Frac jobs disclosed to FracFocus · activity through August 17, 2026 · published August 18, 2026
Read the last columns with a grain of salt. The week ending August 17 shows
1 job on file and the week before it 20, against a settled pace nearer
78 a week — that is filing lag, not a shutdown. Operators have up to about 30 days to
disclose a job to FracFocus, so the newest weeks are only ever a fraction of themselves on
publication day and grow for a month afterward. The faded columns are still arriving; judge the
trend from the solid ones. On the jobs that are settled, the basin is running at about
314 frac jobs per 28 days — and the caveat keeps proving itself: recompute last
issue's settled window from this week's filings and it lands at 327 per 28 days, not the
308 we published. Late filings revise these numbers upward; that is the point of the caveat.
Frac jobs, last 28 days
111
Jul 21 – Aug 17, 2026 · filings still arriving
New Mexico / Texas split
30 / 81
27% of jobs in NM — back toward the run-rate after last issue's 39% spike
Settled pace
≈314 jobs/28d
jobs ended 42–126 days back ÷ 3 — the fully-reported baseline
Avg water per job
598,000 bbl
n = 111 jobs reporting
Avg proppant per job
24,179,000 lbs
n = 93 jobs reporting
Produced / recycled water
78%
of water-source records (70 of 90) · 80 of 111 jobs report source · volume-weighted 79% — a much fuller sample than last issue's 44
Special: a decade of sand per foot — the basin found its number
Midland Basin, nine core counties · FracFocus proppant mass joined to RRC W-2
perforated intervals · 20,393 joined wells surviving the sanity filters, 2016 – Aug 2026 · median lb of sand per
perforated foot by frac year · *2026 is preliminary (n = 256). The whole series was recomputed on this
week's fresh RRC wellbore file, which added 142 newly-perforated 2026 wells and nudged the older
years by a few pounds — read small year-over-year moves against that, not as design changes.
1,474
2016
1,795
2017
1,855
2018
1,852
2019
1,898
2020
1,998
2021
2,002
2022
2,021
2023
2,029
2024
2,037
2025
2,007
2026*
Everyone remembers the loading race. From 2016 to 2018 the median Midland Basin well went from
1,474 to 1,855 lb per perforated foot — a 26% jump in two years, the era when every investor
deck had a "bigger fracs" slide. Then the race just… stopped. Since 2018 the median has crept from
1,855 to 2,037 lb/ft — about 10% in seven years. And this week the 2026 column
came home. Last issue it printed 2,103 on a thin 114 wells; the fresh perf file more than doubled the
sample to 256 and the median settled at 2,007 lb/ft — statistically indistinguishable from 2025.
Call it ~2,000 lb/ft: the design equilibrium the basin settled on once the cost-per-barrel math
stopped rewarding more sand. The apparent 2026 step-up was small-sample noise, and it evaporated on contact
with data.
The sand bill still doubled — but sideways. Median perforated interval went
from 7,642 ft (2016) to 10,536 ft (2025), and median sand per well from 11.8M to
24.7M lb. The growth was laterals, not loading. The 2026 wells joined so far run longer still —
a median 11,719 ft — at the same loading, which is the whole thesis in one line.
Design still isn't monolithic: among 2025–26 completions, Pioneer's
median well takes 30.7M lb (n = 743) against Diamondback's 20.7M (n = 794) — same basin, same benches,
a 10-million-pound difference in what shows up on the pad.
Method: proppant = disclosed mass of
crystalline silica (CAS 14808-60-7) summed per disclosure; perforated interval = RRC W-2/G-1 perf
span joined by API (2,000–20,000 ft sanity); medians throughout; filings over 100M lb excluded as data errors; a perf span
from a recompletion can differ from the original lateral — a small minority of joins. The joined-well
count is taken after the sand and lateral filters. 2026 reflects wells both frac'd and filed with the
RRC — it will keep drifting as the year fills in, as this week's revision shows.
Weekly frac job count — trailing 13 weeks
By job end date. Faded columns are recent weeks still filling in — operators have up to ~30 days
to file, so the newest weeks always start low and grow. The week ending Aug 17 has 1 job on file;
that is normal at publication, not a stoppage — last issue's newest week printed 2 and has since grown to 20.
93
5/25
62
6/1
34
6/8
94
6/15
68
6/22
80
6/29
47
7/6
87
7/13
43
7/20
49
7/27
41
8/3
20
8/10
1
8/17
TexasNew Mexicostill filing
Permian rig count — 265 +2 wk/wk
Active drilling rigs in the Permian, weekly · latest 2026-08-14 · the basin peaked at
318 rigs in Apr 2024 and has now climbed eight straight weeks off its
February low of 238 to 265, the highest print since mid-July 2025, when the count was on its way down through 265 · Source: Baker Hughes
Drilling vs completions pace — trailing 30 weeks
Rigs drill the wells; frac crews complete them. Orange is Permian rigs; blue is frac jobs
ended each week from FracFocus — the blue line's newest weeks are unfiled, not idle (judge it from the
middle of the series). Rigs have put together an eight-week climb while the settled completion pace has
been broadly flat; that gap is the DUC build showing up in real time. The national frac-spread series
remains unsourced this issue. · Sources: Baker Hughes; FracFocus
Permian rigsFrac jobs/week (FracFocus)
Most active operators
Bar & big number = settled pace (wells/28d from jobs ended 42–126 days back);
gray number = jobs filed in the last 28 days. Occidental holds the top slot at 30.3 with
Diamondback close behind at 29.3 — last issue's provisional flip survived a week of new filings.
