Frac jobs disclosed to FracFocus · activity through August 31, 2026 · published September 1, 2026
Read the last columns with a grain of salt. The week ending August 31 shows
1 job on file and the week before it 29, against a settled pace nearer
81 a week — that is filing lag, not a shutdown. Operators have up to about 30 days to
disclose a job to FracFocus, so the newest weeks are only ever a fraction of themselves on
publication day and grow for a month afterward. The faded columns are still arriving; judge the
trend from the solid ones. On the jobs that are settled, the basin is running at about
322 frac jobs per 28 days.
This week the caveat gets its sharpest demonstration yet. Last issue we printed
134 jobs in the 28 days to August 24, 34 of them in New Mexico.
Recompute that exact window on this morning's filings and it is 177 jobs, 55 of them in New Mexico — a
+43-job late-filing revision to a number that was only four weeks old. The settled window moves
the same way, if more gently: last issue's 325.7 per 28 days recomputes to
331.3 (+5.6). So read this week's 112-job tile as a floor, not a count, and
read the 322.3 settled pace as the number that will itself be revised up next month.
Frac jobs, last 28 days
112
Aug 4 – Aug 31, 2026 · filings still arriving
New Mexico / Texas split
45 / 67
40% of jobs in NM — above last issue's window recomputed at 31% (it printed 25% on the day)
Settled pace
≈322 jobs/28d
jobs ended 42–126 days back ÷ 3 — the fully-reported baseline
Median water per job
518,000 bbl
median, n = 112 jobs reporting (the mean is 577,000)
Median proppant per job
24,000,000 lbs
median, n = 76 jobs reporting (the mean is the same to the nearest 100k)
Produced / recycled water
71%
of jobs reporting a source (50 of 70) · 70 of 112 jobs report source · record-level 64.6% (53 of 82 rows) · volume-weighted 71%
EOG has broken its filing blackout
FracFocus disclosures with a 2026 job end filed by EOG Resources since last issue, read against the New Mexico regulator's permit and DUC counts (OCD, queried Sep 1).
For weeks this newsletter has run the same callout: EOG's paperwork was dark — 244 days dark at last issue, newest job end 2025-12-24 — while New Mexico showed it sitting on the largest DUC backlog in the basin. That callout is now inverted. On this week's bulk file EOG has filed 15 disclosures with 2026 job ends — five in July, ten in August — and its newest job end is 2026-08-24, 8 days back. It goes dark → current in one step, and it is the sixth most active filer of the last 28 days at 10 jobs.
It does not appear in the operator table below, and that is not an error. Settled pace counts jobs that ended 42–126 days back; only five of EOG's new filings fall in that window, so its settled pace reads 1.7/28 d. Expect it to jump next issue as the July and August jobs age into the window. Every pace, fleet and county figure in this issue still understates EOG.
The New Mexico pipeline says the same thing from the other side. EOG's unspudded permit bank fell 10 to 999 — a second consecutive fall and its first print under 1,000 — while its New Mexico DUC stack rose 10 to 815. It is drawing down permits, converting them to drilled wells, and now filing the completions. Devon is the mirror image: unspudded up 24 to 1,326 on its own filer name with DUCs flat at 408. EOG is drilling and converting; Devon is permitting.
Two other things worth saying out loud this week. XTO is the biggest mover in the settled table — 24.7/28 d against the 17.3 we published, +7.4, taking third place — while Occidental, Cimarex, Chevron and Apache each filed zero disclosures in the last 28 days, which is lag, not idleness. And in the county book Midland falls out of the top six entirely, at two jobs against sixteen last issue, as the work concentrates on Lea and Eddy.
Special: a decade of sand per foot — the basin found its number
Midland Basin, nine core counties · FracFocus proppant mass joined to RRC W-2
perforated intervals · 20,437 joined wells surviving the sanity filters, 2016 – Aug 2026 ·
median lb of sand per perforated foot by frac year · *2026 is preliminary (n = 287).
The RRC wellbore file WAS refreshed this cycle — to the Aug 29 vintage — and the series still barely moved.
That is the finding. Only 2025 changed at all (2,037 → 2,038 lb/ft), 2026 held at
2,007 on a materially larger sample (n 256 → 287), and the joined-well count went
20,393 → 20,437. A fresh file, 44 more joined wells, 31 more 2026 wells — and the same answer.
1,474
2016
1,795
2017
1,855
2018
1,852
2019
1,898
2020
1,998
2021
2,002
2022
2,021
2023
2,029
2024
2,038
2025
2,007
2026*
Everyone remembers the loading race. From 2016 to 2018 the median Midland Basin well went from
1,474 to 1,855 lb per perforated foot — a 26% jump in two years, the era when every investor
deck had a "bigger fracs" slide. Then the race just… stopped. Since 2018 the median has crept from
1,855 to 2,038 lb/ft — about 10% in seven years, and the preliminary 2026 column sits at
2,007 lb/ft, statistically indistinguishable from 2025. Call it
~2,000 lb/ft: the design equilibrium the basin settled on once the cost-per-barrel math
stopped rewarding more sand.
Last issue this card said "nothing moved, and the wellbore file was stale — watch the next
dbf900 drop." The drop landed on Aug 29, and it is worth reporting that it changed nothing. Two joins have to move
for this chart to move — a perforated interval from the RRC and a proppant mass from FracFocus — and the fresh
file added 31 wells to the 2026 sample without shifting its median by a pound. That is a real result, not a
skipped refresh: the equilibrium held against a 12% larger sample.
The sand bill still doubled — but sideways. Median perforated interval went
from 7,642 ft (2016) to 10,522 ft (2025), and median sand per well from 11.8M to
24.7M lb. The growth was laterals, not loading. The 2026 wells joined so far run a median
10,433 ft at the same loading, which is the whole thesis in one line.
Design still isn't monolithic: among 2025–26 completions, Pioneer's
median well takes 30.7M lb (n = 743) against Diamondback's 20.8M (n = 807) — same basin, same benches,
a 10-million-pound difference in what shows up on the pad. Both reproduce last issue's figures exactly; that
line is computed sand-only, with no perf join.
Method: proppant = disclosed mass of
crystalline silica (CAS 14808-60-7) summed per disclosure; perforated interval = RRC W-2/G-1 perf
span joined by API (2,000–20,000 ft sanity); medians throughout; filings over 100M lb excluded as data errors; a perf span
from a recompletion can differ from the original lateral — a small minority of joins. The joined-well
count is taken after the sand and lateral filters. 2026 reflects wells both frac'd and filed with the
RRC — it will keep drifting as the year fills in.
Weekly frac job count — trailing 13 weeks
By job end date. Faded columns are recent weeks still filling in — operators have up to ~30 days
to file, so the newest weeks always start low and grow. The week ending Aug 31 has 1 job on file;
that is normal at publication, not a stoppage — last issue's newest week printed 5 and has since grown to 29.
