Frac jobs disclosed to FracFocus · activity through August 24, 2026 · published August 25, 2026
Read the last columns with a grain of salt. The week ending August 24 shows
5 jobs on file and the week before it 33, against a settled pace nearer
81 a week — that is filing lag, not a shutdown. Operators have up to about 30 days to
disclose a job to FracFocus, so the newest weeks are only ever a fraction of themselves on
publication day and grow for a month afterward. The faded columns are still arriving; judge the
trend from the solid ones. On the jobs that are settled, the basin is running at about
326 frac jobs per 28 days — and the caveat keeps proving itself: recompute last
issue's settled window from this week's filings and it lands at 339 per 28 days, not the
314 we published. Late filings revise these numbers upward; that is the point of the caveat, and
it is also why Diamondback takes the top operator slot this week: its own prior window recomputes
at 36.7 against the 29.3 we printed, so the move is paperwork landing, not new wells.
Frac jobs, last 28 days
134
Jul 28 – Aug 24, 2026 · filings still arriving
New Mexico / Texas split
34 / 100
25% of jobs in NM — a shade below last issue's 27%
Settled pace
≈326 jobs/28d
jobs ended 42–126 days back ÷ 3 — the fully-reported baseline
Avg water per job
598,000 bbl
n = 134 jobs reporting
Avg proppant per job
25,100,000 lbs
n = 108 jobs reporting
Produced / recycled water
78%
of water-source records (69 of 89) · 89 of 134 jobs report source · volume-weighted 77%
Special: a decade of sand per foot — the basin found its number
Midland Basin, nine core counties · FracFocus proppant mass joined to RRC W-2
perforated intervals · 20,393 joined wells surviving the sanity filters, 2016 – Aug 2026 · median lb of sand per
perforated foot by frac year · *2026 is preliminary (n = 256). Nothing in this series moved this
week, and that is the finding. The RRC wellbore file was not refreshed this cycle — it is still the
Aug 15 vintage — and this week's fresh FracFocus added zero new Midland Basin joins, so every
year reproduces to the pound. The chart is republished unchanged rather than quietly skipped.
1,474
2016
1,795
2017
1,855
2018
1,852
2019
1,898
2020
1,998
2021
2,002
2022
2,021
2023
2,029
2024
2,037
2025
2,007
2026*
Everyone remembers the loading race. From 2016 to 2018 the median Midland Basin well went from
1,474 to 1,855 lb per perforated foot — a 26% jump in two years, the era when every investor
deck had a "bigger fracs" slide. Then the race just… stopped. Since 2018 the median has crept from
1,855 to 2,037 lb/ft — about 10% in seven years, and the preliminary 2026 column sits at
2,007 lb/ft, statistically indistinguishable from 2025. Call it
~2,000 lb/ft: the design equilibrium the basin settled on once the cost-per-barrel math
stopped rewarding more sand.
A flat week is worth saying out loud. Two joins have to move for this chart
to move — a new perforated interval from the RRC and a new proppant mass from FracFocus — and this
cycle neither did. The 2026 sample is still 256 wells; it will keep drifting as the year fills in,
and the next dbf900 drop is the thing to watch, not the next FracFocus refresh.
The sand bill still doubled — but sideways. Median perforated interval went
from 7,642 ft (2016) to 10,536 ft (2025), and median sand per well from 11.8M to
24.7M lb. The growth was laterals, not loading. The 2026 wells joined so far run longer still —
a median 11,719 ft — at the same loading, which is the whole thesis in one line.
Design still isn't monolithic: among 2025–26 completions, Pioneer's
median well takes 30.7M lb (n = 743) against Diamondback's 20.8M (n = 807) — same basin, same benches,
a 10-million-pound difference in what shows up on the pad. That operator line is the one figure in this
card that did move: thirteen late Diamondback filings landed this week, taking its 2025–26 sample from
794 wells to 807 and its median from 20.7M to 20.8M lb. The joined series above is untouched.
Method: proppant = disclosed mass of
crystalline silica (CAS 14808-60-7) summed per disclosure; perforated interval = RRC W-2/G-1 perf
span joined by API (2,000–20,000 ft sanity); medians throughout; filings over 100M lb excluded as data errors; a perf span
from a recompletion can differ from the original lateral — a small minority of joins. The joined-well
count is taken after the sand and lateral filters. 2026 reflects wells both frac'd and filed with the
RRC — it will keep drifting as the year fills in.
Weekly frac job count — trailing 13 weeks
By job end date. Faded columns are recent weeks still filling in — operators have up to ~30 days
to file, so the newest weeks always start low and grow. The week ending Aug 24 has 5 jobs on file;
that is normal at publication, not a stoppage — last issue's newest week printed 1 and has since grown to 33.
65
6/1
34
6/8
101
6/15
77
6/22
90
6/29
54
7/6
93
7/13
52
7/20
59
7/27
63
8/3
33
8/10
33
8/17
5
8/24
TexasNew Mexicostill filing
Permian rig count — 267 +2 wk/wk
Active drilling rigs in the Permian, weekly · latest 2026-08-21 · the basin peaked at
318 rigs in Apr 2024 and has now put together an eighth straight week at or above 256, reaching
267 — up 29 from the February low of 238 and the highest print since late June 2025, when the count was on its way down through 270 ·
Source: Baker Hughes
Drilling vs completions pace — trailing 30 weeks
Rigs drill the wells; frac crews complete them. Orange is Permian rigs; blue is frac jobs
ended each week from FracFocus — the blue line's newest weeks are unfiled, not idle (judge it from the
middle of the series). Rigs have added two more this week while the settled completion pace has been
broadly flat; that gap is the DUC build showing up in real time. The national frac-spread series
remains unsourced this issue. · Sources: Baker Hughes; FracFocus
Permian rigsFrac jobs/week (FracFocus)
Most active operators
Bar & big number = settled pace (wells/28d from jobs ended 42–126 days back);
gray number = jobs filed in the last 28 days. Diamondback takes the top slot at 37.3, ending
Occidental's two-issue run — and it is late filings, not a merger: Diamondback's own prior window
recomputes at 36.7 on this week's data, so the jump from last issue's 29.3 is paperwork catching up.