Cimarex jumps to 19.3, the biggest gainer in the book. Method note:
operators are shown as filed on the disclosure — no ownership roll-ups — so Pioneer and XTO (both
ExxonMobil), and Cimarex (Coterra, now Devon) appear separately. Operators marked · / ·· file
moderately / slowly, so recent filings alone understate them. EOG is absent entirely — nothing
disclosed since Dec 2025.
Occidental ·
30.3
0
Diamondback
29.3
31
Permian Resources
20.7
6
Pioneer (ExxonMobil)
20.7
4
Devon
20.0
8
Cimarex (Coterra/Devon)
19.3
0
COG (ConocoPhillips)
16.0
12
XTO (ExxonMobil)
15.3
15
Apache ·
15.0
0
Mewbourne Oil
11.0
4
Civitas (SM Energy)
10.7
7
Chevron
9.7
0
Matador
9.0
8
HighPeak Energy ·
6.7
0
Activity by county
Jobs ended in last 28 days (sums to 111). Glasscock leads at 19 — Midland
recovered to 16 after printing just 2 last issue, which is exactly the filing-lag catch-up the lead warns about.
Glasscock, TX
19
Eddy, NM
16
Midland, TX
16
Lea, NM
14
Upton, TX
12
Loving, TX
10
Howard, TX
7
Martin, TX
6
Reeves, TX
4
Irion, TX
3
Crane, TX
2
Winkler, TX
1
Ector, TX
1
Completion pipeline — New Mexico (work coming to a pad near you)
From NM OCD well records (queried Aug 18), horizontal wells in Lea / Eddy / Chaves / Roosevelt:
8,404 approved permits not yet spudded (the drilling backlog — includes stale, unexercised permits of
all vintages) and 4,435 wells spudded 2024–2026 still carried as "New" — drilled or drilling with no
completion on record, the OCD's closest thing to a DUC list. Both grew this week (+93 and +21).
EOG alone added 63 unspudded permits — two-thirds of the basin's net permit build — while filing
nothing to FracFocus since December. Every well in that second column needs a frac
crew and a drillout. Operators as filed with the OCD; parentheses note current owners.
Operator
Permits (unspudded)
Spudded '24–'26, awaiting completion
Top county
Devon
1,377
440
Lea
EOG Resources
1,012
799
Lea
Permian Resources
731
462
Eddy
Mewbourne Oil
601
537
Eddy
Matador
662
342
Lea
Coterra (Cimarex)
678
249
Lea
XTO (ExxonMobil)
305
583
Eddy
Occidental
486
221
Eddy
COG (ConocoPhillips)
533
29
Lea
Chevron
263
271
Eddy
ConocoPhillips
241
24
Eddy
Spur Energy Partners
140
110
Eddy
Civitas (SM Energy)
171
61
Lea
Riley Permian
200
16
Eddy
Completion pipeline — Texas permit backlog
RRC drilling permit master, Aug 8 vintage — unchanged since last issue (daf804 is a
monthly file and no newer drop exists as of Aug 18), so this chart and the permit columns further down repeat
last issue's windows rather than pretending to be new. 4,782 permits issued Aug 2025 – Aug 7, 2026
in the Permian counties, 86% horizontal. July is a complete month at 396 permits;
August is partial — the file runs only through Aug 7, so the last column is a stub, not a cliff.
Permits lead the frac by six to twelve months.
308
8/25
371
9/25
475
10/25
236
11/25
305
12/25
491
1/26
327
2/26
422
3/26
473
4/26
468
5/26
408
6/26
396
7/26
102
8/26
Permit holders — trailing 12 months
Permits issued Aug 2025 – Aug 7, 2026 by operator, resolved from the P-5 number by API join
to FracFocus filings (93.5% via FracFocus P-5-number vote (4473/4782)). Anadarko-numbered permits are counted under Occidental.
Operator
Permits
Pioneer Natural Resources
588
Occidental Oil and Gas
508
Diamondback E&P LLC
480
Unknown
309
COG Operating LLC
198
Ovintiv USA Inc.
157
Apache Corporation
148
Continental Resources, Inc
127
DE Central Operating, LLC
127
Blackbeard Operating
124
Kinder Morgan
100
Permian Resources Operating, LLC
100
Permit counties — trailing 12 months
Same window, by county. Midland still leads, but the Delaware side (Loving, Reeves) now
carries as many permits between two counties as the Midland Basin core does.
County
Permits
Midland
626
Loving
485
Upton
482
Reeves
459
Martin
441
Glasscock
267
Reagan
253
Andrews
229
Crane
177
Ector
177
Gaines
175
Howard
151
Smaller operators to watch
Everyone outside the top-10 settled list with 3+ completions since March 8 —
the private and mid-cap programs that buy sand, water, and services every month without making headlines.
