hides their cadence — so this view skews
toward smaller, steadier programs. Disclosures lag the frac by up to 30 days; treat this as a floor and a
lead list, not a map. The "recently released" rows are the freshest pads whose own cadence says the crew
has moved on.
Status
Operator
Service co.
County
Wells so far
Pad gap (d)
Last job end
🟢 Likely on location
Devon
—
Lea, NM
12
9
Jul 28
🟢 Likely on location
COG (ConocoPhillips)
Halliburton
Martin, TX
7
16
Jul 26
🟢 Likely on location
Burnett Oil
—
Eddy, NM
4
60
Jul 25
🟢 Likely on location
Burnett Oil
—
Eddy, NM
3
111
Jul 22
🟢 Likely on location
Strata Production
—
Eddy, NM
2
165
Jul 18
🟢 Likely on location
Ring Energy
—
Ector, TX
3
307
Jul 12
🟢 Likely on location
Ring Energy
—
Crane, TX
3
242
Jul 11
🟢 Likely on location
Strata Production
—
Eddy, NM
2
207
Jul 9
🟢 Likely on location
Cimarex (Coterra/Devon)
Halliburton
Culberson, TX
13
48
Jul 5
🟢 Likely on location
Strata Production
—
Eddy, NM
2
249
Jul 1
⚪ Recently released
Devon
—
Lea, NM
10
5.5
Jul 28
⚪ Recently released
COG (ConocoPhillips)
—
Lea, NM
3
8
Jul 27
⚪ Recently released
Diamondback
Halliburton
Glasscock, TX
6
1
Jul 24
⚪ Recently released
Avant Operating II, LLC
—
Lea, NM
8
1
Jul 17
⚪ Recently released
Permian Resources
—
Reeves, TX
6
1
Jul 17
⚪ Recently released
Avant Operating II, LLC
Liberty
Lea, NM
9
1
Jul 16
⚪ Recently released
Devon
—
Loving, TX
8
8.5
Jul 14
⚪ Recently released
Blue Arrow
—
Reeves, TX
4
1
Jul 13
⚪ Recently released
VTX Energy
—
Reeves, TX
2
1
Jul 12
Frac service companies — who's pumping for whom
Pressure pumper identified on 60% of the last 12 months' jobs (2,877 of 4,800) —
from FracFocus supplier records directly, plus same-pad propagation (a labeled sibling well within the pad
names the crew). That 60% is directly comparable to last issue's 61% — same method, stable coverage —
but not to the 77% printed in July, which layered chemical fingerprinting and fleet-continuity
inference on top. "Not identified" jobs are genuinely unlabeled in public data — largely self-sourcing
operators and ProPetro's current work — so shares are a floor, not a census.
Apache, Paloma Permian AssetCo, LLC, Permian Deep Rock
211 / 22
Midland, Howard
FTS International
84
Permian Resources, Summit Petroleum, Ovintiv
49 / 35
Lea, Upton
SLB
25
Chevron, Devon
8 / 17
Lea, Culberson
Not identified
1,923
supplier not named on disclosure or pad
–
–
Implied frac fleets & drillout demand
Transparent math, two assumptions: a frac fleet turns ~5.6 wells per 28 days
(the basin-average throughput calibrated in the July issue: 398 wells ↔ 71 fleet-equivalents), and a
coil/workover unit drills out ~6 wells per month. Fleet-equivalents = settled wells/28d ÷ 5.6;
drillout units = wells/28d ÷ 6. Method note: too many operators batch-date pad filings for per-pad
cadence to be reliable, so a single basin-average throughput is used — simul-frac heavy operators'
true crew counts run lower than shown, and slower programs' higher. Basin total on this basis:
308 wells/28d ≈ 55 fleet-equivalents and ≈ 51 drillout units kept busy — one fewer
fleet and two fewer drillout units than last issue's book.
Operator
Wells / 28d (settled)
Implied fleet-equiv.