Occidental, Cimarex and Chevron each filed zero disclosures in the last 28 days, which is filing
lag rather than idleness. Biggest gainers: COG and Chevron, both +2.0. Method note:
operators are shown as filed on the disclosure — no ownership roll-ups — so Pioneer and XTO (both
ExxonMobil), and Cimarex (Coterra, now Devon) appear separately. Operators marked · / ·· file
moderately / slowly, so recent filings alone understate them. EOG is absent entirely — nothing
disclosed since Dec 2025.
Diamondback
37.3
26
Occidental ·
26.3
0
Devon
20.3
15
Permian Resources
20.0
21
Pioneer (ExxonMobil)
19.3
3
COG (ConocoPhillips)
18.7
12
Cimarex (Coterra/Devon) ·
18.7
0
XTO (ExxonMobil)
17.3
5
Apache
14.0
7
Chevron ·
13.3
0
Mewbourne Oil
10.7
6
Matador
10.3
7
Civitas (SM Energy)
8.3
6
Blackbeard Operating
7.3
0
HighPeak Energy ·
6.7
0
FireBird Energy II
5.7
4
Activity by county
Jobs ended in last 28 days (sums to 134). Lea leads at 18, but the movers are
Upton (12 → 17) and Howard (7 → 16); Glasscock, which led last issue at 19, falls back to 13.
Lea, NM
18
Upton, TX
17
Midland, TX
16
Howard, TX
16
Eddy, NM
16
Glasscock, TX
13
Loving, TX
10
Reeves, TX
9
Martin, TX
8
Irion, TX
3
Winkler, TX
3
Andrews, TX
2
Crane, TX
2
Ector, TX
1
Completion pipeline — New Mexico (work coming to a pad near you)
From NM OCD well records (queried Aug 25), horizontal wells in Lea / Eddy / Chaves / Roosevelt:
8,466 approved permits not yet spudded (the drilling backlog — includes stale, unexercised permits of
all vintages) and 4,469 wells spudded 2024–2026 still carried as "New" — drilled or drilling with no
completion on record, the OCD's closest thing to a DUC list. Both grew again this week (+62 and +34), the
DUC build almost entirely 2026 spuds (900, +30). This week the callout flips. For weeks the story was
EOG's unspudded permit stack; it has now ticked down 3 to 1,009 — its first non-build week — while
Devon added 29 to 1,302 on its own filer name — 1,410 once WPX Energy Permian rolls in, as the
table below does — and now leads EOG by roughly 300 permits. EOG's DUC count still grew
(+6 to 805) and is still the largest in New Mexico by a 266-well margin, and EOG has still filed nothing to
FracFocus since December 2025, so the paperwork-dark point stands — the permit-bank story just belongs to
Devon now. Every well in that second column needs a frac crew and a drillout. Operators are grouped into
display families as in previous issues — Devon includes WPX Energy Permian, Permian Resources includes
Earthstone and Admiral, XTO includes both XTO entities, Occidental the three Oxy entities, and COG includes
ConocoPhillips Company; Marathon Oil Permian is shown on its own line. Otherwise as filed with the
OCD; parentheses note current owners.
Operator
Permits (unspudded)
Spudded '24–'26, awaiting completion
Top county
Devon
1,410
443
Lea
EOG Resources
1,009
805
Lea
Permian Resources
725
471
Eddy
Mewbourne Oil
607
539
Eddy
Matador
673
342
Lea
Coterra (Cimarex)
676
259
Lea
XTO (ExxonMobil)
325
583
Eddy
Occidental
482
225
Eddy
COG (ConocoPhillips)
538
29
Lea
Chevron
262
272
Eddy
Marathon Oil (ConocoPhillips)
241
24
Eddy
Spur Energy Partners
139
115
Eddy
Riley Permian
200
19
Eddy
Civitas (SM Energy)
131
43
Lea
Completion pipeline — Texas permit backlog
RRC drilling permit master, Aug 8 vintage — unchanged for a third straight issue
(daf804 is a monthly file; worse, mft.rrc.texas.gov was unreachable from the build host this morning
— the TLS handshake failed — so the vintage could not even be re-checked against the server). This chart and
the two permit tables below therefore repeat last issue's windows rather than pretending to be new; the
September cut is due around Sep 9–10. 4,782 permits issued Aug 2025 – Aug 7, 2026
in the Permian counties, 85.7% horizontal. July is a complete month at 396 permits;
August is partial — the file runs only through Aug 7, so the last column is a stub, not a cliff.
Permits lead the frac by six to twelve months.
308
8/25
371
9/25
475
10/25
236
11/25
305
12/25
491
1/26
327
2/26
422
3/26
473
4/26
468
5/26
408
6/26
396
7/26
102
8/26
Permit holders — trailing 12 months
Permits issued Aug 2025 – Aug 7, 2026 by operator, resolved from the P-5 number by API join
to FracFocus filings (93.5% via FracFocus P-5-number vote (4473/4782)). Anadarko-numbered permits are counted under Occidental.
Naming changed this issue: these rows now carry the same normalised operator names used everywhere else in
the issue ("Pioneer", "Diamondback", "Double Eagle (DE Central)") instead of the raw filer strings last issue
printed ("Pioneer Natural Resources", "Diamondback E&P LLC", "DE Central Operating, LLC"). Counts are
unchanged for every major holder — Pioneer 588, Occidental 508, Diamondback 480 and COG 198 all reproduce
exactly — with one exception: Permian Resources reads 164 rather than 100, because Admiral Permian
Resources now folds into it, matching how the weekly operator table has always treated it.