Large independents (Mewbourne, Civitas, Matador, Ovintiv, Continental) are excluded regardless of count.
Green dates = a job ended inside the last ~30 days,
i.e. a crew was just there. Service co. from supplier records where identifiable.
Operator
Jobs (5 mo)
Top counties
Service co. (ID'd)
Median water (bbl)
Newest job
BPX
30
Reeves TX, Loving TX
Halliburton
402,000
2026-05-30
FireBird Energy II
25
Upton TX, Ector TX
—
491,000
2026-06-10
VTX Energy
25
Reeves TX
NexTier (Patterson-UTI)
618,000
2026-07-27
HighPeak Energy
22
Howard TX, Borden TX
Liberty
467,000
2026-07-03
Blackbeard Operating
21
Crane TX
—
145,000
2026-07-23
Spur Energy Partners
20
Eddy NM
Halliburton
281,000
2026-07-23
Fasken Oil and Ranch
20
Andrews TX, Midland TX
—
510,000
2026-07-29
Double Eagle (DE Central)
19
Reagan TX, Glasscock TX
NexTier (Patterson-UTI)
577,000
2026-05-07
Blue Arrow
18
Reeves TX, Pecos TX
—
633,000
2026-07-13
Avant Operating II, LLC
17
Lea NM
Liberty
341,000
2026-07-17
Summit Petroleum
13
Upton TX
FTS International
781,000
2026-05-25
Basin Oil and Gas
12
Winkler TX, Terry TX
—
4,000
2026-07-22
BTA Oil Producers
11
Crane TX, Lea NM
FTS International
668,000
2026-05-25
Kaiser-Francis Oil
11
Lea NM
Liberty
459,000
2026-05-01
Strata Production
11
Eddy NM, Lea NM
—
51,000
2026-07-18
Crescent Energy
10
Glasscock TX, Reeves TX
ProFrac
641,000
2026-06-22
Completion intensity by operator
Median job design over each operator's trailing 12 months · operators with
≥8 jobs and a disclosure inside the last 6 months · sand in millions of lbs, water in thousands of bbl ·
lateral and lb/ft come from the RRC perf-interval join, which trails the frac by 3–6 months — for these
operators' recent wells there is still no perf record, so those columns stay blank ("—") rather than guessed.
The basin-wide perf join is shown properly in the sand-per-foot special above, where the history is deep enough
to be honest.
Operator
Jobs
Median sand (M lbs)
Median water (k bbl)
Median lateral (ft)
Sand (lbs/ft)
Petroplex Energy
20
38.9
744
—
—
Discovery Natural Resources
15
35.1
1206
—
—
Rp
10
33.7
1042
—
—
Black Swan Oil & Gas
17
32.4
784
—
—
PBEX Operations
14
31.3
696
—
—
Continental Resources
39
30.0
762
—
—
Hannathon Petroleum II
13
29.5
644
—
—
Pioneer (ExxonMobil)
452
29.3
635
—
—
HighPeak Energy
43
29.1
502
—
—
Sabalo II Operating
15
28.9
539
—
—
Summit Petroleum
31
28.7
547
—
—
XTO (ExxonMobil)
279
27.1
494
—
—
Blue Arrow
24
27.1
631
—
—
Double Eagle (DE Central)
81
27.0
578
—
—
Paloma Permian
22
26.2
563
—
—
BTA Oil Producers
33
26.1
588
—
—
VTX Energy
28
25.3
628
—
—
Civitas (SM Energy)
165
25.2
589
—
—
Water & sand by well depth (TVD)
Trailing 12 months, both states, by disclosed true vertical depth. The shallow band is a
different business — a third of the sand and half the water of everything below 7,000 ft. Above that line the
design is remarkably flat: from 7,000 ft to past 12,000 ft the median job barely moves, which is the
lateral-length story again rather than a depth story.
TVD band
Jobs
Median water (bbl)
Median proppant (lbs)
of which NM
under 7,000 ft
325
282,000
7,638,000
82
7,000 – 9,000
1,652
512,000
23,401,000
333
9,000 – 10,500
1,658
524,000
25,047,000
569
10,500 – 12,000
901
511,000
24,570,000
450
over 12,000 ft
317
531,000
24,678,000
195
Water & sand by target formation — Texas
Texas jobs ended in the trailing 12 months (3,225), formation from the RRC wellbore join —
1,978 named (61%). This section changes method from last issue, which used a
28-day window and could only name 6 of 51 jobs. A 12-month window is the honest unit for this join: the RRC
completion filing trails the frac by months, so a fresh window can never say anything about benches. Rows with
fewer than 10 named jobs are dropped. New Mexico is excluded (the OCD pool join was not refreshed this cycle).
Because the RRC filing trails the frac, the named rows still skew toward operators that file promptly.