Fade rule, stated plainly: a column is faded when any day inside it is less than 42 days back, i.e. when it is not
yet fully inside the settled window. That fades 5 of the 13 columns this issue; the last two issues faded only
the newest three, which understated how much of the right-hand side is still arriving.
34
6/8
113
6/15
82
6/22
90
6/29
54
7/6
93
7/13
57
7/20
66
7/27
66
8/3
39
8/10
43
8/17
29
8/24
1
8/31
TexasNew Mexicostill filing
Permian rig count — 267 flat wk/wk
Active drilling rigs in the Permian, weekly · latest 2026-08-28 · the basin peaked at
318 rigs in Apr 2024 and has now held 267 for a second week — the first flat print since the run-up
that began from the 2026-06-18 reading of 256 (the flat pair before this one was 6/12–6/18, also at 256), still
up 29 from the February low of 238 and the highest print since late June 2025, when the count was on its way
down through 270 · Source: Baker Hughes
Drilling vs completions pace — trailing 30 weeks
Rigs drill the wells; frac crews complete them. Orange is Permian rigs; blue is frac jobs
ended each week from FracFocus — the blue line's newest weeks are unfiled, not idle (judge it from the
middle of the series). Rigs repeated last week's 267 — the first flat print since 6/12–6/18 — while the settled
completion pace eased slightly; the gap between the two lines is the DUC build showing up in real time, and
New Mexico's regulator now counts 4,513 drilled-and-waiting wells. The national frac-spread series
remains unsourced this issue. · Sources: Baker Hughes; FracFocus
Permian rigsFrac jobs/week (FracFocus)
Most active operators
Bar & big number = settled pace (wells/28d from jobs ended 42–126 days back);
gray number = jobs filed in the last 28 days. Diamondback holds the top slot at 36.7, and the week's
real move is one place below: XTO jumps 17.3 → 24.7, +7.4, past Devon and Permian
Resources into third. Occidental, Cimarex, Chevron and Apache each filed zero disclosures in the last 28
days, which is filing lag rather than idleness — three of them still hold their settled places. Method note:
operators are shown as filed on the disclosure — no ownership roll-ups — so Pioneer and XTO (both
ExxonMobil), and Cimarex (Coterra, now Devon) appear separately. Operators marked · / ·· file
moderately / slowly, so recent filings alone understate them. EOG is still absent — it has ended its
filing blackout, but only five of its new disclosures fall in the settled window, so it reads 1.7/28d and
does not qualify. See the lead story.
Diamondback
36.7
18
Occidental
26.3
0
XTO (ExxonMobil)
24.7
11
Devon
20.0
13
Permian Resources
19.7
12
Pioneer (ExxonMobil)
18.7
2
COG (ConocoPhillips)
17.0
13
Cimarex (Coterra/Devon) ·
15.0
0
Chevron ·
13.0
0
Apache
13.0
0
Mewbourne Oil
11.3
4
Matador
10.3
7
Blackbeard Operating
8.0
0
Civitas (SM Energy)
7.7
0
Avant Operating II ·
5.7
0
Activity by county
Jobs ended in last 28 days (sums to 112). Lea runs away with it at 29,
up from 18, and Eddy is second at 15 — New Mexico now takes 40% of the basin's filed jobs against
31% when last issue's own 28-day window is recomputed on this morning's filings
(55 New Mexico jobs of 177). Last issue printed 25% on the day; that gap is filing lag, not a
swing in activity, so 31% is the comparator to use.
The other side of that is Midland, which falls out of the top six entirely at 2 jobs
against 16 last issue. Read the Texas fall as filing lag as much as activity: the Midland-basin filers are the
slower ones this cycle.
Lea, NM
29
Eddy, NM
15
Howard, TX
13
Upton, TX
13
Glasscock, TX
11
Martin, TX
8
Andrews, TX
4
Reeves, TX
4
Irion, TX
3
Loving, TX
3
Winkler, TX
3
Crane, TX
2
Midland, TX
2
Chaves, NM
1
Ector, TX
1
Completion pipeline — New Mexico (work coming to a pad near you)
From NM OCD well records (queried Sep 1), horizontal wells in Lea / Eddy / Chaves / Roosevelt:
8,538 approved permits not yet spudded (the drilling backlog — includes stale, unexercised permits of
all vintages) and 4,513 wells spudded 2024–2026 still carried as "New" — drilled or drilling with no
completion on record, the OCD's closest thing to a DUC list. Both grew again this week (+72 and +44), and the
DUC build is almost entirely 2026 spuds (937, +37 — the 2024 and 2025 cohorts moved by 2 and 5).
The callout that flipped last issue is now a trend. EOG's unspudded stack has fallen a second straight week,
1,012 → 1,009 → 999 — its first print under 1,000 — while its DUC stack rose again to
815 (+10): EOG is converting permits into drilled wells, and as of this week it is filing the
completions too (see the lead story). Devon is doing the opposite — unspudded up 24 to
1,326 on its own filer name, 1,434 once WPX Energy Permian rolls in as the table below does, with DUCs
flat at 408. Devon is permitting; EOG is drilling. Every well in that second column needs a frac crew and a
drillout. Operators are grouped into display families as in previous issues — Devon includes WPX Energy Permian,
Permian Resources includes Earthstone and Admiral, XTO includes both XTO entities, Occidental the three Oxy
entities, and COG includes ConocoPhillips Company; Marathon Oil Permian is shown on its own line. Otherwise as
filed with the OCD; parentheses note current owners.
Operator
Permits (unspudded)
Spudded '24–'26, awaiting completion
Top county
Devon
1,434
443
Lea
EOG Resources
999
815
Lea
Permian Resources
735
471
Eddy
Mewbourne Oil
594
559
Eddy
Matador
673
343
Lea
Coterra (Cimarex)
684
259
Lea
XTO (ExxonMobil)
312
596
Eddy
Occidental
489
225
Eddy
COG (ConocoPhillips)
550
29
Lea
Chevron
270
272
Eddy
Marathon Oil (ConocoPhillips)
240
25
Eddy
Spur Energy Partners
139
115
Eddy
Riley Permian
197
19
Eddy
Civitas (SM Energy)
131
43
Lea
Completion pipeline — Texas permit backlog
The Texas permit numbers in this issue are frozen, and this is the fourth issue in a row
that they are. daf804 is a monthly file; the RRC's file list was re-checked live this morning and still
shows exactly one file, last modified 8 Aug 2026, permits issued through Aug 7. So this chart, both
permit tables below, and the permit columns of the momentum table are all identical to the Aug 24, Aug 17 and
Aug 10 issues by construction — not because permitting stopped. It also has a second-order effect worth
naming: the county map book runs on a trailing-365-day window, and because that window advances weekly against
a static file, the map point count has fallen 3,961 → 3,891 → 3,831 over three issues purely as old permits
age out with none arriving. The September cut is due around Sep 9–10; if it slips again these sections
should be suspended rather than repeated a fifth time. 4,782 permits issued Aug 2025 – Aug 7, 2026
in the Permian counties, 85.7% horizontal. July is a complete month at 396 permits;
August is partial — the file runs only through Aug 7, so the last column is a stub, not a cliff.