Operator
Permits
Pioneer (ExxonMobil)
588
Occidental
508
Diamondback
480
Unknown
309
COG (ConocoPhillips)
198
Permian Resources
164
Ovintiv
157
Apache
148
Continental Resources
127
Double Eagle (DE Central)
127
Blackbeard Operating
124
Kinder Morgan
100
Permit counties — trailing 12 months
Same window, by county — and the same Aug 8 file, so these are last issue's counts to the
permit. Midland still leads, but the Delaware side (Loving, Reeves) now
carries as many permits between two counties as the Midland Basin core does.
County
Permits
Midland
626
Loving
485
Upton
482
Reeves
459
Martin
441
Glasscock
267
Reagan
253
Andrews
229
Crane
177
Ector
177
Gaines
175
Howard
151
Smaller operators to watch
Everyone outside the top-10 settled list with 3+ completions since March 15 —
the private and mid-cap programs that buy sand, water, and services every month without making headlines.
Large independents (Mewbourne, Civitas, Matador, Ovintiv, Continental) are excluded regardless of count.
Green dates = a job ended inside the last ~30 days,
i.e. a crew was just there. Service co. from supplier records where identifiable.
Operator
Jobs (5 mo)
Top counties
Service co. (ID'd)
Median water (bbl)
Newest job
Blackbeard Operating
32
Crane TX
—
126,000
2026-07-23
FireBird Energy II
28
Upton TX, Ector TX
—
488,000
2026-08-02
BPX
25
Reeves TX, Loving TX
Halliburton
486,000
2026-05-30
VTX Energy
25
Reeves TX
NexTier (Patterson-UTI)
618,000
2026-07-27
Surge Energy
22
Howard TX, Borden TX
NexTier (Patterson-UTI)
417,000
2026-08-11
Fasken Oil and Ranch
20
Andrews TX, Midland TX
—
510,000
2026-07-29
HighPeak Energy
20
Howard TX, Borden TX
Liberty
480,000
2026-07-03
Spur Energy Partners
19
Eddy NM
Halliburton
282,000
2026-07-23
BTA Oil Producers
18
Crane TX, Lea NM
FTS International
678,000
2026-08-12
Double Eagle (DE Central)
18
Reagan TX, Glasscock TX
NexTier (Patterson-UTI)
578,000
2026-05-07
Avant Operating II, LLC
17
Lea NM
Liberty
341,000
2026-07-17
Triple Crown Resources
15
Irion TX
—
529,000
2026-06-23
TRP Operating
15
Loving TX
—
542,000
2026-07-09
Blue Arrow
15
Reeves TX, Pecos TX
—
631,000
2026-07-13
Basin Oil and Gas
14
Winkler TX, Terry TX
—
4,000
2026-08-17
Summit Petroleum
13
Upton TX
ProFrac
781,000
2026-05-25
Completion intensity by operator
Median job design over each operator's trailing 12 months · operators with
≥8 jobs and a disclosure inside the last 6 months, sorted by median sand · sand in millions of lbs, water in thousands of bbl ·
lateral and lb/ft come from the RRC perf-interval join, which trails the frac by 3–6 months — and the RRC
wellbore file was not refreshed this cycle, so for these operators' recent wells there is still no perf
record. Those two columns stay blank ("—") rather than guessed: the thin sample that does join is badly biased
(it would have printed Mewbourne at 2,906 lb/ft off a handful of New Mexico joins).
The basin-wide perf join is shown properly in the sand-per-foot special above, where the history is deep enough
to be honest.
Operator
Jobs
Median sand (M lbs)
Median water (k bbl)
Median lateral (ft)
Sand (lbs/ft)
Petroplex Energy
20
38.9
744
—
—
SM Energy
16
36.0
871
—
—
Hibernia Resources IV
18
34.8
672
—
—
RP Operating
10
33.7
1042
—
—
PBEX Operations
14
31.3
696
—
—
Discovery Natural Resources
21
30.7
1127
—
—
Continental Resources
38
30.3
772
—
—
Pioneer (ExxonMobil)
438
29.6
639
—
—
HighPeak Energy
43
29.1
502
—
—
BTA Oil Producers
40
29.1
616
—
—
Sabalo II Operating
15
28.9
539
—
—
Summit Petroleum
31
28.7
547
—
—
Tap Rock
20
27.2
607
—
—
XTO (ExxonMobil)
298
27.1
512
—
—
Blue Arrow
24
27.1
631
—
—
Paloma Permian
22
26.2
563
—
—
Double Eagle (DE Central)
73
26.2
577
—
—
VTX Energy
28
25.3
628
—
—
Water & sand by well depth (TVD)
Trailing 12 months, both states, by disclosed true vertical depth. The shallow band is a
different business — a third of the sand and just over half the water of everything below 7,000 ft. Above that line the
design is remarkably flat: from 7,000 ft to past 12,000 ft the median job barely moves, which is the
lateral-length story again rather than a depth story. The shallow band gained 41 jobs against last issue, all of it late filings carrying older job-end dates
rather than new work — it is a Crane / Eddy / Howard book run by Blackbeard, Spur, HighPeak and Surge.
TVD band
Jobs
Median water (bbl)
Median proppant (lbs)
of which NM
under 7,000 ft
366
285,000
7,666,000
82
7,000 – 9,000
1,642
513,000
23,430,000
338
9,000 – 10,500
1,665
529,000
25,216,000
571
10,500 – 12,000
883
512,000
24,601,000
434
over 12,000 ft
317
533,000
24,713,000
200
Water & sand by target formation — Texas
Texas jobs ended in the trailing 12 months (3,248), formation from the RRC wellbore join —
1,990 named (61%). The 12-month window is the honest unit for this join: the RRC
completion filing trails the frac by months, so a 28-day window could name only 6 of 51 jobs when it was tried.
Raw RRC bench strings are bucketed to the named formations (all the Bone Spring sands and lime members roll
into Bone Spring; Brushy, Cherry and Bell Canyon into Delaware Mtn). Rows with
fewer than 10 named jobs are dropped — which this cycle removes Strawn (6), Grayburg (8) and Barnett.