Formation
Jobs
Median water (bbl)
Median proppant (lbs)
Sand (lbs/ft)
Spraberry
778
539,000
24,678,000
2208
Wolfcamp
692
545,000
24,402,000
2355
Bone Spring
193
503,000
25,400,000
2475
Dean
119
530,000
26,449,000
2532
Delaware Mtn
89
521,000
24,487,000
2425
Strawn
38
758,000
32,121,000
2705
San Andres
23
471,000
23,132,000
2177
Grayburg
13
491,000
26,056,000
2402
Queen
11
666,000
30,710,000
2218
Current conditions — fleets likely on location (inferred)
Inferred from disclosure cadence: a pad (operator + surface location, ~1 km grid) whose
latest job ended within ~1.5× that pad's own median gap between filing dates is probably still being
pumped or just finishing — 38 pads pass the test this issue (71 last issue). Several large
operators batch-date a whole pad's wells to one end date, which hides their cadence — so this view skews
toward smaller, steadier programs. Disclosures lag the frac by up to 30 days; treat this as a floor and a
lead list, not a map. The "recently released" rows are the freshest pads whose own cadence says the crew
has moved on.
Status
Operator
Service co.
County
Wells so far
Pad gap (d)
Last job end
🟢 Likely on location
Ring Energy
—
Ector, TX
4
30
Aug 11
🟢 Likely on location
Pioneer (ExxonMobil)
Halliburton
Midland, TX
4
8
Aug 9
🟢 Likely on location
COG (ConocoPhillips)
—
Loving, TX
4
3
Aug 7
🟢 Likely on location
Diamondback
Halliburton
Glasscock, TX
11
6
Aug 5
🟢 Likely on location
Diamondback
Halliburton
Howard, TX
11
490
Aug 4
🟢 Likely on location
Civitas (SM Energy)
Liberty
Upton, TX
8
336
Jul 31
🟢 Likely on location
COG (ConocoPhillips)
Halliburton
Martin, TX
7
16
Jul 26
🟢 Likely on location
Burnett Oil
—
Eddy, NM
4
60
Jul 25
🟢 Likely on location
Burnett Oil
—
Eddy, NM
3
111
Jul 22
🟢 Likely on location
Strata Production
—
Eddy, NM
2
165
Jul 18
⚪ Recently released
Mewbourne Oil
NexTier (Patterson-UTI)
Reeves, TX
6
1
Aug 2
⚪ Recently released
XTO (ExxonMobil)
NexTier (Patterson-UTI)
Midland, TX
7
10
Jul 30
⚪ Recently released
Diamondback
Halliburton
Midland, TX
21
6
Jul 29
⚪ Recently released
Devon
—
Lea, NM
10
6
Jul 28
⚪ Recently released
Devon
—
Lea, NM
12
9
Jul 28
Frac service companies — who's pumping for whom
Pressure pumper identified on 61% of the last 12 months' jobs (2,983 of 4,854) —
from FracFocus supplier records directly, plus same-pad propagation (a labeled sibling well within the pad
names the crew). Method note, honestly: coverage reads 61% against last issue's 60%, but about a
point and a half of that is BJ Energy Solutions being matched for the first time — it was always in the
data, just missing from our name list, and the "FTSI" spelling of FTS International is now caught too.
Like-for-like the coverage is flat. KLX is deliberately excluded: it is coil and wireline work, not a frac fleet.
"Not identified" jobs are genuinely unlabeled in public data — largely self-sourcing operators and ProPetro's
current work — so shares are a floor, not a census.
Service co.
Jobs (12 mo)
Halliburton
1,302
NexTier (Patterson-UTI)
696
Liberty
597
ProFrac
232
FTS International
84
BJ Energy Solutions
43
SLB
29
Not identified
1,871
Implied frac fleets & drillout demand
Transparent math, two assumptions: a frac fleet turns ~5.6 wells per 28 days
(the basin-average throughput calibrated in the July issue: 398 wells ↔ 71 fleet-equivalents), and a
coil/workover unit drills out ~6 wells per month. Fleet-equivalents = settled wells/28d ÷ 5.6;
drillout units = wells/28d ÷ 6. Method note: too many operators batch-date pad filings for per-pad
cadence to be reliable, so a single basin-average throughput is used — simul-frac heavy operators'
true crew counts run lower than shown, and slower programs' higher. Basin total on this basis:
314 wells/28d ≈ 56 fleet-equivalents and ≈ 52 drillout units kept busy — one more
fleet and one more drillout unit than last issue's book.
Operator
Wells / 28d (settled)
Implied fleet-equiv.
Implied drillout units
Occidental
30.3
5.4
5.1
Diamondback
29.3
5.2
4.9
Permian Resources
20.7
3.7
3.4
Pioneer (ExxonMobil)
20.7
3.7
3.4
Devon
20.0
3.6
3.3
Cimarex (Coterra/Devon)
19.3
3.5
3.2
COG (ConocoPhillips)
16.0
2.9
2.7
XTO (ExxonMobil)
15.3
2.7
2.6
Apache
15.0
2.7
2.5
Mewbourne Oil
11.0
2.0
1.8
Civitas (SM Energy)
10.7
1.9
1.8
Chevron
9.7
1.7
1.6
Matador
9.0
1.6
1.5
HighPeak Energy
6.7
1.2
1.1
Estimated completion spend — run-rate per 28 days
Correction issued 2026-09-01
This card originally printed $10.15M per job and
$3.18B per 28 days. Both numbers were wrong. They were too high by about
2.4× — an overstatement of roughly $5.9M per well and
$1.8B per 28 days.