Permits lead the frac by six to twelve months.
308
8/25
371
9/25
475
10/25
236
11/25
305
12/25
491
1/26
327
2/26
422
3/26
473
4/26
468
5/26
408
6/26
396
7/26
102
8/26
Permit holders — trailing 12 months
Permits issued Aug 2025 – Aug 7, 2026 by operator, resolved from the P-5 number by API join
to FracFocus filings (93.5% coverage, 4,473 of 4,782; the remaining 309 are small P-5 numbers with no FracFocus
history and are shown as "Unknown"). Anadarko-numbered permits are counted under Occidental. Same Aug 8 file as
the last three issues, so every count below is unchanged — the operator-name vote was re-run against this
week's fresher FracFocus and moved nine P-5 numbers, only one of which carries any in-window permit at all
(two permits, Canan Mowrey → Three Summits). All forty rows of the underlying table reproduce last issue exactly.
Operator
Permits
Pioneer (ExxonMobil)
588
Occidental
508
Diamondback
480
Unknown
309
COG (ConocoPhillips)
198
Permian Resources
164
Ovintiv
157
Apache
148
Continental Resources
127
Double Eagle (DE Central)
127
Blackbeard Operating
124
Kinder Morgan
100
Permit counties — trailing 12 months
Same window and the same Aug 8 file, so these are last issue's counts to the
permit — and the issue before that, and the one before that. Midland still leads, but the Delaware side
(Loving, Reeves) carries as many permits between two counties as the Midland Basin core does.
County
Permits
Midland
626
Loving
485
Upton
482
Reeves
459
Martin
441
Glasscock
267
Reagan
253
Andrews
229
Crane
177
Ector
177
Gaines
175
Howard
151
Smaller operators to watch
Everyone outside the top-10 settled list with 3+ completions since March 22 —
the private and mid-cap programs that buy sand, water, and services every month without making headlines.
The window is the anchor date minus 163 days, which is the same offset the last three issues used.
Large independents (Mewbourne, Civitas, Matador, Ovintiv, Continental) are excluded regardless of count, and
EOG joins that exclusion list this issue — now that its blackout has ended it would otherwise walk into
this table as a "smaller operator", which it plainly is not.
Green dates = a job ended inside the last ~30 days,
i.e. a crew was just there. Service co. from supplier records where identifiable.
Operator
Jobs (5 mo)
Top counties
Service co. (ID'd)
Median water (bbl)
Newest job
Blackbeard Operating
30
Crane TX
—
121,000
2026-07-23
FireBird Energy II
30
Upton TX, Ector TX
—
505,000
2026-08-24
Fasken Oil and Ranch
22
Andrews TX, Midland TX
—
508,000
2026-08-12
Surge Energy
22
Howard TX, Borden TX
NexTier (Patterson-UTI)
417,000
2026-08-11
BPX
21
Reeves TX, Loving TX
Halliburton, NexTier (Patterson-UTI)
496,000
2026-05-30
VTX Energy
21
Reeves TX
NexTier (Patterson-UTI)
597,000
2026-07-27
HighPeak Energy
20
Howard TX, Borden TX
Liberty, ProFrac
480,000
2026-07-03
Spur Energy Partners
19
Eddy NM
Halliburton
282,000
2026-07-23
BTA Oil Producers
18
Crane TX, Lea NM
FTS International
678,000
2026-08-12
Double Eagle (DE Central)
18
Reagan TX, Glasscock TX
Halliburton, NexTier (Patterson-UTI)
578,000
2026-05-07
Avant Operating II
17
Lea NM
Liberty
341,000
2026-07-17
Blue Arrow
15
Reeves TX, Pecos TX
—
631,000
2026-07-13
Triple Crown Resources
15
Irion TX
—
529,000
2026-06-23
TRP Operating
15
Loving TX
—
542,000
2026-07-09
Basin Oil and Gas
13
Winkler TX, Ector TX
—
4,000
2026-08-17
Summit Petroleum
12
Upton TX
FTS International
786,000
2026-05-25
Read the Basin Oil and Gas row with suspicion.
Its median disclosed water is 4,105 bbl across 13 jobs; every other row in this table runs between
about 121,000 and 786,000 bbl, and the two rows immediately either side of it are 542,000 and 786,000. That is two
orders of magnitude below anything that could be a modern Permian frac, and on the order
of a fraction of a barrel per lateral foot. These disclosures are almost certainly not describing full stimulation
jobs (a recompletion, a partial filing, or a units error are all likelier than a 4,000-bbl frac). The row is left in
rather than quietly dropped, but it should not be read as a completions programme. The same operator supplies the
top three green rows of the fleets-on-location table below, which carries the same caveat.
Completion intensity by operator
Median job design over each operator's trailing 12 months · operators with
≥8 jobs and a disclosure inside the last 6 months, sorted by median sand · sand in millions of lbs, water in thousands of bbl ·
the lateral and lb/ft columns stay blank again this issue, and this time it is not because the wellbore file
was stale. The RRC dbf900 was refreshed to the Aug 29 vintage and the join was re-checked against it. It is
still too thin and too biased to print: median perforated-interval coverage across the 18 rows below is
37% (45% job-weighted), 3 rows sit under 25%, and among the basin's biggest programmes
XTO joins on 1.3% of its jobs (4 of 309) and Devon on 0.0%. The wells that do join are the ones whose
operators file promptly, and they skew high: the values that would have printed run 2,070–2,986 lb/ft. That range is
not like-for-like with the 2,007 lb/ft in the sand-per-foot special above — 2,007 is the 2026-to-date,
preliminary, nine-county Midland-Basin median from that card, while these are trailing-12-month, basin-wide,
per-operator medians. Printing them would say more about paperwork than about design. They are retained in the
build data if anyone wants to argue the point. The basin-wide perf join is shown properly in the sand-per-foot
special above, where the history is deep enough to be honest.
One calibration warning about the top of this table. The rows are sorted by median sand, so the least
calibrated rows come first: Petroplex Energy leads on 20 jobs, and without the suppressed per-foot column there is
nothing on the page to say whether a big median sand number is a big frac or simply a long lateral — or, at the
top of the table, a small sample. Treat the first few rows as small-n and uncalibrated until the lb/ft column
can be printed.