Implied drillout units
Occidental
32.3
5.8
5.4
Diamondback
28.3
5.1
4.7
Devon
21.7
3.9
3.6
Pioneer (ExxonMobil)
21.0
3.8
3.5
Permian Resources
17.3
3.1
2.9
Apache
16.3
2.9
2.7
Cimarex (Coterra/Devon)
16.3
2.9
2.7
COG (ConocoPhillips)
15.7
2.8
2.6
XTO (ExxonMobil)
14.7
2.6
2.4
Mewbourne Oil
12.7
2.3
2.1
Matador
10.7
1.9
1.8
Chevron
10.7
1.9
1.8
Civitas (SM Energy)
8.3
1.5
1.4
Ovintiv
8.0
1.4
1.3
Estimated completion spend — run-rate per 28 days
Correction issued 2026-09-01
This card originally printed $10.2M per job and
$3.1B per 28 days. Both numbers were wrong. They were too high by about
2.4× — an overstatement of roughly $5.9M per well and
$1.8B per 28 days.
The fault was structural, not a mistyped constant. The old model priced the pumping spread as sand-throughput days: it divided the job's disclosed proppant by an assumed 500,000 lb of sand per day and charged $180,000 a day against the result. On this issue's median settled job (24,817,299 lb of sand) that is 50 pumping days and $8.93M of pumping alone — about 88% of the whole published cost. No Permian well takes fifty days to pump; a modern zipper or simul-frac spread places 3–5 million lb a day, so the real figure is a week or so. Everything downstream of that term inherited the error.
Only the cost is corrected. The settled pace, the job counts, the operator tables and every other figure in this issue are reprinted exactly as they were published — the defect never touched them.
Cost per median settled well
$4.25M
was $10.2M
Per completed lateral foot
$410
was ≈$984/ft
Basin run-rate per 28 days
$1.31B
was $3.1B · on the same 308.3 settled pace
As published
Corrected
Cost per median settled well
$10.2M
$4.25M
Per completed lateral foot
≈$984
$410
Basin run-rate per 28 days
$3.1B
$1.31B
Settled pace, jobs / 28 days
308.3
308.3
Line
Basis
Rate
Median well
Pumping spread & stimulation service
$ / lateral ft
$125
$1,295,250
Wireline, plugs & pumpdown
$ / lateral ft
$50
$518,100
Chemicals & additives
$ / lateral ft
$20
$207,240
Site, rentals, supervision, fuel & other
$ / lateral ft
$30
$310,860
Proppant delivered
$ / lb on the job's sand
$0.016
$397,077
Water, produced / recycled
$ / bbl × 72.2% of the barrels
$0.50
$189,294
Water, fresh
$ / bbl × the remaining 27.8%
$1.10
$160,349
Drillout — coil or workover rig
flat $ / well
$350,000
$350,000
Flowback & early production
flat $ / well
$225,000
$225,000
Tubing, wellhead & surface facilities
flat $ / well
$600,000
$600,000
Total
10,362 ft of completed lateral
$410 / ft
$4,253,170
The basis. Completion cost is now built per lateral foot: four foot-priced lines — pumping spread and stimulation service, wireline/plugs/pumpdown, chemicals and additives, and site, rentals, supervision, fuel and other — at $225 per completed foot combined; two pass-throughs priced on the job's own measured volumes — proppant at $0.016/lb on the disclosed sand, and water split by the disclosed produced/recycled share; and three flat per-well lines — drillout, flowback and early production, and tubing, wellhead and surface facilities. The sand-throughput day term is gone entirely.
Where the lateral comes from, and what is wrong with it. The 10,362 ft is a perforated interval, not a drilled lateral, and it is not this issue's wells. It is the median perf span of the lagged cohort: Texas wells completed 6 to 12 months before this issue (n = 1,608, 82% TX coverage). It has to be, because RRC perforation records land 4 to 8 months after the frac — the direct join on this issue's own settled jobs is 4.0%, and on a 28-day window it is essentially zero. A current-window lateral does not exist. Worse, the few recent joins are biased large — prompt filers are big-job operators — so using them would overstate the median. New Mexico has no perforation source at all: dbf900 is a Texas RRC file, only 7 of 15,652 NM disclosures ever join, and NM is a third of every window. The foot priced here is therefore a Texas perforated foot applied basin-wide. For scale, the median permitted lateral this issue is 11,123 ft, 7% longer — the expected heel/toe standoff between drilled and perforated.
The sanity check that should have caught this. The old number was $10.2M on a ~10,362 ft well. Divide it by the lateral: ≈$984 per foot for the completion alone — more than the all-in drilling-and-completion cost per foot of every public Permian operator, which runs about $675–$1,035/ft (Permian Resources at $675–685/ft; Matador at $835–855/ft; Civitas Delaware at $880/ft). A completion-only number cannot exceed an all-in number. The rebuilt figure lands at $410/ft, implying roughly $710/ft all-in once about $300/ft of drilling is added — inside the operator band rather than above it. Standing rule: check any well cost per lateral foot against operator guidance before it ships.