New Mexico is excluded (the OCD pool join was not refreshed this cycle). lb/ft is the median of per-well
sand ÷ perf span with a 2,000–20,000 ft gate, and prints "—" where fewer than 10 wells in the row carry a
perf record. Because the RRC filing trails the frac, the named rows still skew toward operators that file promptly.
Formation
Jobs
Median water (bbl)
Median proppant (lbs)
Sand (lbs/ft)
Spraberry
783
548,000
24,871,000
2,006
Wolfcamp
655
551,000
24,501,000
2,266
Bone Spring
208
501,000
25,425,000
2,497
Dean
113
554,000
26,722,000
2,068
Clear Fork
112
495,000
18,111,000
1,758
Delaware Mtn
40
612,000
24,225,000
2,370
San Andres
30
616,000
27,041,000
2,228
Penn
20
491,000
27,068,000
—
Queen
10
695,000
30,710,000
2,185
Current conditions — fleets likely on location (inferred)
Inferred from disclosure cadence: a pad (operator + surface location, ~1 km grid) whose
latest job ended within ~1.5× that pad's own median gap between filing dates is probably still being
pumped or just finishing — 76 pads pass the test this issue against 38 last issue. Almost
all of that jump is filings, not fleets: recompute last issue's window on this week's data and the same rule
returns 78, the same late-batch revision the lead describes. There is no minimum-days floor in the rule, so a
pad whose own cadence runs to several months passes on a several-month-old date — read the "pad gap" column
before reading the status. Several large
operators batch-date a whole pad's wells to one end date, which zeroes their measured gap and drops them
out entirely — so this view skews
toward smaller, steadier programs. Disclosures lag the frac by up to 30 days; treat this as a floor and a
lead list, not a map. The "recently released" rows are the freshest pads whose own cadence says the crew
has moved on.
Status
Operator
Service co.
County
Wells so far
Pad gap (d)
Last job end
🟢 Likely on location
Basin Oil and Gas
—
Winkler, TX
7
156
Aug 17
🟢 Likely on location
Basin Oil and Gas
—
Winkler, TX
5
190
Aug 13
🟢 Likely on location
Surge Energy
NexTier (Patterson-UTI)
Howard, TX
6
155
Aug 11
🟢 Likely on location
Ring Energy
—
Ector, TX
4
30
Aug 11
🟢 Likely on location
Basin Oil and Gas
—
Winkler, TX
8
89
Aug 10
🟢 Likely on location
Surge Energy
NexTier (Patterson-UTI)
Howard, TX
8
92
Jul 31
🟢 Likely on location
Burnett Oil
—
Eddy, NM
15
78
Jul 25
🟢 Likely on location
Blackbeard Operating
—
Crane, TX
6
105
Jul 23
🟢 Likely on location
Burnett Oil
—
Eddy, NM
6
204
Jul 22
🟢 Likely on location
Basin Oil and Gas
—
Winkler, TX
2
805
Jul 22
⚪ Recently released
COG (ConocoPhillips)
Halliburton
Martin, TX
15
0
Aug 18
⚪ Recently released
Permian Resources
—
Eddy, NM
2
1
Aug 18
⚪ Recently released
Permian Resources
—
Reeves, TX
3
0
Aug 18
⚪ Recently released
Devon
FTS International
Lea, NM
11
2
Aug 13
⚪ Recently released
Matador
Halliburton
Lea, NM
12
0
Aug 13
Frac service companies — who's pumping for whom
Pressure pumper identified on 61.2% of the last 12 months' jobs
(2,982 of 4,873) —
from FracFocus supplier records directly, plus same-pad propagation (a labeled sibling well within the pad
names the crew). Coverage is flat like-for-like against last issue's 61%: the name list did not change
this week, so the movement is jobs, not method. ProFrac and FTS International are shown separately,
as published — the raw matcher folds FTSI and the old U.S. Well Services spelling into ProFrac, and splitting
them back out gives ProFrac 300 and FTS International 65.
KLX is deliberately excluded: it is coil and wireline work, not a frac fleet. The rows below sum to
3,091 against 2,982 identified jobs, because 109 jobs name
more than one pumper and are counted under each.
"Not identified" jobs are genuinely unlabeled in public data — largely self-sourcing operators and ProPetro's
current work — so shares are a floor, not a census.
Service co.
Jobs (12 mo)
Halliburton
1,317
NexTier (Patterson-UTI)
724
Liberty
609
ProFrac
300
FTS International
65
BJ Energy Solutions
41
SLB
35
Not identified
1,891
Implied frac fleets & drillout demand
Transparent math, two assumptions: a frac fleet turns ~5.6 wells per 28 days
(the basin-average throughput calibrated in the July issue: 398 wells ↔ 71 fleet-equivalents), and a
coil/workover unit drills out ~6 wells per month. Fleet-equivalents = settled wells/28d ÷ 5.6;
drillout units = wells/28d ÷ 6. Method note: too many operators batch-date pad filings for per-pad
cadence to be reliable, so a single basin-average throughput is used — simul-frac heavy operators'
true crew counts run lower than shown, and slower programs' higher. Basin total on this basis:
326 wells/28d ≈ 58 fleet-equivalents and ≈ 54 drillout units kept busy — two more
fleets and two more drillout units than last issue's book, all of it the settled-pace revision.
Operator
Wells / 28d (settled)
Implied fleet-equiv.