Operator
Jobs
Median sand (M lbs)
Median water (k bbl)
Median lateral (ft)
Sand (lbs/ft)
Petroplex Energy
20
38.9
744
—
—
SM Energy
16
36.0
871
—
—
Hibernia Resources IV
16
34.0
667
—
—
RP Operating
10
33.7
1042
—
—
Discovery Natural Resources
20
32.1
1144
—
—
PBEX Operations
14
31.3
696
—
—
Continental Resources
41
30.7
764
—
—
Pioneer (ExxonMobil)
428
29.8
639
—
—
HighPeak Energy
43
29.8
502
—
—
BTA Oil Producers
40
29.1
616
—
—
Sabalo II Operating
15
28.9
539
—
—
Summit Petroleum
31
28.7
547
—
—
Tap Rock
19
27.3
604
—
—
XTO (ExxonMobil)
309
27.2
531
—
—
Blue Arrow
24
27.1
631
—
—
Double Eagle (DE Central)
67
26.2
587
—
—
Occidental
406
25.3
467
—
—
VTX Energy
28
25.3
628
—
—
Water & sand by well depth (TVD)
Trailing 12 months, both states, by disclosed true vertical depth. The shallow band is a
different business — a third of the sand and just over half the water of every deeper band. Below that line the
design is remarkably flat: from 7,000 ft to past 12,000 ft the median job barely moves, which is the
lateral-length story again rather than a depth story. Every band is within a few jobs of last issue as the
12-month window rolls; the New Mexico share of the deep bands keeps creeping up, and that is the same
Lea/Eddy concentration the county table shows.
TVD band
Jobs
Median water (bbl)
Median proppant (lbs)
of which NM
under 7,000 ft
362
286,000
8,057,000
82
7,000 - 9,000
1,626
516,000
23,619,000
336
9,000 - 10,500
1,656
531,000
25,215,000
564
10,500 - 12,000
866
512,000
24,570,000
429
over 12,000 ft
323
533,000
24,739,000
203
Water & sand by target formation — Texas
Texas jobs ended in the trailing 12 months (3,219), formation from the RRC wellbore join —
1,964 named (61%). Three method changes this issue, and the rows they touch are not
row-comparable to last issue. (1) A depth > 0 gate was added to the RRC join: the join takes the deepest
filed bench record, and on 128 of the 2,224 joinable jobs every bench record carries a filed depth of zero,
which makes "deepest" arbitrary. That gate is what finally explains Grayburg — 16 of the 25 jobs whose
deepest string said GRAYBURG were depth-zero Reagan County horizontals that are plainly not Grayburg
completions. (2) San Angelo is no longer folded into San Andres; it is a Clear Fork-age sand and the
previous "SAN AN" prefix match was silently combining the two. (3) Delaware Mtn now includes the FORD /
DELAWARE and LAMAR benches. San Andres, Delaware Mtn and Penn therefore move on method, not on data.
Rows with fewer than 10 named jobs are dropped, which this cycle removes Grayburg (9), Strawn (7), Barnett (4), Penn (4).
And a correction we owe the Aug 17 issue: the Strawn row of 38 it printed cannot be reproduced at
any threshold. The entire 12-month Texas window contains seven disclosures whose deepest RRC bench string
contains "STRAWN", with or without the depth gate. That 38 was an artifact of that build, not a data move —
and the same goes for the Penn row of 20 in last issue, against four Pennsylvanian-aged strings here.
The 12-month window is the honest unit for this join: the RRC completion filing trails the frac by months, so a
28-day window could name only 6 of 51 jobs when it was tried. New Mexico is excluded (the OCD pool join was not
refreshed this cycle). lb/ft is the median of per-well sand ÷ perf span with a 2,000–20,000 ft gate, and
prints "—" where fewer than 10 wells in the row carry a perf record. Because the RRC filing trails the frac,
the named rows still skew toward operators that file promptly.
Formation
Jobs
Median water (bbl)
Median proppant (lbs)
Sand (lbs/ft)
Spraberry
782
550,000
24,735,000
2,004
Wolfcamp
639
559,000
24,395,000
2,265
Bone Spring
220
497,000
24,859,000
2,496
Dean
113
554,000
26,692,000
2,075
Clear Fork
109
493,000
17,657,000
1,727
Delaware Mtn
44
629,000
24,519,000
2,427
San Andres
23
507,000
23,132,000
2,245
Queen
10
695,000
29,339,000
—
Current conditions — fleets likely on location (inferred)
The rule, in full, because it matters more than the number: a pad is an operator plus a
surface location rounded to two decimal places of latitude and longitude (about a 1 km grid); a pad counts as
"likely on location" when its latest job end is within 1.5× that pad's own median gap between job end
dates. There is no minimum-days floor — that question is now closed, and the no-floor reading is what
the published rule text says. On that rule 76 pads pass this issue, the same 76 as last issue; recompute last
issue's window on this week's fuller data and the same rule returns 78, so the flat headline hides the usual
late-filing churn rather than a stalled basin.
Now the honest part. 36 of those 76 pads have a median inter-job gap of more than a
year, so on a strict reading of the rule they "pass" on a job-end date that is itself months old.
The freshest of them this week is a COG pad in Eddy County whose own median gap is
1,462 days. The table below is therefore drawn from the safer list: the 40 pads whose median gap is under a
year, not all 76. Read the "pad gap" column before you read the status either way.
Several large operators batch-date a whole pad's wells to one end date, which zeroes their measured gap and
drops them out of the green list entirely — so this view skews toward smaller, steadier programs. Disclosures lag
the frac by up to 30 days; treat this as a floor and a lead list, not a map. The "recently released" rows are the
freshest pads whose own cadence says the crew has moved on — and the top of that list this week is an
EOG pad in Lea County, 25 wells, last job end Aug 24, which is the filing blackout ending in one row.
Status
Operator
Service co.
County
Wells so far
Pad gap (d)
Last job end
🟢 Likely on location
Basin Oil and Gas
—
Winkler, TX
7
156
Aug 17
🟢 Likely on location
Basin Oil and Gas
—
Winkler, TX
5
189
Aug 13
🟢 Likely on location
Ring Energy
—
Ector, TX
4
30
Aug 11
🟢 Likely on location
Surge Energy
NexTier (Patterson-UTI)
Howard, TX
6
155
Aug 11
🟢 Likely on location
Basin Oil and Gas
—
Winkler, TX
8
89
Aug 10
🟢 Likely on location
Surge Energy
NexTier (Patterson-UTI)
Howard, TX
8
92
Jul 31
🟢 Likely on location
Burnett Oil
—
Eddy, NM
15
77
Jul 25
🟢 Likely on location
Blackbeard Operating
—
Crane, TX
6
105
Jul 23
🟢 Likely on location
Burnett Oil
—
Eddy, NM
6
204
Jul 22
🟢 Likely on location
Strata
—
Eddy, NM
2
165
Jul 18
⚪ Recently released
EOG
—
Lea, NM
25
1
Aug 24
⚪ Recently released
FireBird Energy II
—
Upton, TX
6
0
Aug 24
⚪ Recently released
XTO (ExxonMobil)
NexTier (Patterson-UTI)
Upton, TX
6
0
Aug 24
⚪ Recently released
Bayswater
—
Howard, TX
2
0
Aug 22
⚪ Recently released
XTO (ExxonMobil)
NexTier (Patterson-UTI)
Upton, TX
9
0
Aug 19
And read the top of the green list with the same
suspicion as the smaller-operators table above. The first three rows are all Basin Oil and Gas pads in
Winkler County, and Basin's disclosures carry a median water volume of about 4,000 bbl per job — two orders of
magnitude below a Permian frac. Whatever those filings describe, it is probably not a frac crew on location. The
rows are shown rather than dropped, because the rule put them there and hiding them would hide the weakness; but
the head of this list is the least trustworthy part of it, and the rule keys on filing cadence, not on job size.