Pricing the median understates the basin. The lateral distribution is bimodal, not a bell: on the well-covered cohort 38% of wells fall in the 10,000–11,000 ft (two-mile) band and 14% in the 15,000–16,000 ft (three-mile) band — roughly one job in seven is a three-miler. A median-only model prices those wells light. Holding these rates and moving only the lateral: a p25 10,018 ft well costs $4.18M and a p75 13,305 ft well costs $4.92M, against $4.25M at the median. The basin run-rate above is therefore a floor, not a midpoint.
Quantities. The median sand, water and produced-water share are this issue's own settled window (job end 42–126 days back), the same population the old model priced. The retained FracFocus snapshot of this vintage reproduces the originally published cost to the digit, so the correction is a change of method, not of data. The settled pace is the original published 308.3.
The per-operator table has been withdrawn, not corrected. It was generated by the same defective model. Rebuilding it needs per-operator lateral, sand and water for this window, and the retained inputs do not support that at operator granularity. Publishing a corrected basin figure beside an uncorrected operator table would be worse than dropping it.
Estimates, not invoices — a rate card, not an AFE. Rates: spend_rate_card_2026-09-01.xlsx, rates provisional pending sign-off. Quantities: FracFocus (proppant, water, water source) and RRC dbf900 perforation records, via build/spend_inputs.json. Jul 21 is unaffected: it used a per-stage model of its own, back-tested at ≈$424 per completed foot, which is where this rebuild independently lands.
What the wells actually made — IP90 after the frac
No new production data this issue — RRC PDQ is a
monthly dump (still the Jul 27 vintage) and the NM OCD portal added bot protection on our C-115 query
route this week; the tables below are unchanged from the Aug 3 issue. Both refresh next issue if sources
allow.
Wells frac'd July 2024 – Feb 2026, 6,153 with a clean 90-day production window
(2,843 New Mexico + 3,310 Texas). New Mexico: true well-level oil volumes from OCD C-115 filings, all
3,175 cohort wells queried. Texas: oil + condensate from RRC lease-level filings, restricted this issue
to single-well leases — leases carrying exactly one wellbore on the proration schedule, so lease
volumes are well volumes with no pad allocation; that keeps 3,310 of 6,687 TX cohort wells (49%; the rest
sit on multi-well leases) and is stricter than July's pad-allocation method, so well counts are not
comparable issue-over-issue. Wells with production predating the frac (refracs, legacy leases) excluded.
IP90 = oil over the first three reported production months ÷ 90 days. Median across all 6,153
wells: 694 bopd (NM 762, TX 640).
Formation
Wells
Median IP90 (bopd/well)
bopd per 1,000 ft
Wolfcamp
2366
693
65
Bone Spring
2049
769
64
Spraberry
1206
639
52
Dean
173
741
55
Clear Fork
136
569
50
Barnett
66
569
62
Yeso
35
225
—
Delaware Mtn
32
590
—
San Andres
24
175
26
Penn
17
298
—
Strawn
12
536
51
Queen
11
438
42
Other / unreported
26
432
28
Operator
Wells
Median IP90 (bopd/well)
ExxonMobil (Pioneer/XTO)
1191
700
Devon (incl. Coterra)
622
895
EOG Resources
540
858
Mewbourne Oil
509
625
Occidental
413
997
Permian Resources
350
674
Diamondback
318
765
Chevron
301
611
ConocoPhillips (COG)
254
763
Matador Production
236
622
The single-well-lease restriction reshuffles the operator
ranking versus July — operators that develop on one-well leases (New Mexico federal units, newer TX
allocation leases) are fully counted; big-pad operators are under-represented. Devon, Oxy and EOG
medians run high partly because their qualifying wells skew to the Delaware side. Formations under
10 qualifying wells are folded into "Other".
Per-1,000-ft figures use perforated intervals from
the TX wellbore file (known for 3,211 of 3,310 TX wells) plus NM OCD completion reports where filed —
only 62 of 2,843 NM wells, since OCD processes completion paperwork with a long lag. The per-foot column
is therefore TX-weighted; NM-only formations (Yeso, Delaware Mtn, Penn) show a dash where the lateral
sample is under 10 wells. TX production through May 2026 (June filings still arriving); NM through
May–June 2026. 90-day windows ending after May 2026 are held for next issue rather than reported
against part-filed months.