The fault was structural, not a mistyped constant. The old model priced the pumping spread as sand-throughput days: it divided the job's disclosed proppant by an assumed 500,000 lb of sand per day and charged $180,000 a day against the result. On this issue's median settled job (24,844,652 lb of sand) that is 50 pumping days and $8.94M of pumping alone — about 88% of the whole published cost. No Permian well takes fifty days to pump; a modern zipper or simul-frac spread places 3–5 million lb a day, so the real figure is a week or so. Everything downstream of that term inherited the error.
Only the cost is corrected. The settled pace, the job counts, the operator tables and every other figure in this issue are reprinted exactly as they were published — the defect never touched them.
Cost per median settled well
$4.24M
was $10.15M
Per completed lateral foot
$409
was ≈$980/ft
Basin run-rate per 28 days
$1.33B
was $3.18B · on the same 313.7 settled pace
As published
Corrected
Cost per median settled well
$10.15M
$4.24M
Per completed lateral foot
≈$980
$409
Basin run-rate per 28 days
$3.18B
$1.33B
Settled pace, jobs / 28 days
313.7
313.7
Line
Basis
Rate
Median well
Pumping spread & stimulation service
$ / lateral ft
$125
$1,295,125
Wireline, plugs & pumpdown
$ / lateral ft
$50
$518,050
Chemicals & additives
$ / lateral ft
$20
$207,220
Site, rentals, supervision, fuel & other
$ / lateral ft
$30
$310,830
Proppant delivered
$ / lb on the job's sand
$0.016
$397,514
Water, produced / recycled
$ / bbl × 75.8% of the barrels
$0.50
$199,163
Water, fresh
$ / bbl × the remaining 24.2%
$1.10
$139,887
Drillout — coil or workover rig
flat $ / well
$350,000
$350,000
Flowback & early production
flat $ / well
$225,000
$225,000
Tubing, wellhead & surface facilities
flat $ / well
$600,000
$600,000
Total
10,361 ft of completed lateral
$409 / ft
$4,242,789
The basis. Completion cost is now built per lateral foot: four foot-priced lines — pumping spread and stimulation service, wireline/plugs/pumpdown, chemicals and additives, and site, rentals, supervision, fuel and other — at $225 per completed foot combined; two pass-throughs priced on the job's own measured volumes — proppant at $0.016/lb on the disclosed sand, and water split by the disclosed produced/recycled share; and three flat per-well lines — drillout, flowback and early production, and tubing, wellhead and surface facilities. The sand-throughput day term is gone entirely.
Where the lateral comes from, and what is wrong with it. The 10,361 ft is a perforated interval, not a drilled lateral, and it is not this issue's wells. It is the median perf span of the lagged cohort: Texas wells completed 6 to 12 months before this issue (n = 1,560, 81% TX coverage). It has to be, because RRC perforation records land 4 to 8 months after the frac — the direct join on this issue's own settled jobs is 3.2%, and on a 28-day window it is essentially zero. A current-window lateral does not exist. Worse, the few recent joins are biased large — prompt filers are big-job operators — so using them would overstate the median. New Mexico has no perforation source at all: dbf900 is a Texas RRC file, only 7 of 15,652 NM disclosures ever join, and NM is a third of every window. The foot priced here is therefore a Texas perforated foot applied basin-wide. For scale, the median permitted lateral this issue is 11,226 ft, 8% longer — the expected heel/toe standoff between drilled and perforated.
The sanity check that should have caught this. The old number was $10.15M on a ~10,361 ft well. Divide it by the lateral: ≈$980 per foot for the completion alone — more than the all-in drilling-and-completion cost per foot of every public Permian operator, which runs about $675–$1,035/ft (Permian Resources at $675–685/ft; Matador at $835–855/ft; Civitas Delaware at $880/ft). A completion-only number cannot exceed an all-in number. The rebuilt figure lands at $409/ft, implying roughly $709/ft all-in once about $300/ft of drilling is added — inside the operator band rather than above it. Standing rule: check any well cost per lateral foot against operator guidance before it ships.
Pricing the median understates the basin. The lateral distribution is bimodal, not a bell: on the well-covered cohort 38% of wells fall in the 10,000–11,000 ft (two-mile) band and 14% in the 15,000–16,000 ft (three-mile) band — roughly one job in seven is a three-miler. A median-only model prices those wells light. Holding these rates and moving only the lateral: a p25 9,993 ft well costs $4.16M and a p75 13,386 ft well costs $4.92M, against $4.24M at the median. The basin run-rate above is therefore a floor, not a midpoint.
This issue's quantities were recomputed on current data. No FracFocus snapshot of the August 17 vintage was retained, so the settled-window lateral, sand, water and produced-water share used above were re-derived from today's FracFocus extract rather than from the data this issue actually ran on. Those quantities have since been revised by late filings. The settled pace printed above is the original published 313.7, not a restatement — this correction changes the cost and nothing else.