Implied drillout units
Diamondback
37.3
6.7
6.2
Occidental
26.3
4.7
4.4
Devon
20.3
3.6
3.4
Permian Resources
20.0
3.6
3.3
Pioneer (ExxonMobil)
19.3
3.4
3.2
COG (ConocoPhillips)
18.7
3.3
3.1
Cimarex (Coterra/Devon)
18.7
3.3
3.1
XTO (ExxonMobil)
17.3
3.1
2.9
Apache
14.0
2.5
2.3
Chevron
13.3
2.4
2.2
Mewbourne Oil
10.7
1.9
1.8
Matador
10.3
1.8
1.7
Civitas (SM Energy)
8.3
1.5
1.4
Blackbeard Operating
7.3
1.3
1.2
HighPeak Energy
6.7
1.2
1.1
FireBird Energy II
5.7
1.0
1.0
Estimated completion spend — run-rate per 28 days
Correction issued 2026-09-01
This card originally printed $10.17M per job and
$3.3B per 28 days. Both numbers were wrong. They were too high by about
2.4× — an overstatement of roughly $5.9M per well and
$1.9B per 28 days.
The fault was structural, not a mistyped constant. The old model priced the pumping spread as sand-throughput days: it divided the job's disclosed proppant by an assumed 500,000 lb of sand per day and charged $180,000 a day against the result. On this issue's median settled job (24,853,644 lb of sand) that is 50 pumping days and $8.95M of pumping alone — about 88% of the whole published cost. No Permian well takes fifty days to pump; a modern zipper or simul-frac spread places 3–5 million lb a day, so the real figure is a week or so. Everything downstream of that term inherited the error.
Only the cost is corrected. The settled pace, the job counts, the operator tables and every other figure in this issue are reprinted exactly as they were published — the defect never touched them.
Cost per median settled well
$4.24M
was $10.17M
Per completed lateral foot
$409
was ≈$981/ft
Basin run-rate per 28 days
$1.38B
was $3.3B · on the same 325.7 settled pace
As published
Corrected
Cost per median settled well
$10.17M
$4.24M
Per completed lateral foot
≈$981
$409
Basin run-rate per 28 days
$3.3B
$1.38B
Settled pace, jobs / 28 days
325.7
325.7
Line
Basis
Rate
Median well
Pumping spread & stimulation service
$ / lateral ft
$125
$1,295,250
Wireline, plugs & pumpdown
$ / lateral ft
$50
$518,100
Chemicals & additives
$ / lateral ft
$20
$207,240
Site, rentals, supervision, fuel & other
$ / lateral ft
$30
$310,860
Proppant delivered
$ / lb on the job's sand
$0.016
$397,658
Water, produced / recycled
$ / bbl × 76.4% of the barrels
$0.50
$201,651
Water, fresh
$ / bbl × the remaining 23.6%
$1.10
$137,038
Drillout — coil or workover rig
flat $ / well
$350,000
$350,000
Flowback & early production
flat $ / well
$225,000
$225,000
Tubing, wellhead & surface facilities
flat $ / well
$600,000
$600,000
Total
10,362 ft of completed lateral
$409 / ft
$4,242,797
The basis. Completion cost is now built per lateral foot: four foot-priced lines — pumping spread and stimulation service, wireline/plugs/pumpdown, chemicals and additives, and site, rentals, supervision, fuel and other — at $225 per completed foot combined; two pass-throughs priced on the job's own measured volumes — proppant at $0.016/lb on the disclosed sand, and water split by the disclosed produced/recycled share; and three flat per-well lines — drillout, flowback and early production, and tubing, wellhead and surface facilities. The sand-throughput day term is gone entirely.
Where the lateral comes from, and what is wrong with it. The 10,362 ft is a perforated interval, not a drilled lateral, and it is not this issue's wells. It is the median perf span of the lagged cohort: Texas wells completed 6 to 12 months before this issue (n = 1,489, 79% TX coverage). It has to be, because RRC perforation records land 4 to 8 months after the frac — the direct join on this issue's own settled jobs is 1.6%, and on a 28-day window it is essentially zero. A current-window lateral does not exist. Worse, the few recent joins are biased large — prompt filers are big-job operators — so using them would overstate the median. New Mexico has no perforation source at all: dbf900 is a Texas RRC file, only 7 of 15,652 NM disclosures ever join, and NM is a third of every window. The foot priced here is therefore a Texas perforated foot applied basin-wide. For scale, the median permitted lateral this issue is 11,229 ft, 8% longer — the expected heel/toe standoff between drilled and perforated.
The sanity check that should have caught this. The old number was $10.17M on a ~10,362 ft well. Divide it by the lateral: ≈$981 per foot for the completion alone — more than the all-in drilling-and-completion cost per foot of every public Permian operator, which runs about $675–$1,035/ft (Permian Resources at $675–685/ft; Matador at $835–855/ft; Civitas Delaware at $880/ft). A completion-only number cannot exceed an all-in number. The rebuilt figure lands at $409/ft, implying roughly $709/ft all-in once about $300/ft of drilling is added — inside the operator band rather than above it. Standing rule: check any well cost per lateral foot against operator guidance before it ships.
Pricing the median understates the basin. The lateral distribution is bimodal, not a bell: on the well-covered cohort 38% of wells fall in the 10,000–11,000 ft (two-mile) band and 14% in the 15,000–16,000 ft (three-mile) band — roughly one job in seven is a three-miler. A median-only model prices those wells light. Holding these rates and moving only the lateral: a p25 10,043 ft well costs $4.17M and a p75 13,521 ft well costs $4.95M, against $4.24M at the median. The basin run-rate above is therefore a floor, not a midpoint.
Quantities. The median sand, water and produced-water share are this issue's own settled window (job end 42–126 days back), the same population the old model priced. The retained FracFocus snapshot of this vintage reproduces the originally published cost to the digit, so the correction is a change of method, not of data. The settled pace is the original published 325.7.
The per-operator table has been withdrawn, not corrected. It was generated by the same defective model. Rebuilding it needs per-operator lateral, sand and water for this window, and the retained inputs do not support that at operator granularity. Publishing a corrected basin figure beside an uncorrected operator table would be worse than dropping it.
Estimates, not invoices — a rate card, not an AFE. Rates: spend_rate_card_2026-09-01.xlsx, rates provisional pending sign-off. Quantities: FracFocus (proppant, water, water source) and RRC dbf900 perforation records, via build/spend_inputs.json. Jul 21 is unaffected: it used a per-stage model of its own, back-tested at ≈$424 per completed foot, which is where this rebuild independently lands.