Who's ramping, who's easing off
Three signals per operator: settled pace (wells/28d, jobs ended 42–126 days back)
against its own prior three-month window (126–210 days back); TX permits issued in the
trailing 8 weeks (Jun 16 – Aug 7 — the permit file runs through Aug 7) against the prior 8 weeks
(intent — leads the frac 6–12 months; arrows at ±20%); and jobs filed in the last 28 days as a
share of settled pace (a filing-freshness read, not a slowdown detector — slow filers run low here every
issue). Hover a row for the figures.
Operator
Settled pace /28d
TX permits
Filed last 28d
Reads as
Occidental
· 32.3vs 39.3 prior 3 mo
▼ 428 wk to Aug 7 · vs 102 prior 8 wk
0 (0%)
new settled leader — but a slow filer easing on permits; watch the revision
Diamondback
▼ 28.3vs 42.3 prior 3 mo
▼ 288 wk to Aug 7 · vs 73 prior 8 wk
12 (42%)
off sharply on paper — window shift plus revisions; permits easing too
Devon
· 21.7vs 18.7 prior 3 mo
—no TX permits (NM program)
14 (65%)
holding pace, filings current — program is NM-weighted
Pioneer (ExxonMobil)
▼ 21.0vs 41.0 prior 3 mo
· 1078 wk to Aug 7 · vs 102 prior 8 wk
0 (0%)
sharp drop on paper — a slow filer permitting steadily; likely lag, not a stop
Permian Resources
· 17.3vs 21.3 prior 3 mo
▼ 88 wk to Aug 7 · vs 19 prior 8 wk
12 (69%)
holding pace, filings current; permit intake soft
Apache
· 16.3vs 14.0 prior 3 mo
▼ 188 wk to Aug 7 · vs 33 prior 8 wk
0 (0%)
steady completions; permits easing and nothing filed in four weeks
Cimarex (Coterra/Devon)
· 16.3vs 17.0 prior 3 mo
▼ 08 wk to Aug 7 · vs 22 prior 8 wk
0 (0%)
holding pace; TX permit intake went to zero — front end thinning
COG (ConocoPhillips)
▼ 15.7vs 24.0 prior 3 mo
▲ 518 wk to Aug 7 · vs 18 prior 8 wk
9 (57%)
off its spring pace but permitting hard — work is coming
XTO (ExxonMobil)
▼ 14.7vs 21.3 prior 3 mo
—no permits either window
0 (0%)
slowing on paper, TX permitting dormant — Exxon's permit weight sits with Pioneer
Mewbourne Oil
▼ 12.7vs 22.3 prior 3 mo
▲ 188 wk to Aug 7 · vs 7 prior 8 wk
2 (16%)
completions halved on paper; permits up and a 533-well NM backlog says the work is coming
Matador
· 10.7vs 12.3 prior 3 mo
—no TX permits (NM program)
4 (38%)
holding pace — NM program, filings reasonably current
Chevron
· 10.7vs 11.7 prior 3 mo
▲ 188 wk to Aug 7 · vs 4 prior 8 wk
0 (0%)
holding pace; TX permitting swung back on — intake rebuilding
Civitas (SM Energy)
▼ 8.3vs 13.7 prior 3 mo
▼ 58 wk to Aug 7 · vs 9 prior 8 wk
0 (0%)
easing on both signals; nothing filed in four weeks
Ovintiv
▲ 8.0vs 0.0 prior 3 mo
▼ 148 wk to Aug 7 · vs 32 prior 8 wk
0 (0%)
batch filer back on the board — permit intake easing
EOG is absent from every completions column — nothing disclosed to
FracFocus since Dec 2025 — while its NM drilling backlog (797 wells spudded '24–'26 awaiting
completion) is the basin's largest. Late paperwork on an active program, not idle iron.
How current is each operator's paperwork?
Every operator with 8+ Permian disclosures in the trailing 18 months — 68 of them —
sorted worst-first by how stale the FracFocus file is at press time (Aug 10). current = newest
job-end on file within 42 days; slow = 42–120 days; dark = nothing newer than 120 days.
FracFocus has no enforced filing deadline, so a dark file is a paperwork signal, not an activity signal —
and each late batch that eventually lands revises the settled-pace numbers above upward after the fact.