The per-operator table has been withdrawn, not corrected. It was generated by the same defective model. Rebuilding it needs per-operator lateral, sand and water for this window, and the retained inputs do not support that at operator granularity. Publishing a corrected basin figure beside an uncorrected operator table would be worse than dropping it.
Estimates, not invoices — a rate card, not an AFE. Rates: spend_rate_card_2026-09-01.xlsx, rates provisional pending sign-off. Quantities: FracFocus (proppant, water, water source) and RRC dbf900 perforation records, via build/spend_inputs.json. Jul 21 is unaffected: it used a per-stage model of its own, back-tested at ≈$424 per completed foot, which is where this rebuild independently lands.
What the wells actually made — IP90 after the frac
Texas refreshed, New Mexico still frozen. The RRC PDQ dump is
monthly (still the Jul 27 vintage) but was re-joined against this week's FracFocus cohort, which added two
newly-eligible Texas wells. The NM OCD portal's bot protection on our C-115 route hardened further this week —
every request now redirects to a human-verification page — so New Mexico's volumes are carried at their
Aug 5 vintage. The NM cohort itself is unchanged, so those rows are the same data by the same method,
not a silent reuse.
Wells frac'd July 2024 – Feb 2026, 6,155 with a clean 90-day production window
(2,843 New Mexico + 3,312 Texas). New Mexico: true well-level oil volumes from OCD C-115 filings, all
3,175 cohort wells queried. Texas: oil + condensate from RRC lease-level filings, restricted to
single-well leases — leases carrying exactly one wellbore on the proration schedule, so lease
volumes are well volumes with no pad allocation; that keeps 3,312 of 6,701 TX cohort wells
(49%; the rest sit on multi-well leases) and is stricter than July's pad-allocation method, so well
counts are not comparable to that issue. Wells with production predating the frac (refracs, legacy leases) excluded.
IP90 = oil over the first three reported production months ÷ 90 days. Median across all 6,155
wells: 693 bopd (NM 762, TX 640); median gas 1,247 mcfd.
Formation
Wells
Median IP90 (bopd/well)
bopd per 1,000 ft
Wolfcamp
2366
693
65
Bone Spring
2049
769
64
Spraberry
1206
639
52
Dean
175
726
55
Clear Fork
136
569
50
Barnett
66
569
62
Yeso
35
225
—
Delaware Mtn
32
590
—
San Andres
24
175
26
Penn
17
298
—
Strawn
12
536
51
Queen
11
438
42
Other / unreported
26
432
28
Operator
Wells
Median IP90 (bopd/well)
ExxonMobil (Pioneer/XTO)
1191
700
Devon (incl. Coterra)
622
895
EOG Resources
540
858
Mewbourne Oil
509
625
Occidental
413
997
Permian Resources
350
674
Diamondback
318
765
Chevron
301
611
ConocoPhillips (COG)
254
763
Matador Production
236
622
Per-1,000-ft columns are Texas-weighted: laterals come
from the RRC perf join (3,211 TX wells) and from OCD completion reports for only 62 NM wells, so a dash
means the lateral sample was under 10. Operator rows here use ownership roll-ups (unlike the rest of the issue)
because the production files are keyed to current operatorship.
Who's ramping, who's easing off
Three signals per operator: settled pace (wells/28d, jobs ended 42–126 days back)
against its own prior three-month window (126–210 days back); TX permits issued in the
trailing 8 weeks (Jun 13 – Aug 7) against the prior 8 weeks (intent — leads the frac 6–12 months; arrows
at ±20%); and jobs filed in the last 28 days as a share of settled pace (a filing-freshness read,
not a slowdown detector — slow filers run low here every issue). The permit columns are unchanged from
last issue — the RRC permit file is monthly and still ends Aug 7 — so read movement in the first
column only. Hover a row for the figures.