Frac service companies — who's pumping for whom
Pressure pumper identified on 61.0% of the last 12 months' jobs
(2,948 of 4,833) —
from FracFocus supplier records directly, plus same-pad propagation (a labeled sibling well within the pad
names the crew, matched on a 3-decimal-place pad grid over the full disclosure history). Coverage is
flat like-for-like against last issue's 61.2%: the name list did not change this week, so the
movement is jobs rolling through the 12-month window, not method. ProFrac and FTS International are shown
separately, as published — the raw matcher folds FTSI and the old U.S. Well Services spelling into ProFrac,
and splitting them back out gives ProFrac 287 and FTS International 82.
KLX is deliberately excluded: it is coil and wireline work, not a frac fleet. The rows below sum to
3,059 against 2,948 identified jobs, because 111 jobs name
more than one pumper and are counted under each — the same disclosure the last three issues carried.
"Not identified" jobs are genuinely unlabeled in public data — largely self-sourcing operators and ProPetro's
current work — so shares are a floor, not a census.
Service co.
Jobs (12 mo)
Halliburton
1,292
NexTier (Patterson-UTI)
735
Liberty
584
ProFrac
287
FTS International
82
BJ Energy Solutions
44
SLB
35
Not identified
1,885
Implied frac fleets & drillout demand
Transparent math, two assumptions: a frac fleet turns ~5.6 wells per 28 days
(the basin-average throughput calibrated in the July issue: 398 wells ↔ 71 fleet-equivalents), and a
coil/workover unit drills out ~6 wells per month. Fleet-equivalents = settled wells/28d ÷ 5.6;
drillout units = wells/28d ÷ 6. Method note: too many operators batch-date pad filings for per-pad
cadence to be reliable, so a single basin-average throughput is used — simul-frac heavy operators'
true crew counts run lower than shown, and slower programs' higher. Basin total on this basis:
322.3 wells/28d ≈ 58 fleet-equivalents and ≈ 54 drillout units kept busy —
unchanged from last issue even though the settled pace eased 3.4 against the 325.7 we printed then
(down 1.0%), and 9.0 against the 331.3 that the same window recomputes to on this
week's filings. Either way the arithmetic still rounds to the same book, 58 / 54. (Last issue printed its
325.7 rounded to 326; the figures in this sentence are all carried to one decimal so they can be
compared.) And every figure here understates EOG, which is not on the settled list at all this week.
Operator
Wells / 28d (settled)
Implied fleet-equiv.
Implied drillout units
Diamondback
36.7
6.6
6.1
Occidental
26.3
4.7
4.4
XTO (ExxonMobil)
24.7
4.4
4.1
Devon
20.0
3.6
3.3
Permian Resources
19.7
3.5
3.3
Pioneer (ExxonMobil)
18.7
3.3
3.1
COG (ConocoPhillips)
17.0
3.0
2.8
Cimarex (Coterra/Devon)
15.0
2.7
2.5
Chevron
13.0
2.3
2.2
Apache
13.0
2.3
2.2
Mewbourne Oil
11.3
2.0
1.9
Matador
10.3
1.8
1.7
Blackbeard Operating
8.0
1.4
1.3
Civitas (SM Energy)
7.7
1.4
1.3
Avant Operating II
5.7
1.0
1.0
Estimated completion spend — run-rate per 28 days
The section returns — rebuilt model
This card was suspended for one issue while the model was rebuilt. It is back, on a different basis. The old model priced the pumping spread as sand-throughput days — the job's proppant divided by an assumed 500,000 lb of sand per day, charged at $180,000 a day, which implied about fifty pumping days on a median well and made pumping roughly 88% of the answer. That term is gone. Completions are priced per stage or per lateral foot, and the model now is too. It also gained the three lines it never had: drillout, flowback, and tubing/facilities.
The four issues that carried the old model (Aug 3 through Aug 24) have been reissued with corrected numbers. Their published paces and job counts are unchanged — only the cost was wrong.
Cost per median settled well
$4.24M
10,369 ft of completed lateral
Per completed lateral foot
$409
≈$709/ft all-in with drilling
Basin run-rate per 28 days
$1.37B
on this issue's 322.3 settled pace
Line
Basis
Rate
Median well
Pumping spread & stimulation service
$ / lateral ft
$125
$1,296,125
Wireline, plugs & pumpdown
$ / lateral ft
$50
$518,450
Chemicals & additives
$ / lateral ft
$20
$207,380
Site, rentals, supervision, fuel & other
$ / lateral ft
$30
$311,070
Proppant delivered
$ / lb on the job's sand
$0.016
$397,657
Water, produced / recycled
$ / bbl × 76.9% of the barrels
$0.50
$203,143
Water, fresh
$ / bbl × the remaining 23.1%
$1.10
$134,248
Drillout — coil or workover rig
flat $ / well
$350,000
$350,000
Flowback & early production
flat $ / well
$225,000
$225,000
Tubing, wellhead & surface facilities
flat $ / well
$600,000
$600,000
Total
10,369 ft of completed lateral
$409 / ft
$4,243,073
The basis. Completion cost is now built per lateral foot: four foot-priced lines — pumping spread and stimulation service, wireline/plugs/pumpdown, chemicals and additives, and site, rentals, supervision, fuel and other — at $225 per completed foot combined; two pass-throughs priced on the job's own measured volumes — proppant at $0.016/lb on the disclosed sand, and water split by the disclosed produced/recycled share; and three flat per-well lines — drillout, flowback and early production, and tubing, wellhead and surface facilities. The sand-throughput day term is gone entirely.
Where the lateral comes from, and what is wrong with it. The 10,369 ft is a perforated interval, not a drilled lateral, and it is not this issue's wells. It is the median perf span of the lagged cohort: Texas wells completed 6 to 12 months before this issue (n = 1,459, 78% TX coverage). It has to be, because RRC perforation records land 4 to 8 months after the frac — the direct join on this issue's own settled jobs is 1.4%, and on a 28-day window it is essentially zero. A current-window lateral does not exist. Worse, the few recent joins are biased large — prompt filers are big-job operators — so using them would overstate the median. New Mexico has no perforation source at all: dbf900 is a Texas RRC file, only 7 of 15,652 NM disclosures ever join, and NM is a third of every window. The foot priced here is therefore a Texas perforated foot applied basin-wide. For scale, the median permitted lateral this issue is 11,228 ft, 8% longer — the expected heel/toe standoff between drilled and perforated.