What the wells actually made — IP90 after the frac
Method change, and it is the only thing that moved. The Texas
single-well-lease picker was upgraded this week: among a well's single-well PDQ leases, take the one with the
largest windowed oil volume, rather than dropping any well that touched more than one lease record. It is a
strict superset — all 3,312 previously published Texas wells reproduce with identical oil and gas
volumes, and 45 more are rescued from the 274 wells that carry multiple lease records.
Old picker → new: wells 6,155 → 6,200, Texas 3,312 → 3,357,
overall median 693 → 692 bopd, Texas median 640 → 638,
New Mexico 762 → 762 (unchanged), median gas 1,247 → 1,250 mcfd.
All of that movement is method, none of it is data: this week's FracFocus refresh added zero new cohort
wells and the RRC PDQ file is unchanged at its Jul 26 vintage.
New Mexico is stale. The OCD C-115 route
(WellService.asmx/GetProduction) is still behind a Cloudflare human-verification gate —
re-confirmed this morning — so New Mexico volumes are carried at their Aug 5 vintage, now 20 days old.
The NM cohort and every NM well reproduce identically, so these are the same data by the same method rather
than a silent reuse; but they are stale, and they will stay stale until the gate opens.
Wells frac'd July 2024 – Feb 2026, 6,200 with a clean 90-day production window
(2,843 New Mexico + 3,357 Texas). New Mexico: true well-level oil volumes from OCD C-115 filings, all
3,175 cohort wells queried. Texas: oil + condensate from RRC lease-level filings, restricted to
single-well leases — leases carrying exactly one wellbore on the proration schedule, so lease
volumes are well volumes with no pad allocation; that keeps 3,357 of 6,701 TX cohort wells
(50%; the rest sit on multi-well leases). Wells with production predating the frac (refracs, legacy leases) excluded.
IP90 = oil over the first three reported production months ÷ 90 days. Median across all 6,200
wells: 692 bopd (NM 762, TX 638); median gas 1,250 mcfd.
Formation
Wells
Median IP90 (bopd/well)
bopd per 1,000 ft
Wolfcamp
2390
690
65
Bone Spring
2053
768
63
Spraberry
1209
639
52
Dean
175
726
55
Clear Fork
137
561
50
Barnett
73
602
62
Delaware Mtn
35
576
—
Yeso
35
225
—
San Andres
25
170
21
Penn
17
298
—
Strawn
12
536
51
Queen
11
438
42
Other / unreported
28
374
26
Operator
Wells
Median IP90 (bopd/well)
ExxonMobil (Pioneer/XTO)
1191
700
Devon (incl. Coterra)
622
895
EOG Resources
542
857
Mewbourne Oil
509
625
Occidental
413
997
Permian Resources
364
672
Diamondback
339
745
Chevron
301
611
ConocoPhillips (COG)
258
759
Matador Production
236
622
Per-1,000-ft columns are Texas-weighted: laterals come
from the RRC perf join (3,255 TX wells) and from OCD completion reports for only 62 NM wells, so a dash
means the lateral sample was under 10. Operator rows here use ownership roll-ups (unlike the rest of the issue)
because the production files are keyed to current operatorship.
Who's ramping, who's easing off
Three signals per operator: settled pace (wells/28d, jobs ended 42–126 days back)
against its own prior three-month window (126–210 days back); TX permits issued in the
trailing 8 weeks (Jun 13 – Aug 7) against the prior 8 weeks (intent — leads the frac 6–12 months; arrows
at ±20%); and jobs filed in the last 28 days as a share of settled pace (a filing-freshness read,
not a slowdown detector — slow filers run low here every issue). The universe is every operator on the
settled-pace list above, i.e. 5.5 wells/28d or better. The permit columns are unchanged from
last issue — the RRC permit file is monthly and still ends Aug 7 — except where this issue's
normalised operator names reassign a filer string, which is why Devon now shows no Texas permits in either
window. Read movement in the first column only. Hover a row for the figures.
Operator
Settled pace /28d
TX permits
Filed last 28d
Reads as
Diamondback
· 37.3vs 43.3 prior 3 mo
▼ 288 wk to Aug 7 · vs 79 prior 8 wk
26 (70%)
holding pace, and filings are current
Occidental
▼ 26.3vs 41.0 prior 3 mo
▼ 428 wk to Aug 7 · vs 102 prior 8 wk
0 (0%)
off on paper, and filing slowly — likely lag as much as a real slowdown
Devon
· 20.3vs 19.0 prior 3 mo
—no TX permits in either window
15 (74%)
holding pace, and filings are current
Permian Resources
· 20.0vs 22.7 prior 3 mo
▼ 168 wk to Aug 7 · vs 44 prior 8 wk
21 (105%)
holding pace, and filings are current
Pioneer (ExxonMobil)
▼ 19.3vs 36.3 prior 3 mo
· 1088 wk to Aug 7 · vs 112 prior 8 wk
3 (16%)
off on paper, and filing slowly — likely lag as much as a real slowdown
COG (ConocoPhillips)
· 18.7vs 19.7 prior 3 mo
▲ 518 wk to Aug 7 · vs 29 prior 8 wk
12 (64%)
holding pace, and filings are current
Cimarex (Coterra/Devon)
· 18.7vs 15.7 prior 3 mo
▼ 08 wk to Aug 7 · vs 22 prior 8 wk
0 (0%)
holding pace; a slow filer, so recent weeks understate it
XTO (ExxonMobil)
▼ 17.3vs 26.3 prior 3 mo
—no TX permits in either window
5 (29%)
off on paper, and filing slowly — likely lag as much as a real slowdown
Apache
· 14.0vs 15.0 prior 3 mo
▼ 188 wk to Aug 7 · vs 33 prior 8 wk
7 (50%)
holding pace; a slow filer, so recent weeks understate it
Chevron
· 13.3vs 11.7 prior 3 mo
▲ 188 wk to Aug 7 · vs 4 prior 8 wk
0 (0%)
holding pace; a slow filer, so recent weeks understate it
Mewbourne Oil
▼ 10.7vs 23.0 prior 3 mo
▲ 188 wk to Aug 7 · vs 7 prior 8 wk
6 (56%)
genuinely easing — filings are current, so the drop is real
Matador
· 10.3vs 11.0 prior 3 mo
—no TX permits in either window
7 (68%)
holding pace, and filings are current
Civitas (SM Energy)
▼ 8.3vs 13.0 prior 3 mo
▼ 58 wk to Aug 7 · vs 9 prior 8 wk
6 (72%)
genuinely easing — filings are current, so the drop is real
Blackbeard Operating
▲ 7.3vs 4.7 prior 3 mo
▼ 118 wk to Aug 7 · vs 36 prior 8 wk
0 (0%)
pace up on settled filings; permit intake not following yet
HighPeak Energy
▲ 6.7vs 2.7 prior 3 mo
▼ 68 wk to Aug 7 · vs 8 prior 8 wk
0 (0%)
pace up on settled filings; permit intake not following yet
FireBird Energy II
· 5.7vs 6.3 prior 3 mo
▼ 68 wk to Aug 7 · vs 15 prior 8 wk
4 (70%)
holding pace, and filings are current
How current is each operator's paperwork?