Operator
Settled pace /28d
TX permits
Filed last 28d
Reads as
Permian Resources
· 20.7vs 22.0 prior 3 mo
▼ 168 wk to Aug 7 · vs 44 prior 8 wk
6 (29%)
holding pace; a slow filer, so recent weeks understate it
Devon
· 20.0vs 18.7 prior 3 mo
▲ 78 wk to Aug 7 · vs 4 prior 8 wk
8 (40%)
holding pace; a slow filer, so recent weeks understate it
Cimarex (Coterra/Devon)
▲ 19.3vs 15.3 prior 3 mo
▼ 08 wk to Aug 7 · vs 22 prior 8 wk
0 (0%)
pace up on settled filings; permit intake not following yet
COG (ConocoPhillips)
▼ 16.0vs 20.3 prior 3 mo
▲ 518 wk to Aug 7 · vs 30 prior 8 wk
12 (75%)
genuinely easing — filings are current, so the drop is real
Apache
· 15.0vs 14.0 prior 3 mo
▼ 188 wk to Aug 7 · vs 33 prior 8 wk
0 (0%)
holding pace; a slow filer, so recent weeks understate it
Chevron
· 9.7vs 11.0 prior 3 mo
▲ 188 wk to Aug 7 · vs 4 prior 8 wk
0 (0%)
holding pace; a slow filer, so recent weeks understate it
Matador
▼ 9.0vs 11.3 prior 3 mo
—no TX permits (NM program)
8 (89%)
genuinely easing — filings are current, so the drop is real
HighPeak Energy
▲ 6.7vs 2.7 prior 3 mo
▼ 68 wk to Aug 7 · vs 8 prior 8 wk
0 (0%)
pace up on settled filings; permit intake not following yet
Ovintiv
▲ 5.3vs 2.7 prior 3 mo
▼ 178 wk to Aug 7 · vs 29 prior 8 wk
0 (0%)
pace up on settled filings; permit intake not following yet
Blackbeard Operating
▲ 5.0vs 3.7 prior 3 mo
▼ 118 wk to Aug 7 · vs 36 prior 8 wk
2 (40%)
pace up on settled filings; permit intake not following yet
Spur Energy Partners
· 5.0vs 4.7 prior 3 mo
—no TX permits (NM program)
2 (40%)
holding pace; a slow filer, so recent weeks understate it
FireBird Energy II
▼ 5.0vs 6.3 prior 3 mo
▼ 68 wk to Aug 7 · vs 15 prior 8 wk
0 (0%)
off on paper, and filing slowly — likely lag as much as a real slowdown
BPX
▼ 5.0vs 8.7 prior 3 mo
· 98 wk to Aug 7 · vs 9 prior 8 wk
0 (0%)
off on paper, and filing slowly — likely lag as much as a real slowdown
Fasken Oil and Ranch
▲ 4.7vs 2.7 prior 3 mo
▼ 78 wk to Aug 7 · vs 9 prior 8 wk
2 (43%)
pace up on settled filings; permit intake not following yet
VTX Energy
· 4.0vs 4.0 prior 3 mo
▲ 98 wk to Aug 7 · vs 7 prior 8 wk
2 (50%)
holding pace; a slow filer, so recent weeks understate it
Double Eagle (DE Central)
▼ 4.0vs 8.0 prior 3 mo
· 268 wk to Aug 7 · vs 25 prior 8 wk
0 (0%)
off on paper, and filing slowly — likely lag as much as a real slowdown
How current is each operator's paperwork?
Every operator with 8+ Permian disclosures in the trailing 18 months, sorted
worst-first by how old its newest job-end date is. FracFocus has no enforced filing deadline, so this
is a paperwork-currency table, not an activity table — a dark filer can be busy and a current filer can be
idle. Late batches arrive constantly and revise settled pace upward afterward, which is why the lead
recomputes last issue's window every week.
Red = newest job over 120 days old (dark);
amber = 42–120 days (slow);
green = inside 42 days (current).
Split this issue: 15 dark / 23 slow / 25 current — an improvement on
last issue's 19 / 25 / 24, with four operators clearing their backlogs.
Operator
Newest job on file
Filed last 28d
Settled pace /28d
Disclosures, 18 mo
OxyRock
2025-08-28 (354d)
0
0.0
101
Rockport Energy Solutions
2025-10-10 (311d)
0
0.0
9
U.S. Energy Development
2025-11-02 (288d)
0
0.0
8
FourPoint Energy
2025-11-19 (271d)
0
0.0
17
Iron Orchard
2025-12-09 (251d)
0
0.0
8
EOG Resources
2025-12-24 (236d)
0
0.0
329
UpCurve Energy
2025-12-26 (234d)
0
0.0
17
Ike
2026-01-16 (213d)
0
0.0
23
Vital Energy
2026-01-16 (213d)
0
0.0
22
Triple Crown Resources
2026-01-18 (211d)
0
0.0
45
Unitex Oil
2026-02-05 (193d)
0
0.0
8
Hannathon Petroleum II
2026-02-16 (182d)
0
0.0
18
Paloma Permian
2026-02-25 (173d)
0
0.0
22
Petro Hunt
2026-03-25 (145d)
0
0.0
56
ConocoPhillips
2026-04-04 (135d)
0
0.0
13
Manti Tarka Permian
2026-04-22 (117d)
0
0.7
14
Bayswater E&P
2026-04-24 (115d)
0
0.7
30
Petroplex Energy
2026-04-26 (113d)
0
1.7
20
Black Swan Oil & Gas
2026-04-27 (112d)
0
1.3
27
TRP Operating
2026-04-28 (111d)
0
2.0
19
Surge Energy
2026-04-29 (110d)
0
1.3
70
Continental Resources
2026-04-30 (109d)
0
2.3
86
Kaiser-Francis Oil
2026-05-01 (108d)
0
2.0
15
Double Eagle (DE Central)
2026-05-07 (102d)
0
4.0
116
Ovintiv
2026-05-08 (101d)
0
5.3
93
Discovery Natural Resources
2026-05-09 (100d)
0
1.7
29
PBEX Operations
2026-05-12 (97d)
0
1.0
19
BTA Oil Producers
2026-05-25 (84d)
0
1.3
50
Summit Petroleum
2026-05-25 (84d)
0
2.3
58
BPX
2026-05-30 (79d)
0
5.0
96
FireBird Energy II
2026-06-10 (68d)