The sanity check that should have caught this. The suspended model would have printed about $10.2M on a ~10,369 ft well. Divide it by the lateral: ≈$981 per foot for the completion alone — more than the all-in drilling-and-completion cost per foot of every public Permian operator, which runs about $675–$1,035/ft (Permian Resources at $675–685/ft; Matador at $835–855/ft; Civitas Delaware at $880/ft). A completion-only number cannot exceed an all-in number. The rebuilt figure lands at $409/ft, implying roughly $709/ft all-in once about $300/ft of drilling is added — inside the operator band rather than above it. Standing rule: check any well cost per lateral foot against operator guidance before it ships.
Pricing the median understates the basin. The lateral distribution is bimodal, not a bell: on the well-covered cohort 38% of wells fall in the 10,000–11,000 ft (two-mile) band and 14% in the 15,000–16,000 ft (three-mile) band — roughly one job in seven is a three-miler. A median-only model prices those wells light. Holding these rates and moving only the lateral: a p25 10,058 ft well costs $4.17M and a p75 13,739 ft well costs $5.00M, against $4.24M at the median. The basin run-rate above is therefore a floor, not a midpoint.
Quantities. Median sand, water and produced-water share across this issue's 967 settled jobs (job end 42–126 days back) — the same population the section always priced, not the 28-day tile. 821 of the 967 disclosed sand.
Estimates, not invoices — a rate card, not an AFE. Rates: spend_rate_card_2026-09-01.xlsx, rates provisional pending sign-off. Quantities: FracFocus (proppant, water, water source) and RRC dbf900 perforation records, via build/spend_inputs.json. Jul 21 is unaffected: it used a per-stage model of its own, back-tested at ≈$424 per completed foot, which is where this rebuild independently lands.
What the wells actually made — IP90 after the frac
Nothing in this section moved, because none of its inputs did —
and both of those inputs are now overdue. The whole pipeline was rebuilt from scratch this week rather than
carried forward, and it reproduced every published number exactly: all 3,357 Texas wells and all 2,843 New
Mexico wells came back with identical oil and gas volumes — zero missing, zero mismatched, zero new. The
cohort itself grew by four New Mexico wells, and all four post-date the production scrape, so they carry no
volumes. Same method, same data, same figures — stated rather than silently reprinted.
Both production vintages are now stale, and one is past our own
refresh rule. The Texas side runs on the RRC Production Data Query dump of Jul 26 — 37 days, 5.3 weeks
old, past the five-week rule this newsletter set itself. A fresher Aug 27 cut does exist on the RRC
file server; it is a 3.65 GB archive, the server refuses byte-range requests so a broken transfer cannot be
resumed, and the build host cannot hold a single connection open long enough to move it. That is a plumbing
problem, not a data problem, and it needs a machine without the time limit. The New Mexico side runs on OCD
C-115 well-level volumes scraped on Aug 5 — now 27 days stale, because the OCD production route sits
behind a Cloudflare human-verification gate that a script cannot clear; re-confirmed again this morning.
Treat every figure below as a July-vintage read.
Wells frac'd July 2024 – Feb 2026, 6,200 with a clean 90-day production window
(2,843 New Mexico + 3,357 Texas). New Mexico: true well-level oil volumes from OCD C-115 filings. Texas:
oil + condensate from RRC lease-level filings, restricted to single-well leases — leases carrying exactly one
wellbore on the proration schedule, so lease volumes are well volumes with no pad allocation; that keeps 3,357 of
6,701 TX cohort wells (50%; the rest sit on multi-well leases). Where a well touches more than one single-well
lease, the lease with the largest windowed oil volume is used — the picker introduced last issue, unchanged.
All three months of a well's window must carry a filed row; wells with production predating the frac (refracs,
legacy leases) are excluded.
IP90 = oil over the first three reported production months ÷ 90 days. Median across all 6,200
wells: 692 bopd (NM 762, TX 638); median gas 1,250 mcfd.
Formation
Wells
Median IP90 (bopd/well)
bopd per 1,000 ft
Wolfcamp
2390
690
65
Bone Spring
2053
768
63
Spraberry
1209
639
52
Dean
175
726
55
Clear Fork
137
561
50
Barnett
73
602
62
Delaware Mtn
35
576
—
Yeso
35
225
—
San Andres
25
170
21
Penn
17
298
—
Strawn
12
536
51
Queen
11
438
42
Other / unreported
28
374
26
Operator
Wells
Median IP90 (bopd/well)
ExxonMobil (Pioneer/XTO)
1191
700
Devon (incl. Coterra)
622
895
EOG Resources
542
857
Mewbourne Oil
509
625
Occidental
413
997
Permian Resources
364
672
Diamondback
339
745
Chevron
301
611
ConocoPhillips (COG)
258
759
Matador Production
236
622
Per-1,000-ft columns are Texas-weighted: laterals come
from the RRC perf join (3,255 TX wells) and from OCD completion reports for only 62 NM wells, so a dash
means the lateral sample was under 10. Operator rows here use ownership roll-ups (unlike the rest of the issue)
because the production files are keyed to current operatorship. Note that EOG sits third on this table at 542
wells and 857 bopd — production filings never went dark even while its FracFocus paperwork did.
Who's ramping, who's easing off
Three signals per operator: settled pace (wells/28d, jobs ended 42–126 days back)
against its own prior three-month window (126–210 days back); TX permits issued in the
trailing 8 weeks (Jun 13 – Aug 7) against the prior 8 weeks (intent — leads the frac 6–12 months; arrows
at ±20%); and jobs filed in the last 28 days as a share of settled pace (a filing-freshness read,
not a slowdown detector — slow filers run low here every issue). The universe is every operator on the
settled-pace list above, i.e. 5.5 wells/28d or better. The permit columns are unchanged from
the last three issues — the RRC permit file is monthly and still ends Aug 7 — so a permit arrow here is
four weeks old and getting older. Read movement in the first column only. Hover a row for the figures.
Method change this issue: the "Reads as" rule changed, and that column is not row-comparable to last
issue. Through the Aug 24 issue an operator was called current on a filed-share threshold alone
(roughly 55% of settled pace filed in the last 28 days). That test mislabels both ends: it would have called
Diamondback — 18 filings and a newest job end 20 days back — a slow filer this week, while an operator
can clear the threshold on one late batch without being current at all. The rule is now two conditions:
the filing-currency flag must read current (newest job end inside 42 days) AND the filed share must be
at least 40% of settled pace. Applied to last issue's data it reproduces every Aug 24 row but one:
Apache, which had a current flag on a 50% share, printed as "a slow filer" on Aug 24 and would print as
current under the new rule. So do not compare this column row-by-row against last issue; the underlying pace,
permit and filing numbers are unaffected by the change.