The dark list shrank 23 → 19 this week as several of last issue's dark names (Burnett, UpCurve,
Iron Orchard, HighPeak, Vital and others) landed late batches; Occidental — the settled-pace leader —
slipped from current to slow (newest Jun 26, 45 days). Settled pace = jobs ended 42–126 days back ÷ 3.
Operator
Filing
Newest job-end on file
Filed last 28d
Settled pace /28d
OxyRock Operating, LLC
dark
Aug 28, 2025 · 347d
0
0.0
Rockport Energy Solutions LLC
dark
Oct 10, 2025 · 304d
0
0.0
U.S. Energy Development Corp
dark
Nov 2, 2025 · 281d
0
0.0
FourPoint Energy, LLC
dark
Nov 19, 2025 · 264d
0
0.0
Iron Orchard Operating, LLC
dark
Dec 9, 2025 · 244d
0
0.0
EOG Resources
dark
Dec 24, 2025 · 229d
0
0.0
UpCurve Energy LLC
dark
Dec 26, 2025 · 227d
0
0.0
HighPeak Energy Holdings, LLC.
dark
Jan 14, 2026 · 208d
0
0.0
IKE Operating, LLC
dark
Jan 16, 2026 · 206d
0
0.0
Vital Energy
dark
Jan 16, 2026 · 206d
0
0.0
Triple Crown Resources
dark
Jan 18, 2026 · 204d
0
0.0
Unitex Oil Company
dark
Feb 5, 2026 · 186d
0
0.0
Circle-S Energy, LLC
dark
Feb 15, 2026 · 176d
0
0.0
Hannathon Petroleum II, LLC
dark
Feb 16, 2026 · 175d
0
0.0
Paloma Permian AssetCo, LLC
dark
Feb 25, 2026 · 166d
0
0.0
Hibernia Resources IV LLC
dark
Mar 2, 2026 · 161d
0
0.0
Blackbeard Operating
dark
Mar 23, 2026 · 140d
0
0.0
Petro Hunt, L.L.C.
dark
Mar 25, 2026 · 138d
0
0.0
Marathon Oil
dark
Apr 4, 2026 · 128d
0
0.0
SM Energy
slow
Apr 12, 2026 · 120d
0
0.7
Manti Tarka Permian
slow
Apr 22, 2026 · 110d
0
1.7
Bayswater Exploration & Production, LLC
slow
Apr 24, 2026 · 108d
0
1.3
Petroplex Energy Inc.
slow
Apr 26, 2026 · 106d
0
1.7
Black Swan Oil & Gas
slow
Apr 27, 2026 · 105d
0
1.3
Crescent Energy Company
slow
Apr 27, 2026 · 105d
0
0.7
TRP Operating LLC
slow
Apr 28, 2026 · 104d
0
2.0
Surge Operating, LLC
slow
Apr 29, 2026 · 103d
0
1.3
Continental Resources, Inc
slow
Apr 30, 2026 · 102d
0
2.3
Kaiser-Francis Oil Company
slow
May 1, 2026 · 101d
0
2.7
DE Central Operating, LLC
slow
May 7, 2026 · 95d
0
4.0
Ovintiv
slow
May 8, 2026 · 94d
0
8.0
Discovery Natural Resources LLC
slow
May 9, 2026 · 93d
0
1.7
Basin Oil and Gas Operating, LLC
slow
May 12, 2026 · 90d
0
1.0
PBEX Operations, LLC
slow
May 12, 2026 · 90d
0
1.0
Summit Petroleum LLC
slow
May 25, 2026 · 77d
0
2.3
BTA Oil Producers LLC
slow
May 25, 2026 · 77d
0
2.0
BPX Operating Company
slow
May 30, 2026 · 72d
0
5.0
Tap Rock Resources
slow
May 30, 2026 · 72d
0
0.7
FireBird Energy II LLC
slow
Jun 10, 2026 · 61d
0
6.3
Sabalo II Operating, LLC
slow
Jun 15, 2026 · 56d
0
2.3
3R OPERATING, LLC
slow
Jun 21, 2026 · 50d
0
2.3
Apache
slow
Jun 25, 2026 · 46d
0
16.3
Occidental
slow
Jun 26, 2026 · 45d
0
32.3
Permian Deep Rock Oil Co., LLC
slow
Jun 27, 2026 · 44d
0
1.7
Civitas (SM Energy)
current
Jun 30, 2026 · 41d
0
8.3
XTO (ExxonMobil)
current
Jul 2, 2026 · 39d
0
14.7
Spur Energy Partners
current
Jul 5, 2026 · 36d
0
4.3
Pioneer (ExxonMobil)
current
Jul 9, 2026 · 32d
0
21.0
RP Operating, LLC
current
Jul 10, 2026 · 31d
0
0.7
Cimarex (Coterra/Devon)
current
Jul 11, 2026 · 30d
0
16.3
Ring Energy, Inc.