Every operator with 8+ Permian disclosures in the trailing 18 months, sorted
worst-first by how old its newest job-end date is. FracFocus has no enforced filing deadline, so this
is a paperwork-currency table, not an activity table — a dark filer can be busy and a current filer can be
idle. Late batches arrive constantly and revise settled pace upward afterward, which is why the lead
recomputes last issue's window every week.
Red = newest job over 120 days old (dark);
amber = 42–120 days (slow);
green = inside 42 days (current).
Split this issue: 19 dark / 23 slow / 25 current, against
last issue's 15 / 23 / 25. Only three of the extra dark names are genuine ageing — Manti Tarka, Bayswater and
Petroplex each drifted past 120 days without filing. The rest is bookkeeping and worth saying plainly: this
cycle's operator normalisation lists Hibernia Resources IV, SM Energy, Dallas Production and Marathon Oil under their own
names rather than folded into a parent, U.S. Energy Development fell out of the universe on the 8-disclosure
test, and Triple Crown cleared its backlog from 211 days to 63.
Operator
Newest job on file
Filed last 28d
Settled pace /28d
Disclosures, 18 mo
OxyRock
2025-08-28 (362d)
0
0.0
96
Rockport Energy Solutions
2025-10-10 (319d)
0
0.0
9
FourPoint Energy
2025-11-19 (279d)
0
0.0
17
Iron Orchard
2025-12-09 (259d)
0
0.0
8
EOG Resources
2025-12-24 (244d)
0
0.0
318
UpCurve Energy
2025-12-26 (242d)
0
0.0
17
Vital Energy
2026-01-16 (221d)
0
0.0
22
Ike
2026-01-16 (221d)
0
0.0
23
Unitex Oil
2026-02-05 (201d)
0
0.0
8
Hannathon Petroleum II
2026-02-16 (190d)
0
0.0
18
Paloma Permian
2026-02-25 (181d)
0
0.0
22
Hibernia Resources IV
2026-03-02 (176d)
0
0.0
26
Petro Hunt
2026-03-25 (153d)
0
0.0
56
Marathon Oil
2026-04-04 (143d)
0
0.0
11
Dallas Production
2026-04-08 (139d)
0
0.0
9
SM Energy
2026-04-12 (135d)
0
0.0
61
Manti Tarka Permian
2026-04-22 (125d)
0
0.3
14
Bayswater E&P
2026-04-24 (123d)
0
0.7
30
Petroplex Energy
2026-04-26 (121d)
0
1.0
20
Black Swan Oil & Gas
2026-04-27 (120d)
0
1.0
27
Continental Resources
2026-04-30 (117d)
0
1.0
86
Kaiser-Francis Oil
2026-05-01 (116d)
0
1.3
15
Double Eagle (DE Central)
2026-05-07 (110d)
0
2.0
116
Ovintiv
2026-05-08 (109d)
0
2.7
93
Discovery Natural Resources
2026-05-09 (108d)
0
1.7
35
PBEX Operations
2026-05-12 (105d)
0
1.0
17
Summit Petroleum
2026-05-25 (92d)
0
1.7
58
Tap Rock
2026-05-30 (87d)
0
0.7
24
BPX
2026-05-30 (87d)
0
3.0
95
Sabalo II Operating
2026-06-15 (71d)
0
2.3
23
3R Operating
2026-06-21 (65d)
0
2.3
24
Crescent Energy
2026-06-22 (64d)
0
2.0
13
Triple Crown Resources
2026-06-23 (63d)
0
3.3
63
Jetta
2026-06-25 (61d)
0
2.3
12
Occidental
2026-06-26 (60d)
0
26.3
589
Permian Deep Rock
2026-06-27 (59d)
0
1.7
26
HighPeak Energy
2026-07-03 (53d)
0
6.7
71
TRP Operating
2026-07-09 (47d)
0
5.0
28
RP Operating
2026-07-10 (46d)
0
1.3
10
Cimarex (Coterra/Devon)
2026-07-11 (45d)
0
18.7
312
Chevron
2026-07-13 (43d)
0
13.3
309
Blue Arrow
2026-07-13 (43d)
0
3.0
28
Avant Operating II, LLC
2026-07-17 (39d)
0
3.0
17
Strata Production
2026-07-18 (38d)
0
2.7
24
Greenlake Energy
2026-07-19 (37d)
0
0.0
30
Blackbeard Operating
2026-07-23 (33d)
0
7.3
155
Spur Energy Partners
2026-07-23 (33d)
0
4.0
53
Mack Energy
2026-07-24 (32d)
0
1.0
8
Burnett Oil
2026-07-25 (31d)
0
0.0
13
VTX Energy
2026-07-27 (29d)
0
4.0
39
Fasken Oil and Ranch
2026-07-29 (27d)
2
4.7
81
XTO (ExxonMobil)
2026-07-30 (26d)
5
17.3
457
Apache
2026-07-31 (25d)
7
14.0
236
Civitas (SM Energy)
2026-07-31 (25d)
6
8.3
161
FireBird Energy II
2026-08-02 (23d)
4
5.7
97
Mewbourne Oil
2026-08-05 (20d)
6
10.7
403
Sem
2026-08-07 (18d)
2
0.0
21
Pioneer (ExxonMobil)
2026-08-09 (16d)
3
19.3
739
Ring Energy
2026-08-11 (14d)
3
1.7
22
Surge Energy
2026-08-11 (14d)
9
0.7
84
Diamondback
2026-08-12 (13d)
26
37.3
744
BTA Oil Producers
2026-08-12 (13d)
2
2.3
57
Devon
2026-08-13 (12d)
15
20.3
340
Matador
2026-08-13 (12d)
7
10.3
209
Basin Oil and Gas
2026-08-17 (8d)
3
1.3
56
COG (ConocoPhillips)
2026-08-18 (7d)
12
18.7
405
Permian Resources
2026-08-18 (7d)
21
20.0
393
The EOG problem, again — with a twist. EOG's newest
Permian disclosure is still 2025-12-24 — 244 days dark, another week older with nothing filed in
between, and only Rockport (319d), FourPoint (279d), Iron Orchard (259d) and OxyRock (362d) sit worse.