Operator
Settled pace /28d
TX permits
Filed last 28d
Reads as
Diamondback
· 36.7vs 36.0 prior 3 mo
▼ 288 wk to Aug 7 · vs 79 prior 8 wk
18 (49%)
holding pace, and filings are current
Occidental
▼ 26.3vs 38.7 prior 3 mo
▼ 428 wk to Aug 7 · vs 102 prior 8 wk
0 (0%)
off on paper, and filing slowly — likely lag as much as a real slowdown
XTO (ExxonMobil)
· 24.7vs 25.3 prior 3 mo
—no TX permits in either window
11 (45%)
holding pace, and filings are current
Devon
· 20.0vs 21.0 prior 3 mo
—no TX permits in either window
13 (65%)
holding pace, and filings are current
Permian Resources
▼ 19.7vs 25.0 prior 3 mo
▼ 168 wk to Aug 7 · vs 44 prior 8 wk
12 (61%)
genuinely easing — filings are current, so the drop is real
Pioneer (ExxonMobil)
▼ 18.7vs 35.3 prior 3 mo
· 1088 wk to Aug 7 · vs 112 prior 8 wk
2 (11%)
off on paper, and filing slowly — likely lag as much as a real slowdown
COG (ConocoPhillips)
· 17.0vs 19.0 prior 3 mo
▲ 518 wk to Aug 7 · vs 29 prior 8 wk
13 (76%)
holding pace, and filings are current
Cimarex (Coterra/Devon)
· 15.0vs 17.3 prior 3 mo
▼ 08 wk to Aug 7 · vs 22 prior 8 wk
0 (0%)
holding pace; a slow filer, so recent weeks understate it
Chevron
▲ 13.0vs 10.0 prior 3 mo
▲ 188 wk to Aug 7 · vs 4 prior 8 wk
0 (0%)
pace up on settled filings; permit intake not following yet
Apache
· 13.0vs 15.3 prior 3 mo
▼ 188 wk to Aug 7 · vs 33 prior 8 wk
0 (0%)
holding pace; a slow filer, so recent weeks understate it
Mewbourne Oil
▼ 11.3vs 22.0 prior 3 mo
▲ 188 wk to Aug 7 · vs 7 prior 8 wk
4 (35%)
off on paper, and filing slowly — likely lag as much as a real slowdown
Matador
· 10.3vs 9.7 prior 3 mo
—no TX permits in either window
7 (68%)
holding pace, and filings are current
Blackbeard Operating
▲ 8.0vs 4.7 prior 3 mo
▼ 118 wk to Aug 7 · vs 36 prior 8 wk
0 (0%)
pace up on settled filings; permit intake not following yet
Civitas (SM Energy)
▼ 7.7vs 13.3 prior 3 mo
▼ 58 wk to Aug 7 · vs 9 prior 8 wk
0 (0%)
off on paper, and filing slowly — likely lag as much as a real slowdown
Avant Operating II
▲ 5.7vs 0.0 prior 3 mo
—no TX permits in either window
0 (0%)
pace up on settled filings; permit intake not following yet
How current is each operator's paperwork?
Every operator with 8+ Permian disclosures in the trailing 18 months, sorted
worst-first by how old its newest job-end date is. FracFocus has no enforced filing deadline, so this
is a paperwork-currency table, not an activity table — a dark filer can be busy and a current filer can be
idle. Late batches arrive constantly and revise settled pace upward afterward, which is why the lead
recomputes last issue's window every week — and this week that revision was +43 jobs.
Red = newest job over 120 days old (dark);
amber = 42–120 days (slow);
green = inside 42 days (current).
Split this issue: 19 dark / 22 slow / 26 current, against
last issue's 19 / 23 / 25. The dark count is flat but its membership is not, and the churn is worth naming:
EOG has left the red band for the green one (see below) and Bayswater cleared a four-month backlog
outright, from 123 days to 10; Black Swan and Kaiser-Francis drifted past 120 days in their place without
filing anything. Occidental also moved from amber to green on a single late batch, without filing a single job
inside the last 28 days — a good illustration of why this table is not an activity table.
Operator
Newest job on file
Filed last 28d
Settled pace /28d
Disclosures, 18 mo
OxyRock
2025-08-28 (369d)
0
0.0
92
Rockport Energy Solutions
2025-10-10 (326d)
0
0.0
9
Fourpoint Energy
2025-11-19 (286d)
0
0.0
17
Iron Orchard
2025-12-09 (266d)
0
0.0
8
Upcurve Energy
2025-12-26 (249d)
0
0.0
17
Vital Energy
2026-01-16 (228d)
0
0.0
20
IKE
2026-01-16 (228d)
0
0.0
21
Unitex
2026-02-05 (208d)
0
0.0
8
Hannathon
2026-02-16 (197d)
0
0.0
18
Paloma Permian Assetco
2026-02-25 (188d)
0
0.0
22
Hibernia Resources IV
2026-03-02 (183d)
0
0.0
26
Petro Hunt L L C
2026-03-25 (160d)
0
0.0
56
Marathon
2026-04-04 (150d)
0
0.0
11
Dallas
2026-04-08 (146d)
0
0.0
9
SM Energy
2026-04-12 (142d)
0
0.0
61
Manti Tarka Permian
2026-04-22 (132d)
0
0.0
14
Petroplex Energy
2026-04-26 (128d)
0
0.0
20
Black Swan
2026-04-27 (127d)
0
0.0
27
Kaiser-Francis
2026-05-01 (123d)
0
1.3
15
Double Eagle (DE Central)
2026-05-07 (117d)
0
2.0
116
Ovintiv
2026-05-08 (116d)
0
2.7
93
Discovery Natural Resources
2026-05-09 (115d)
0
1.7
35
PBEX Operations
2026-05-12 (112d)
0
1.0
16
Summit Petroleum
2026-05-25 (99d)
0
1.7
58
Tap Rock
2026-05-30 (94d)
0
0.7
24
BPX
2026-05-30 (94d)
0
3.0
95
Sabalo II Operating
2026-06-15 (78d)
0
2.3
23
3R
2026-06-21 (72d)
0
2.0
24
Crescent Energy
2026-06-22 (71d)
0
1.3
13
Triple Crown Resources
2026-06-23 (70d)
0
3.3
60
Jetta
2026-06-25 (68d)
0
2.3
12
Permian Deep Rock
2026-06-27 (66d)
0
1.7
26
HighPeak Energy
2026-07-03 (60d)
0
5.0
71
TRP Operating
2026-07-09 (54d)
0
3.0
28
RP Operating
2026-07-10 (53d)
0
1.3
10
Cimarex (Coterra/Devon)
2026-07-11 (52d)
0
15.0
307
Chevron
2026-07-13 (50d)
0
13.0
300
Blue Arrow
2026-07-13 (50d)
0
3.0
28
Avant Operating II
2026-07-17 (46d)
0
5.7
17
Strata
2026-07-18 (45d)
0
2.3
24
Greenlake Energy
2026-07-19 (44d)
0
0.3
30
Blackbeard Operating
2026-07-23 (40d)
0
8.0
153
Spur Energy Partners
2026-07-23 (40d)
0
4.7
53
Burnett Oil
2026-07-25 (38d)
0
0.0
13
Occidental
2026-07-26 (37d)
0
26.3
585
VTX Energy
2026-07-27 (36d)
0
4.0
39
Apache
2026-07-31 (32d)
0
13.0
236
Civitas (SM Energy)
2026-07-31 (32d)
0
7.7
161
Continental Resources
2026-08-01 (31d)
0
1.0
89
Mewbourne Oil
2026-08-05 (27d)
4
11.3
394
SEM
2026-08-07 (25d)
2
1.3