current
Jul 12, 2026 · 29d
0
0.7
Chevron
current
Jul 13, 2026 · 28d
0
10.7
Blue Arrow Operating, LLC
current
Jul 13, 2026 · 28d
0
2.3
Permian Resources
current
Jul 17, 2026 · 24d
12
17.3
Avant Operating II, LLC
current
Jul 17, 2026 · 24d
8
0.0
STRATA PRODUCTION COMPANY
current
Jul 18, 2026 · 23d
1
2.3
Greenlake Energy Operating
current
Jul 19, 2026 · 22d
1
0.7
Mewbourne Oil
current
Jul 21, 2026 · 20d
2
12.7
Matador
current
Jul 24, 2026 · 17d
4
10.7
Mack Energy Corporation
current
Jul 24, 2026 · 17d
1
1.0
Burnett Oil Co., Inc.
current
Jul 25, 2026 · 16d
2
0.0
Diamondback
current
Jul 27, 2026 · 14d
12
28.3
COG (ConocoPhillips)
current
Jul 27, 2026 · 14d
9
15.7
VTX Energy Operating, LLC
current
Jul 27, 2026 · 14d
2
4.0
Devon
current
Jul 28, 2026 · 13d
14
21.7
Admiral Permian Resources, LLC
current
Jul 29, 2026 · 12d
6
4.0
Fasken Oil and Ranch, Ltd.
current
Jul 29, 2026 · 12d
2
4.7
SEM Operating Company, LLC
current
Aug 7, 2026 · 3d
6
0.0
EOG watch: the basin's most conspicuous dark filer —
newest disclosure ended Dec 24, 2025, 229 days ago — yet NM OCD well files show 797 EOG wells
spudded '24–'26 still awaiting completion, the largest drilled-uncompleted backlog in the basin
(see the NM pipeline section). Paperwork dark ≠ inactive.
Biggest jobs of the period
Jobs ended in the last 28 days, ranked by total base water volume. No million-barrel
monsters this period — Pioneer's ~1.12M bbl Midland Co. trio aged out of the window. The top of the
table is a Permian Resources four-well Reeves Co. pad (all ended Jul 17) interleaved with Matador's
four near-identical Lea Co. wells (Jul 24) and a Mewbourne Upton Co. pair — pad siblings, not outliers.
Well names return next issue (not carried in this cycle's extract).
Operator
County
Water (bbl)
Proppant (lbs)
Permian Resources
Reeves, TX
795,000
32,404,000
Mewbourne Oil
Upton, TX
781,000
30,660,000
Matador
Lea, NM
768,000
35,525,000
Matador
Lea, NM
767,000
35,525,000
Matador
Lea, NM
762,000
35,716,000
Matador
Lea, NM
761,000
35,720,000
Mewbourne Oil
Upton, TX
758,000
30,474,000
Permian Resources
Reeves, TX
732,000
30,840,000
Permian Resources
Reeves, TX
706,000
28,454,000
Permian Resources
Reeves, TX
702,000
30,108,000
Where the permits are — the county map book
Every horizontal Texas permit issued in the trailing 365 days with a resolvable surface
location — 3,895 wells across 25 counties — one page per county, ordered by count, coloured by operator.
Each permit is drawn as a line from its surface location toward its permitted bottomhole — the
direction the lateral runs — using the RRC's digital-map well layers (surface, bottomhole and
horizontal-wellbore lines, joined by API). 3,803 of 3,895 permits (97.6%) are drawn as lines; the
92 with no resolvable bottomhole point appear as small gray dots at surface. Colours rank operators
within each county, so the same colour on two pages is two different companies; gray lines are
everyone outside the county's top 8. Frames and gridlines are lat/lon (0.25° graticule); tan lines are the
major highways — interstates and US/state routes from TxDOT's roadway network, labeled where
room allows and good to about a mile — county boundaries still aren't drawn. Sterling Co. debuts
in the book this issue with 2 permits. New Mexico permits aren't plotted (OCD
points weren't staged for mapping this cycle).