0
5.0
94
Sabalo II Operating
2026-06-15 (63d)
0
2.3
23
3R Operating
2026-06-21 (57d)
0
2.3
24
Crescent Energy
2026-06-22 (56d)
0
2.0
13
Apache
2026-06-25 (53d)
0
15.0
230
Occidental
2026-06-26 (52d)
0
30.3
597
Permian Deep Rock
2026-06-27 (51d)
0
1.7
28
HighPeak Energy
2026-07-03 (45d)
0
6.7
73
Rp
2026-07-10 (38d)
0
0.7
10
Cimarex (Coterra/Devon)
2026-07-11 (37d)
0
19.3
312
Chevron
2026-07-13 (35d)
0
9.7
311
Blue Arrow
2026-07-13 (35d)
0
1.7
28
Avant Operating II, LLC
2026-07-17 (31d)
0
3.0
17
Strata Production
2026-07-18 (30d)
0
2.3
24
Greenlake Energy
2026-07-19 (29d)
0
0.0
30
Basin Oil and Gas
2026-07-22 (26d)
1
2.0
53
Blackbeard Operating
2026-07-23 (25d)
2
5.0
146
Spur Energy Partners
2026-07-23 (25d)
2
5.0
53
Mack Energy
2026-07-24 (24d)
1
1.0
8
Burnett Oil
2026-07-25 (23d)
2
0.0
13
VTX Energy
2026-07-27 (21d)
2
4.0
39
Devon
2026-07-28 (20d)
8
20.0
342
Permian Resources
2026-07-29 (19d)
6
20.7
386
Fasken Oil and Ranch
2026-07-29 (19d)
2
4.7
85
XTO (ExxonMobil)
2026-07-30 (18d)
15
15.3
440
Civitas (SM Energy)
2026-07-31 (17d)
7
10.7
287
Matador
2026-07-31 (17d)
8
9.0
210
Mewbourne Oil
2026-08-02 (15d)
4
11.0
404
Diamondback
2026-08-05 (12d)
31
29.3
754
COG (ConocoPhillips)
2026-08-07 (10d)
12
16.0
411
Sem
2026-08-07 (10d)
2
0.0
25
Pioneer (ExxonMobil)
2026-08-09 (8d)
4
20.7
750
Ring Energy
2026-08-11 (6d)
1
0.7
20
The EOG problem, again. EOG's newest
Permian disclosure is still 2025-12-24 — 236 days dark, a week older than last issue with
nothing filed in between. Meanwhile New Mexico's regulator shows EOG carrying 799 wells spudded
2024–26 and still awaiting completion — the largest DUC backlog in the basin — and it added
63 new unspudded permits this week alone, the single biggest permit build of any operator.
Paperwork dark is not the same as inactive. Every settled-pace and spend figure in this issue understates
EOG by roughly its entire program, and will keep doing so until the filings land.
Biggest jobs of the period
Jobs ended in the last 90 days, ranked by total base water volume — a wider window than last
issue's 28 days, because at this filing vintage the 28-day window holds too few settled monsters to rank
honestly. Well names are back this issue. Pad siblings dominate the top of any such list: a four- or
six-well pad filed on one end date will fill several rows with near-identical numbers, which is a batch
completion, not six record jobs.
Operator
Well
County
Water (bbl)
Proppant (lbs)
Job end
XTO (ExxonMobil)
BUTTERS 5A 201H
Midland, TX
1,497,000
74,539,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5C 203H
Midland, TX
1,482,000
74,648,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5D 204H
Midland, TX
1,470,000
74,609,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5B 202H
Midland, TX
1,467,000
74,658,000
Jul 2
Pioneer (ExxonMobil)
BUTTERS 5E 205H
Midland, TX
1,408,000
83,714,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5H 208H
Midland, TX
1,400,000
81,452,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5G 207H
Midland, TX
1,399,000
81,906,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5F 206H
Midland, TX
1,311,000
77,926,000
Jun 10
Cimarex (Coterra/Devon)
STATE ROAD RUNNER B 402H
Reeves, TX
1,084,000
46,291,000
May 29
Cimarex (Coterra/Devon)
STATE ROAD RUNNER A 401H
Reeves, TX
1,051,000
44,523,000
May 28
Occidental
TETON 56-2-35-23 J 16H
Reeves, TX
627,000
42,966,000
Jun 13
Occidental
TETON 56-2-35-23 L 17H
Reeves, TX
621,000
42,886,000
Jun 13
Where the permits are — the county map book
Every Texas horizontal drilling permit issued in the trailing 365 days that carries a
surface location — 3,961 permits across 25 counties, one page each, biggest county first. Each permit is
drawn as a line from its surface location toward the permitted bottomhole, so the map shows lateral
direction and length, not just a dot; 98.4% resolve to a line (64 fall back to a gray dot where the RRC
GIS has no wellbore geometry yet). Median drawn lateral this issue: 11,226 ft. Lines are coloured by
the county's top-eight permit holders, everyone else gray. Tan lines underneath are Interstate, US and
state highways from TxDOT — locational context only, no county boundaries are drawn. Permits lead the frac
by six to twelve months, so this is a map of where crews will be, not where they are.
Culberson note: 50 of the 64 dot-fallbacks are in Culberson, where a batch of recent permits has no
GIS wellbore yet — that page looks sparser than the county actually is.