21
Pioneer (ExxonMobil)
2026-08-09 (23d)
2
18.7
728
Ring Energy
2026-08-11 (21d)
3
1.7
22
Surge Energy
2026-08-11 (21d)
2
0.7
84
Diamondback
2026-08-12 (20d)
18
36.7
743
BTA Oil Producers
2026-08-12 (20d)
2
3.0
55
Fasken Oil and Ranch
2026-08-12 (20d)
2
4.7
83
Devon
2026-08-14 (18d)
13
20.0
334
Basin Oil and Gas
2026-08-17 (15d)
3
1.7
54
COG (ConocoPhillips)
2026-08-18 (14d)
13
17.0
406
Permian Resources
2026-08-18 (14d)
12
19.7
389
Mack
2026-08-18 (14d)
1
1.0
9
Bayswater
2026-08-22 (10d)
4
0.0
34
XTO (ExxonMobil)
2026-08-24 (8d)
11
24.7
482
EOG
2026-08-24 (8d)
10
1.7
331
FireBird Energy II
2026-08-24 (8d)
2
3.0
99
Matador
2026-08-25 (7d)
7
10.3
206
The EOG callout, inverted. For weeks this
table has closed with the same paragraph: EOG's newest Permian disclosure was from December 2025, it was the
darkest large filer in the basin, and New Mexico showed it holding the biggest DUC stack in the Permian. As of
this week's file it is current — newest job end 2026-08-24, 8 days back — having filed fifteen
disclosures with 2026 job ends in one batch. It is the sixth most active filer of the last 28 days. Its settled
pace still reads 1.7/28d because only five of those jobs have aged into the 42–126 day window; that is a
timing artifact and it will unwind next issue. The standing lesson stands, just pointed the other way: paperwork
dark was never the same as inactive, and now we can see what was behind it. Two of the four names still worse
than 250 days — OxyRock at 369 and Rockport at 326 — are the ones to watch next.
Biggest jobs of the period
Jobs ended in the last 90 days (761 of them), ranked by total base water volume — a wider
window than the 28 days this table used until three issues ago, because at this filing vintage a 28-day window
holds too few settled monsters to rank honestly. Pad siblings dominate the top of any such list: a four- or
six-well pad filed on one end date will fill several rows with near-identical numbers, which is a batch
completion, not six record jobs. The BUTTERS 5-series in Midland County still owns the book, and it has
grown: XTO's 5I–5L filed since last issue and take four more of the top slots on water alone (they
disclose no proppant mass, hence the dashes). Pioneer's 5E–5H remain the sand leaders at
77.9–83.7M lb, and both operators are ExxonMobil. Behind the Butters pad, the biggest jobs are
FireBird Energy II's Beverly 4726 wells in Upton at 47.2–47.9M lb — FireBird is a Diamondback
subsidiary, shown as filed under this issue's no-roll-ups convention.
Operator
Well
County
Water (bbl)
Proppant (lbs)
Job end
XTO (ExxonMobil)
BUTTERS 5A 201H
Midland, TX
1,497,000
74,539,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5C 203H
Midland, TX
1,482,000
74,648,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5D 204H
Midland, TX
1,470,000
74,609,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5B 202H
Midland, TX
1,467,000
74,658,000
Jul 2
XTO (ExxonMobil)
BUTTERS 5J 210H
Midland, TX
1,456,000
—
Jun 13
XTO (ExxonMobil)
BUTTERS 5L 212H
Midland, TX
1,438,000
—
Jun 14
XTO (ExxonMobil)
BUTTERS 5K 211H
Midland, TX
1,431,000
—
Jun 14
XTO (ExxonMobil)
BUTTERS 5I 209H
Midland, TX
1,428,000
—
Jun 14
Pioneer (ExxonMobil)
BUTTERS 5E 205H
Midland, TX
1,408,000
83,714,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5H 208H
Midland, TX
1,400,000
81,452,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5G 207H
Midland, TX
1,399,000
81,906,000
Jun 10
Pioneer (ExxonMobil)
BUTTERS 5F 206H
Midland, TX
1,311,000
77,926,000
Jun 10
Where the permits are — the county map book
Every Texas horizontal drilling permit issued in the trailing 365 days that carries a
surface location — 3,831 permits across 25 counties, one page each, biggest county first. Each permit is
drawn as a line from its surface location toward the permitted bottomhole, so the map shows lateral
direction and length, not just a dot; 99.7% resolve to a line (10 fall back to a gray dot where the RRC
GIS has no wellbore geometry yet — a targeted re-query found no drilled wellbore for any of them, so a dot is
the correct rendering). Median drawn lateral this issue: 11,228 ft
(5th percentile 1,979 ft, 95th 20,596 ft, longest 23,736 ft). Lines are coloured by
the county's top-eight permit holders, everyone else gray. Tan lines underneath are Interstate, US and
state highways from TxDOT — locational context only, no county boundaries are drawn;
22 of the 25 pages carry highway geometry and 87 route shields are labelled. Kent, Sterling and Terry
genuinely have no IH/US/SH mainlane inside their frames. Permits lead the frac
by six to twelve months, so this is a map of where crews will be, not where they are.
Two honest caveats on this book. First, the permit file behind it is frozen at Aug 7 for a fourth issue,
so the trailing-365-day window is advancing against a static file: the point count has fallen 3,961 → 3,891
→ 3,831 over three issues purely because old permits age out and none arrive. That shrinkage is an artifact of
the stale file, not a collapse in Texas permitting. Second, we cannot assert the highway layer's currency
this week. The TxDOT Roadways service answered count: 0 to every query this morning, including a
bare unfiltered one, while its metadata still served normally — an empty or mid-republish layer. The highway
geometry drawn here is therefore the Jul 1, 2026 vintage carried forward and not re-verified. No county
frame grew this week, so nothing needed refetching, but the check itself could not be run.