Meanwhile New Mexico's regulator shows EOG carrying 805 wells spudded 2024–26 and still awaiting
completion — up six this week and still the largest DUC backlog in the basin by 266 wells. The twist is
the other column: EOG's unspudded permit bank fell by three to 1,009, its first non-build week in
months, while Devon added 29. Paperwork dark is still not the same as inactive — every settled-pace and
spend figure in this issue understates EOG by roughly its entire program — but the permit-stack story has
moved to Devon.
Biggest jobs of the period
Jobs ended in the last 90 days (753 of them), ranked by total base water volume — a wider window than
the 28 days this table used until two issues ago, because at this filing vintage a 28-day window holds too few
settled monsters to rank honestly. Pad siblings dominate the top of any such list: a four- or
six-well pad filed on one end date will fill several rows with near-identical numbers, which is a batch
completion, not six record jobs. The BUTTERS 5-series in Midland County still owns both ends of the
book — Pioneer's 5E–5H at 77.9–83.7M lb and XTO's 5A–5D at ~74.6M lb each — and both operators are
ExxonMobil. Behind them, the biggest non-Butters water jobs are RP Operating's two "Cheddar" wells in
Reagan County at ~1.19–1.20M bbl, and the biggest non-Butters sand jobs are the Beverly 4726 B and C in
Upton at 47.8 and 47.2M lb, filed by FireBird Energy II — a Diamondback subsidiary, shown as filed under
this issue's no-roll-ups convention.
Operator
Well
County
Water (bbl)
Proppant (lbs)
Job end
XTO (ExxonMobil)
BUTTERS 5A 201H
Midland, TX
1,497,000
74,539,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5C 203H
Midland, TX
1,482,000
74,648,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5D 204H
Midland, TX
1,470,000
74,609,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5B 202H
Midland, TX
1,467,000
74,658,000
Jul 2
Pioneer (ExxonMobil)
BUTTERS 5E 205H
Midland, TX
1,408,000
83,714,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5H 208H
Midland, TX
1,400,000
81,452,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5G 207H
Midland, TX
1,399,000
81,906,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5F 206H
Midland, TX
1,311,000
77,926,000
Jun 10
RP Operating
Cheddar C 202-176 3H
Reagan, TX
1,202,000
37,515,000
Jun 14
RP Operating
Cheddar A 202-176 1H
Reagan, TX
1,186,000
37,169,000
Jun 14
FireBird Energy II
Beverly 4726 C 501H
Upton, TX
1,152,000
47,228,000
Aug 1
Pioneer (ExxonMobil)
MARSH 36F 106H
Midland, TX
1,148,000
—
Jul 19
Where the permits are — the county map book
Every Texas horizontal drilling permit issued in the trailing 365 days that carries a
surface location — 3,891 permits across 25 counties, one page each, biggest county first. Each permit is
drawn as a line from its surface location toward the permitted bottomhole, so the map shows lateral
direction and length, not just a dot; 99.7% resolve to a line (11 fall back to a gray dot where the RRC
GIS has no wellbore geometry yet). Median drawn lateral this issue: 11,229 ft
(5th percentile 2,004 ft, 95th 20,569 ft, longest 23,737 ft). Lines are coloured by
the county's top-eight permit holders, everyone else gray, and the legends now use the same normalised
operator names as the rest of the issue. Tan lines underneath are Interstate, US and
state highways from TxDOT — locational context only, no county boundaries are drawn; 22 of the
25 pages carry highway geometry and 87 route shields are labelled. Kent, Terry and Sterling
genuinely have no IH/US/SH mainlane inside their frames. Permits lead the frac
by six to twelve months, so this is a map of where crews will be, not where they are.
Culberson is the story this week: it held 50 of last issue's 64 dot-fallbacks and now has
zero — the RRC GIS caught up and all 115 Culberson permits draw as lines. Basin-wide the
fallbacks fall from 64 to 11 and line coverage from 98.4% to 99.7%. Crockett is a correction: it
was carried last issue as having no highways, which was wrong — a server recount found three features and
the page now draws them. Crane, Winkler, Ward and Dawson highway geometry was refetched from TxDOT this
morning; Winkler gains I-20 and Ward gains US 285.